The document lists 39 scope items for erection activities up to boiler registration. It assigns responsibility for each item to either the customer, TECC (erection vendor), or both. Key responsibilities include offloading and storing materials, construction planning and drawings, quality assurance, testing, permits and approvals, and obtaining the boiler registration. The customer is responsible for the site and utilities, while the erection vendor handles labor, equipment, materials management, safety compliance and testing. Both parties must approve construction plans.
The document lists 39 scope items for erection activities up to boiler registration. It assigns responsibility for each item to either the customer, TECC (erection vendor), or both. Key responsibilities include offloading and storing materials, construction planning and drawings, quality assurance, testing, permits and approvals, and obtaining the boiler registration. The customer is responsible for the site and utilities, while the erection vendor handles labor, equipment, materials management, safety compliance and testing. Both parties must approve construction plans.
The document lists 39 scope items for erection activities up to boiler registration. It assigns responsibility for each item to either the customer, TECC (erection vendor), or both. Key responsibilities include offloading and storing materials, construction planning and drawings, quality assurance, testing, permits and approvals, and obtaining the boiler registration. The customer is responsible for the site and utilities, while the erection vendor handles labor, equipment, materials management, safety compliance and testing. Both parties must approve construction plans.
The document lists 39 scope items for erection activities up to boiler registration. It assigns responsibility for each item to either the customer, TECC (erection vendor), or both. Key responsibilities include offloading and storing materials, construction planning and drawings, quality assurance, testing, permits and approvals, and obtaining the boiler registration. The customer is responsible for the site and utilities, while the erection vendor handles labor, equipment, materials management, safety compliance and testing. Both parties must approve construction plans.
LIST OF SCOPE OF ERECTION ACTIVITIES UPTO BOILER REGISTRATION
SR SERVICES Custo TECC Erect mer Vendor 1. Offload, proper stacking and storing of TBW/ESD/TECC supplied materials at work site 2. Receive and check TECC supplied materials and issue receiving reports, excess, shortage and damage reports as required. 3. Manpower, tools & tackles and equipment (forklifts, cranes, etc.) 4. Provide graded area for lay down with utilities 5. Special storage of items requiring climatised storage as advised and specified by TBW/ESD/TECC Engr. 6. Adequate Area lighting in lay down areas, portable low volt hand lamps (24-V supply) 7. Provision of safety equipment to all personnel. (Hard Hats, safety Belts, working platforms / scaffoldings or staging closely boarded, tested equipments / chains / ropes, coveralls etc). 8. Construction power supply with in battery limit. 9. Distribution of power for construction work, including distribution board with main switch fuse unit & cables. 10. Construction and drinking water supply within battery limit 11. Construction of stores shed, wherever necessary 12. Dismantling of temporary structure, Collect waste from storage areas and dispose of in scrap yards. 13. Provision of accommodation for contractor/ sub-vendor staff 14. Overall security within Plant boundaries 15. Security within work site 16. Supply of on -site transportation 17. Issue of materials from store yard/stores 18. Materials Control (provision and maintenance of materials inventory) in warehouse/laydown areas. 19. Issue final reconciliation reports for all Owner supplied materials. 20. Construction planning. 21. Approval of construction plan. 22. Monthly progress reports 23. Provision of construction and fabrication drawings. 24. Provision and verification of as built drawings. 25. Compliance with Local regulations requirements, statutory formalities, labour licence, workmen compensation policy, payment of PF/ESI, medical, insurance of employees, safety aspects, etc. 26. Supply of tools and consumables i.e. electrodes, filler wire, gases( oxygen,acetylene, argon,nitrogen),grinding wheels, etc. 27. Supply of Tube Expander 28. Supply of craneage for proper handling & transport, as required 29. Provision of all test facilities and materials 30. QA/QC 31. QA/QC audits (if appropriate) 32. All tests such as x-ray, gamma-ray, ultrasonic test, liquid dye-penetrant, blowing test, hydraulic and smoke test / leak test 33. Provision of land for labour camp / sheds 34. Chemicals for Alkali Boilout 35. Supply of any material forming permanent part of the equipment 36. Payment of local taxes , levies, permits etc for construction 37. Work Permit, Entry Permit, Hot Work Permit. 38. Statutory Fees for Clearances. 39. IBR provisional approval & steam test & obtaining registration no., etc.