Gutter Details Cross Bracing Conn. Detail: Office of The District Engineer

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

17.

00m

TURN BUCKLE MUST BE INSTALLED


BESIDE THE TOP CHORD OF STRUT 1
TURN BUCKLE MUST BE INSTALLED
BESIDE THE TOP CHORD OF STRUT 2

TURN BUCKLE MUST BE INSTALLED


ON TOP CHORD OF TRUSS

GIRT-1

GA. 26 PRE-PAINTED
CORRUGATED G.I. SHEET
16mmØ STEEL CROSS-BRACING
W/ STANDARD TURN BUCKLE 12mmØ PLAIN ROUND BAR
SAG ROD W/ 2 NUTS & WASHERS
AT ENDS
1.6mm THK. x 20mm x 50mm x
100mm C-PURLINS
TRUSS TOP CHORD TRUSS TOP CHORD
(SEE DETAIL)

16mmØ STEEL CROSS-BRACING


GA. 24 PRE-FORMED
TRUSS (TOP CHORD)

7.2" RIBBED TYPE PRE-PAINTED


G.I. GUTTER GA. 26 ROOFING PANEL FASCIA
GIRT 1
BOARD

3"Ø G.I WIRE GUTTER GUARD


STRAINER 25mmØ B.I PIPE S-10
STANDARD TURN BUCKLE FASCIA FRAME
(FULL WELD)
175mmØ B.I. PIPE COLUMN IN 3" PVC PIPE DOWNSPOUT
(FULL WELD)
QDE PAINT W/ EPOXY PRIMER

CROSS BRACING CONN. DETAIL GUTTER DETAILS


DRAWN NOT TO SCALE SCALE 1:15MTS

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X MABELLE S. DESABILLE
CONSTRUCTION OF MULTI-PURPOSE ARCHITECT II
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE S 19
BUILDING (COVERED COURT)
CROSS BRACING CONNECTION DETAIL DESIGNED: RAEMAN BHEE M. APUGAN HAROLD C. CAERMARE RONALD T. GEMPISAO MARIVEL FRANCES L. ONG, A.E.R.
GUTTER DETAILS ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER BINUANGAN CENTRAL SCHOOL, BINUANGAN, DATE: DATE: DATE: DATE:
6 9 26
Brgy. 26, Gingoog City MISAMIS ORIENTAL JOSHUA B. DELA PE A
ENGINEER II
A B
19.40m

1.20m 17.00m 1.20m

0.55m
25MM Ø B.I. PIPE SCHED. 10
TOP CHORD (FULL WELD)

25MM Ø B.I. PIPE SCHED. 10


BOTTOM CHORD (FULL WELD)

3.25m
0.40m0.40m0.40m0.40m0.40m0.40m0.40m
25MM Ø B.I. PIPE SCHED. 10

4.02m
WEB MEMBER (FULL WELD)
25mmØ B.I PIPE S-10
TOP CHORD (FULL WELD)

25mmØ B.I PIPE S-10

0.76m
WEB MEMBER (FULL WELD)

25mmØ B.I PIPE S-10


BOTTOM CHORD (FULL WELD)

0.76m
ELEVATION SECTION

1 ARC FASCIA FRAME DETAIL


6 9 SCALE 1:30MTS

0.300m
1 21"
0.025m
25mmØ B.I PIPE S-10
m 0.40m 0.40m 0.40m 0.40m
40 TOP (FULL WELD)
0.
0.025m
2.146" 7.2"
0.050m

0.025m

7.2" RIBBED TYPE PRE-PAINTED


0.050m

0.76m
0.76m

GA. 26 ROOFING PANEL FASCIA


BOARD
0.40m

0.36m
0.225m

FASCIA FRAME
2.146"

25mmØ B.I PIPE S-10 25mmØ B.I PIPE S-10


0.050m

WEB MEMBERS (FULL WELD) BOTTOM (FULL WELD)

0.050m
0.082m 0.117m

3 FASCIA BOARD DETAIL 2 FRONT & REAR FASCIA FRAME DETAIL


GUTTER BLOW-UP DETAIL 6 9 DRAWN NOT TO SCALE 6 9 SCALE 1:20MTS

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X MABELLE S. DESABILLE
CONSTRUCTION OF MULTI-PURPOSE ARCHITECT II
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE S 20
BUILDING (COVERED COURT)
ARC FASCIA FRAME DETAIL DESIGNED: RAEMAN BHEE M. APUGAN HAROLD C. CAERMARE RONALD T. GEMPISAO MARIVEL FRANCES L. ONG, A.E.R.
FASCIA BOARD DETAIL ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER BINUANGAN CENTRAL SCHOOL, BINUANGAN, FRONT & REAR FASCIA FRAME DETAIL DATE: DATE: DATE: DATE:
7 9 26
Brgy. 26, Gingoog City MISAMIS ORIENTAL JOSHUA B. DELA PE A
ENGINEER II
A B
19.40m

0.60m 0.60m 17.00m 1.20m

0.55m
50MM Ø B.I. PIPE SCHED. 40
TOP CHORD (FULL WELD)

STRUT-1

50MM Ø B.I. PIPE SCHED. 40

3.50m
STRUT-2 BOTTOM CHORD (FULL WELD) STRUT-2

2.95m
0.7083m 0.7083m 0.7083m 0.7083m 0.7083m 0.7083m 0.7083m
40MM Ø B.I. PIPE SCHED. 40
WEB MEMBER (FULL WELD)
2.45m

