Professional Documents
Culture Documents
1526 FFZ75-3.5 Diverter
1526 FFZ75-3.5 Diverter
1526
1
Security Guide
The manual covers matters needing attention for ensuring personal safety as well as protecting product and
connected equipment from damage.
All matters needing attention are given with symbols for clear warning and are also respectively described with
the following characters upon on the severity:
Notice
Ignoring proper prevention measures may cause injuries, deaths, serious personal injury or large property
loss.
Notice
Catch your attention on important information of the product or specific part during handling with the product
or files.
Competent person
No one but the competent person is authorized to assemble and operate the equipment. The competent
person shall be the person with certain experience on on-site well control and be able to assemble, perform
test run and operate the equipment according to specified safety practices and standards.
Correct way to use
Pay attention to the following:
Notice
The equipment and assemblies thereof shall be applied only to description in product catalogue or technical
manual, and shall be connected only with devices or assemblies that are approved by Shenkai or other
recommended manufacturers.
Safety first shall be complied for well control equipment. Any quick-wear metal and nonmetal part, in particular
the packer that influences the product safety and performance in test shall be replaced timely.
The product can work correctly and safely on the premise of correct transportation, storage, assembling,
installing, and being operated and maintained by the recommended mode.
Trademarks ○
R ○
R ○
R
16A-0111, , XK14-001-0002 .
Shanghai SK Petroleum & Chemical Equipment Corporation Ltd hereby declares that by check the contents of the
manual are consistent with the product and cannot in the nature of things be free from error, the consistency is
maximized. The contents of the manual will be reviewed at fixed period and modified in the next version. Suggestions
for improvements are highly welcomed.
Shanghai SK Petroleum & Chemical Equipment Corporation Ltd holds the copyright ○c 2015. No inform will be made for
any change.
Shanghai SK Petroleum & Chemical Equipment Corporation Ltd
Technical Support Department Contract No.
Customer Hotline: +86(21)64290467 Fax: +86(21) 64290467
Website: www.shenkai.com Postal Code: 201114
Catalogue
1 Overview ......................................................................................................................................................1
1 Overview
1.1 Model
The type of diverter consists of three group capitalization english letter and
numbers:
FFZ
Rating working pressure(MPa)
Bore dimension(cm)
Product type
Description Diverter
Model FFZ75-3.5
Bore 749.3mm(29 1/2″)
Rated working pressure 3.5MPa(500psi)
Hydrostatic test pressure 5.6MPa(800psi)
Hydraulic control rated
≤12MPa
working pressure
Recommended hydraulic
8.4-10.5MPa(1200-1500psi)
control operation pressure
Sealing range Φ127~Φ749.3
Closing capacity of
240L
hydraulic cylinder
Specification of hydraulic
Z1”(1 1/2”) ×2
control connection
Outside Dimension Φ1910×1798
Net weight 12620kg
Caution: An excessively high setting on the pressure regulator valve will have little effect on
the diverter closing time.
Locking Plate
Bonnet
Packing Unit
Body
Piston
Sleeve
Packing Unit
Piston
2
Manual of FFZ75-3.5 Diverter Rev.A0
3
Manual of FFZ75-3.5 Diverter Rev.A0
2 Parts list
Table 2-1 Parts List
4
Manual of FFZ75-3.5 Diverter Rev.A0
H33.100
No. Description Qty
Part No./Model
3 O-ring H06.04 1
8 Upper Seal Ring Piston H06.07 1
10 Inside Seal Ring, Piston H06.10 2
11 Lower Seal Ring, Piston H06.12 1
15 O-ring H06.11 1
22 Lower Wear Ring,Piston H06.08.03 1
23 Inside Wear Ring ,Piston H06.08.04 1
24 Upper Wear ring, Piston H06.08.05 1
5
Manual of FFZ75-3.5 Diverter Rev.A0
Table 3-1 Recommended value (Metric system) of connecting and tightening torque of stud and
screw
stud and screw torque/ N·m stud and screw torque/ N·m stud and screw torque/ N·m
6
Manual of FFZ75-3.5 Diverter Rev.A0
Table 3-2 Recommended value (British system) of connecting and tightening torque of stud and
screw
stud and screw torque/ ft·lb stud and screw torque/ ft·lb stud and screw torque/ ft·lb
7
Manual of FFZ75-3.5 Diverter Rev.A0
Warning: Lugs on the Diverter shell is used only for lifting the Diverter, rather than
lifting the BOP set (Diverter + drilling spool+ others)!
9
Manual of FFZ75-3.5 Diverter Rev.A0
10
Manual of FFZ75-3.5 Diverter Rev.A0
4.1.3 Disassemble the locking ring(Number 2). Disassemble the square locking rings
first, and then wedge locking rings.There is access holes in the shell that is eassy for
removing the locking ring.
Square
Wedge
locking ring
locking ring
4.1.4 Lift off the bonnet(Number 5) with lifting tools, and disassemble the anti-wear
plate (Number 6, disassemble only for replacement).
4.1.5 Screwing the lifting bolt into the packer, and lift it out with rope.
11
Manual of FFZ75-3.5 Diverter Rev.A0
4.1.6 Using oil pump or cotton cloth to suck oil out from the shell. Lift the piston
slowly with lifting tool.
4.1.7 Disassembly the screw(Number13) with extension allen wrench. Take sleeve
(Number 14)out.
12
Manual of FFZ75-3.5 Diverter Rev.A0
13
Manual of FFZ75-3.5 Diverter Rev.A0
14
Manual of FFZ75-3.5 Diverter Rev.A0
1. Examine whether there is burr or sharp corner in the part, if any, remove them, so
as to prevent the lip side of the sealing ring from being scratched. Please keep clean;
2. Slowly and steadily lift and assemble to prevent the parts from being blocked or
sealing ring from being damaged, as well as prevent foul from entering the sealing
surface;
3. Coat lubricating oil on surface of sealing ring when the sealing ring is assembled,
coat oil on the inner surface and the external surface of the matched sealing ring, in order
to assemble conveniently;
4. Pay attention to the direction of the lip-type sealing ring, and make sure that the
opening of the lip side faces the pressure direction.
5. Make sure that the sealing ring can pass through the oil hole smoothly without
scratching;
15
Manual of FFZ75-3.5 Diverter Rev.A0
16
Manual of FFZ75-3.5 Diverter Rev.A0
shall be replace. d) Check the sealing face of the shell, bonnet and piston, if
there is any concaves, flaws or the parts is wearing seriously, the parts shall
be remanufactured
2、Hardness testing shall be carried out on the pressure-containing parts and the
pressure-controlling parts such as shell and bonnet. If the hardness is abnormal(>
HRC22), contacting manufacturer is necessary.
Repair and remanufacture parts shall be carried out according to API Spec 16A
appendix B. Replacement of parts shall be design and manufacturing by the OEM. After
checking the Bop, if the pressure-containing parts need to be welded to restore the
performance, the bop is not suitable for easy maintenance in the field, must be
remanufactured by the API Spec 16A qualified remanufacturer or authorized
remanufacturer.
17
Manual of FFZ75-3.5 Diverter Rev.A0
5 Preservation procedures
Prior to shipping and storage, all equipment should avoid direct sunlight, rain and
snow shower, keep them away from acid and alkali, organic solution etc, which would
affect the quality of rubber material.
19
Design by:
(Technical engineer)
Audited by:
(Chief engineer)
20
Rev:A0