0.4 mm THK.

PREPAINTED,
LONGSPAN, G.I. ROOFING

300 x 600 (mm) TILE FINISHED


(SIMULATED BRICK)

SENIOR CITIZENS' TOP OF ROOF BEAM


OFFICE

3 200
FLOOR LINE

VARIES
GRND. LINE

FRONT ELEVATION RIGHT SIDE ELEVATION LEFT SIDE ELEVATION


SCALE 1:100 M SCALE 1:100 M SCALE 1:100 M

5 000 1 500 1 750 1 750


2 575
REAR ELEVATION CROSS SECTION
SCALE 1:100 M SCALE 1:100 M
W
1 800

4 W
SHE / PWD HE / PWD 4
W D
1 2
D D
3 3
W
3
3 000

1 600
DRYWALL
PARTITION W
2 800 800
2 500

OFFICE
6 000

SPACE 800
ASSEMBLY AREA 900 6 EQ. PARTS = 3 000 2 EQ. PARTS = 1 000 2 EQ. PARTS = 800 2 EQ. PARTS = 800

D
350

2
3 000

2 000

600
W
2

1 000
1 200

1 200
D
W 1
1
2 100

2 100

2 100
2 000

PORCH

1 500
1 100
RAMP

900

900
UP STEEL CASEMENT WINDOW W/ 3.0 mm THK.
BRONZE GLASS & 12 mm SQ. BAR GRILLES STEEL CASEMENT WINDOW W/ 3.0 mm THK.
BRONZE GLASS & 12 mm SQ. BAR GRILLES
STAIRS UP
5 000 5 000
D D D W W W W
1 2 3 1 2 3 4
FLOOR PLAN SWING WINDOW W/ 1/4" THK. BRONZE GLASS
ON ANALOK FINISHED ALUM. FRAMES
SOLID PANEL DOOR W/
2" x 6" DOOR JAMBS
SOLID PANEL DOOR W/
2" x 6" DOOR JAMBS
SCALE 1:100 M

DETAILS OF DOORS AND WINDOWS


SCALE 1:40 M

PROJECT TITLE AND LOCATION SHEET CONTENTS PREPARED CHECKED SUBMITTED RECOMMENDED APPROVED SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JJJJJJJ

REGION VII
CONSTRUCTION OF
EEEE

FOUNDATION PLAN
MULTI-PURPOSE CENTER 2ND FLOOR FRAMING PLAN
TYPICAL BEAM DETAIL
(SENIOR CITIZENS' OFFICE) R.C. SLAB DETAIL
BEN ALDEN R. SERNA
BOHOL FIRST DISTRICT ENGINEERING OFFICE WILFREDO C. FLORES, JR. LEONCIA R. BAGOL LUCIO L. BAGOL FRANCIS ANTONIO L. FLORES
PUNTA CRUZ, MARIBOJOC ARCHITECT II ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION ASST. DISTRICT ENGINEER DISTRICT ENGINEER
NEW CAPITOL SITE, TAGBILARAN CITY
S
6.0 mm THK. FIBER CEM. BD.
6.0 mm THK. FIBER CEM. BD. ON LIGHT METAL FRAMES
ON LIGHT METAL FRAMES

CONCRETE MOULDING

R.C. ROOF BEAM SENIOR CITIZENS'


OFFICE
10 mm Ø BARS SPCD.
@ 200 mm O.C.

500
200

200
1 -12 mm Ø BAR
100
400

ENTRANCE DETAIL
200

SECTION THRU "S" SCALE 1:40 M

6.0 mm THK. FIBER CEM. BD. SCALE 1:15 M


2 900 TO FLOOR LINE

ON LIGHT METAL FRAMES

CEILING SECTION "X" 5 mm THK. x 150 mm


x 400 mm BASE PLATE
SCALE 1:40 M

5 mm THK. STEEL BRACKET

12 mm Ø x 75 mm
STAINLESS BOLT

50 mm Ø STAINLESS
PIPE GRAB RAIL

SCH. 40, 38 mm Ø G.I.


