Page 1 of 2

ULTRASONIC TEST REPORT


Inspection Date : May ,13,2019 Report no : IES/……../UT-..
Project Name : UT Equipment : Einstein-II DGS
Contractor : Range : 0-100
Location : Search unit : MBW 70 N4 (9MM,70˚,4 MHz)
Inspection Request No. : N/A Calibration block : IIW V2 Block, Reference block
Drawing Reference (S) : Main Beam & Sub Beam Welding Process : ARC WELDING.
Location Details : N/A Welding Prep : Double Vee
Comments : Sub-Beam Butt Joint Surface Condition : As Smooth
Couplent : Lube Oil
WELD INDI. THK X Y(yw) BPL(w) A d CLASS L DEPTH y Y-y RESULT REMARKS
IDENTIFICATION NO. mm mm mm mm. dB dB. mm. mm. mm. mm.
Joint no 8 - - - - 57.0 - - - - - Accepted Satisfactory
229C1 1(W)
Joint no 2(F) 8 - - - - 57.0 - - - - - Accepted Satisfactory
60 mm left ward To 39.02 42.09 70% 57.0 A 80 5.90 41.02 -2.0 Repair Find the defect IP,SL
Joint no 1(F)
right
184C1 Joint no 1(F) - - - - 57.0 - - - - - Accepted Satisfactory
Joint no 2(F) - - - - 35.0 - - - - - Accepted Satisfactory
Joint no3(F) - - - - 35.0 - - - - - Accepted Satisfactory

Code: CR- Crack IP-Incomplete Penetration IF– Incomplete Fusion SL- Slag P- Porosity EP-Excess Penetration CP- Cluster Porosity CON – Concavity BSR – Before Stress Relief ASR – After Stress Rel
TESTED BY: AUTHORITY approved
Name:Md.Shadikul Huq Shezan Name: Name:
ASNT Level –II (Ultrasonic Test)
Signature: Signature:

Date: 13/05/2019 Date: 13/05/2019


TEST CARRIED OUT AS PER CODE & STANDARD OF API Standard 1104

TESTED BY IES-INDUSTRIAL ENGINEERING SERVICES


House # 64, (1st Floor), Road # 06, Block # A, Sec # 12, Mirpur, Dhaka-1216, Phone : +8804477972245, 01710134359, 01711834576,
E-mail: iesbd2000@gmail.com, ahies.bd@gmail.comashik@iesndt.com, amit@iesndt.com, Web: www.iesndt.com
Page 2 of 2

WELD INDI. THK X Y(yw) BPL(w) A d CLASS L DEPTH y Y-y RESULT REMARKS
IDENTIFICATION NO. mm mm mm mm. dB dB. mm. mm. mm. mm.
Joint no - - - - 57.0 - - - - - Accepted Satisfactory
197C1 1(W)
Joint no 1(F) 20 - - - - 57.0 - - - - - Accepted Satisfactory
Joint no 2(F) 20 - - - - 57.0 - - - - - Accepted Satisfactory
Joint no 3(F) 20 - - - - 57.0 - - - - - Accepted Satisfactory
219C1 Joint no 1(F) - - - - 57.0 - - - - - Accepted Satisfactory
Joint no 2(F) 20 - - - - 57.0 - - - - - Accepted Satisfactory
Joint no 20 - - - - 57.0 - - - - - Accepted Satisfactory
3(F)
142B2 20 - - - - 57.0 - - - - - Accepted Satisfactory
Joint no 1(F)

Code: CR- Crack IP-Incomplete Penetration IF– Incomplete Fusion SL- Slag P- Porosity EP-Excess Penetration CP- Cluster Porosity CON – Concavity BSR – Before Stress Relief ASR – After Stress Rel
TESTED BY: AUTHORITY approved
Name:Md.Shadikul Huq Shezan Name: Name:
ASNT Level –II (Ultrasonic Test)
Signature: Signature:

Date: 13/05/2019 Date: 13/05/2019


TEST CARRIED OUT AS PER CODE & STANDARD OF API Standard 1104

TESTED BY IES-INDUSTRIAL ENGINEERING SERVICES


House # 64, (1st Floor), Road # 06, Block # A, Sec # 12, Mirpur, Dhaka-1216, Phone : +8804477972245, 01710134359, 01711834576,
E-mail: iesbd2000@gmail.com, ahies.bd@gmail.comashik@iesndt.com, amit@iesndt.com, Web: www.iesndt.com