40MM Ø B.I. PIPE SCHED. 40


WEB MEMBER (FULL WELD)
3.74m

FASCIA FASCIA
FRAME FRAME
ELEVATION

2.30m
GIRT-1
1.30m

80MM Ø B.I. PIPE SCHED. 40


CAMBER (FULL WELD)

1 ARC TRUSS 1 DETAIL


7 9 SCALE 1:35MTS

2 3

40mmØ B.I PIPE S-40 50mmØ B.I PIPE S-40 40mmØ B.I PIPE S-40
0.60m 0.60m 0.60m 0.55m 0.55m 0.55m TOP (FULL WELD) 50mmØ B.I PIPE S-40
WEB MEMBERS (FULL WELD) TOP (FULL WELD)
TOP CHORD (FULL WELD)

0.55m
0.60m

0.76m
40mmØ B.I PIPE S-40
WEB MEMBER (FULL WELD)

25mmØ B.I PIPE S-10 40mmØ B.I PIPE S-40 50mmØ B.I PIPE S-40
50mmØ B.I PIPE S-40 WEB MEMBERS (FULL WELD) BOTTOM (FULL WELD)
BOTTOM CHORD (FULL WELD)
BOTTOM (FULL WELD)

ARC TRUSS 1 SECTION

GIRT 1 DETAIL STRUT 1 DETAIL

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X MABELLE S. DESABILLE
CONSTRUCTION OF MULTI-PURPOSE ARCHITECT II
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE S 21
BUILDING (COVERED COURT) ARC TRUSS 1 DETAIL
DESIGNED: RAEMAN BHEE M. APUGAN HAROLD C. CAERMARE RONALD T. GEMPISAO MARIVEL FRANCES L. ONG, A.E.R.
GIRT 1 DETAIL ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER BINUANGAN CENTRAL SCHOOL, BINUANGAN,
STRUT 1 DETAIL DATE: DATE: DATE: DATE:
8 9 26
Brgy. 26, Gingoog City MISAMIS ORIENTAL JOSHUA B. DELA PE A
ENGINEER II
A B
19.40m

0.60m 0.60m 17.00m 1.20m

0.55m
50MM Ø B.I. PIPE SCHED. 40
TOP CHORD (FULL WELD)

STRUT-1

50MM Ø B.I. PIPE SCHED. 40

3.50m
STRUT-2 BOTTOM CHORD (FULL WELD) STRUT-2

2.95m
0.7083m 0.7083m 0.7083m 0.7083m 0.7083m 0.7083m 0.7083m
40MM Ø B.I. PIPE SCHED. 40
WEB MEMBER (FULL WELD)

FASCIA FASCIA
FRAME ELEVATION FRAME

GIRT-2 GIRT-2
A A

B B

1 ARC TRUSS 2 DETAIL C


C ISOMETRIC VIEW

50mmØ B.I PIPE S-40


TOP CHORD (FULL WELD)
8 9 SCALE 1:35MTS
0.55m 0.55m 0.55m 0.55m
25mmØ B.I PIPE S-10
TOP (FULL WELD)

0.76m
40mmØ B.I PIPE S-40
B WEB MEMBER (FULL WELD)

0.55m
A

C
3 4 50mmØ B.I PIPE S-40
BOTTOM CHORD (FULL WELD)

ELEVATION-A 25mmØ B.I PIPE S-10 25mmØ B.I PIPE S-10

50mmØ B.I PIPE S-40 100mmØ B.I PIPE S-40


WEB MEMBERS (FULL WELD) BOTTOM (FULL WELD)
ARC TRUSS 2 SECTION
0.70m 0.70m 0.70m 0.70m 0.70m WEB MEMBERS (FULL WELD) TOP (FULL WELD)

25mmØ B.I PIPE S-10


0.55m 0.55m 0.55m 0.55m
TOP (FULL WELD)
0.70m

0.55m
C B

100mmØ B.I PIPE S-40


BOTTOM (FULL WELD) ELEVATION-B 25mmØ B.I PIPE S-10 25mmØ B.I PIPE S-10
WEB MEMBERS (FULL WELD) BOTTOM (FULL WELD)

25mmØ B.I PIPE S-10


0.55m 0.55m 0.55m 0.55m
TOP (FULL WELD)

0.55m
GIRT 2 DETAIL B C

STRUT 2 DETAIL
ELEVATION-C 25mmØ B.I PIPE S-10 25mmØ B.I PIPE S-10
WEB MEMBERS (FULL WELD) BOTTOM (FULL WELD)

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X MABELLE S. DESABILLE
CONSTRUCTION OF MULTI-PURPOSE ARCHITECT II
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE S 22
BUILDING (COVERED COURT) ARC TRUSS 2 DETAIL
DESIGNED: RAEMAN BHEE M. APUGAN HAROLD C. CAERMARE RONALD T. GEMPISAO MARIVEL FRANCES L. ONG, A.E.R.
GIRT 2 DETAIL ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER BINUANGAN CENTRAL SCHOOL, BINUANGAN,
STRUT 2 DETAIL DATE: DATE: DATE: DATE:
9 9 26
Brgy. 26, Gingoog City MISAMIS ORIENTAL JOSHUA B. DELA PE A
ENGINEER II