PIPE HANDRAIL
6.0 mm THK. FIBER CEM. BD.
ON LIGHT METAL FRAMES
SCH. 40 , 38 mm Ø G.I. PIPE RAIL
SUPPORT SPCD. AS SHOWN
12 mm Ø x 75 mm
PREFAB. PVC

900
PORCH FLOOR LINE ANCHOR BOLT
CEILING VENT

700
250
1
12
MOVABLE GRAB
400 400

ELEVATION RAIL DETAILS


400

SCALE 1:15 M

1 500 5 100

1 300

50 mm Ø STAINLESS TUBE
(FIXED GRAB RAIL)
400

MOVABLE GRAB RAIL

X
2 600

400 x 400 (mm)


CERAMIC TILES

160
1 300
400

400

825

650
400 x 400 (mm)

800
CERAMIC TILES
400 400 4 050 400

1 500

100
1 500 3 000 2 000 FIXED GRAB RAIL
A

700
125 800
GROOVES
PLAN
RAMP AND STAIRS DETAIL 10 mm DROP

REFLECTED CEILING PLAN SCALE 1:50 M


PLAN ELEVATION AT "A"
SCALE 1:100 M

TOILET DETAILS
SCALE 1:40 M

PROJECT TITLE AND LOCATION SHEET CONTENTS PREPARED CHECKED SUBMITTED RECOMMENDED APPROVED SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JJJJJJJ

REGION VII
CONSTRUCTION OF
EEEE

FOUNDATION PLAN
MULTI-PURPOSE CENTER 2ND FLOOR FRAMING PLAN
TYPICAL BEAM DETAIL
(SENIOR CITIZENS' OFFICE) R.C. SLAB DETAIL
BEN ALDEN R. SERNA
BOHOL FIRST DISTRICT ENGINEERING OFFICE WILFREDO C. FLORES, JR. LEONCIA R. BAGOL LUCIO L. BAGOL FRANCIS ANTONIO L. FLORES
PUNTA CRUZ, MARIBOJOC ARCHITECT II ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION ASST. DISTRICT ENGINEER DISTRICT ENGINEER
NEW CAPITOL SITE, TAGBILARAN CITY
10 mm Ø LONGITUDINAL
BARS,SPCD. AS SHOWN
150 mm THK. CHB ON ALL EXTERIOR WALL W/ 150 mm THK. CHB ON ALL EXTERIOR WALL W/ 12 mm Ø HOR BAR @ 10 mm Ø HOR BAR @
12 mm Ø BARS @ 600 mm O.C., BW 12 mm Ø BARS @ 600 mm O.C., BW EVERY 3RD LAYER OF CHB EVERY 3RD LAYER OF CHB
PORCH FLOOR LINE
350 350
6" THK CHB 4" THK CHB
CONC. FLOOR SLAB CONC. FLOOR SLAB
3 -20 mmØ CONT. TOP BAR 2 -20 mmØ CONT. TOP BAR

175
12 mm Ø VERT BAR @ 10 mm Ø VERT BAR @
600mm oc 600mm oc

175
NAT.GRND.LINE NAT.GRND.LINE
300

300
3 - 12 mm Ø CONTINUOUS BARS W/ 3 - 10 mm Ø CONTINUOUS BARS W/ FIN. GRADE LINE
10 mm Ø TIES @300mm OC 10 mm Ø TIES @300mm OC

400

400
200

200
10mmØ STIRRUPS; 1 @ 50, 2 @ 10mmØ STIRRUPS; 1 @ 50, 2 @

400
100, REST @ 200 mm O.C. 3 -20 mmØ CONT. BOTTOM BAR 100, REST @ 200 mm O.C. 2 -20 mmØ CONT. BOTTOM BAR 10 mm Ø TRANSVERSE BARS,
200 200

200
SPCD. @ 300 mm O.C.
400 400

RCTB-1 RCTB-2 3 - 12 mm Ø TRANSVERSE BARS,


WF-1 WF-2 100

400
W/ 10 mm Ø TIES SPCD. @ 300 mm O.C.

WALL FOOTING DETAILS R.C. STAIRS DETAIL


RCTB (TIEBEAM) DETAIL SCALE 1:15 M SCALE 1:20 M

SCALE 1:20 M

1 000

100 mm THK. CHB WITH 10 mm Ø


350 300 350 BARS SPCD. @ 600 mm O.C., BW

800
10 000
275 100 150 275

350
5 000 1 500 1 750 1 750

400
275 150 100 275
F2/C2 F2/C2

1 000

300
10 mm Ø TEMP. BARS SPCD. WF-1

150
@ 400 mm O.C., BOTHWAYS

800

250
350
1 800

2 - 10 mm Ø LONGITUDINAL BARS W/
200
WF-1
WF-1

10 mm Ø TIES SPCD. @ 300 mm O.C.


WF-2

F1/C1 F1/C1 F1/C1


7 - 16 mm Ø MATTING
RCTB-1 RCTB-1 250
BARS EACHWAY
WF-3 DETAIL
RCTB-2
RCTB-2

5 - 16 mm Ø MATTING SCALE 1:20 M


3 000

BARS EACHWAY

LATERAL TIES
10MMØ: 3 SETS
F1/C1 F1/C1 1-50MM, 10-100MM, 3 - 16 mm Ø VERTICAL BARS
6 000

5-150MM, REST @ 4 - 20 mm Ø W/ 10 mm Ø TIES SPCD. @ 2 @ 50,


100 mm THK. CONCRETE VERTICAL BARS 2 @ 100, 2 @ 150, REST @ 200 mm O/C/
200MM TO CL
SLAB ON FILL
RCTB-2

RCTB-2

3 000

F1/C1 F1/C1 F1/C1


RCTB-1 RCTB-1
1 500 5 100

1 000
WF-1

WF-1

2 000

WF-3

600
WF-1

300
WF-3

250
F1/C1 F1/C1
GRAVEL BEDDING GRAVEL BEDDING
WF-3

WF-3
5 000 5 000

FOUNDATION PLAN F1 / C1 DETAIL F2 / C2 DETAIL

WF-3
WF-3
SCALE 1:100 M SCALE 1:30 M SCALE 1:30 M

WF-3

PLAN
RAMP AND STAIRS DETAIL
SCALE 1:50 M

PROJECT TITLE AND LOCATION SHEET CONTENTS PREPARED CHECKED SUBMITTED RECOMMENDED APPROVED SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JJJJJJJ

REGION VII
CONSTRUCTION OF
EEEE

FOUNDATION PLAN
MULTI-PURPOSE CENTER 2ND FLOOR FRAMING PLAN
TYPICAL BEAM DETAIL
(SENIOR CITIZENS' OFFICE) R.C. SLAB DETAIL
BEN ALDEN R. SERNA FRANCIS ANTONIO L. FLORES
BOHOL FIRST DISTRICT ENGINEERING OFFICE WILFREDO C. FLORES, JR. LEONCIA R. BAGOL LUCIO L. BAGOL
PUNTA CRUZ, MARIBOJOC ARCHITECT II ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION ASST. DISTRICT ENGINEER DISTRICT ENGINEER
NEW CAPITOL SITE, TAGBILARAN CITY
10 mm THK. x 200 X 300 mm FULL WELD
BASE PLATE FROM TRUSS / BEAM
TRUSS MEMBER SIZES:
TOP CHORD : 2 - 5.0 mm THK. x 50 mm x 50 mm ANGLE BAR BOTTOM CHORD
BOTTOM CHORD : 2 - 5.0 mm THK. x 50 mm x 50 mm ANGLE BAR
WEB MEMBERS : 2 - 5.0 mm THK. x 38 mm x 38 mm ANGLE BAR
300
3.0 mm THK. x 25 x 25 mm
ANGLE BARS

R.C. COLUMN

300
4 - 16 mm Ø x 250
mm BOLTS
HT-6
HT-3 HT-4 HT-7
HT-5
FASCIA FRAME DETAIL
SCALE 1:15 M

TRUSS ANCHORAGE DETAIL


SCALE 1:15 M

TRUSS-3 TRUSS-4
HT-2 1 - 5.0 mm THK. x 50 mm x 50 mm
ANGLE BAR

10 mm Ø x 25 mm BOLT W/ NUT
(WELDED TO SAGROD)

10 mm Ø x DEF. BAR SAGROD

FROM TRUSS
TOP CHORD

TRUSS-2 HT-1 5.0 mm THK. x 50 x 50 mm


ANGLE BAR CLIP
TRUSS-1
DETAIL OF TRUSSES
SCALE 1:75 M

PURLIN SPOT DETAIL


TRUSS BRACE DETAIL SCALE 1:15 M

SCALE 1:30 M

10 000

800 3 500 800 400 5 000 5 000

1 200 1 500 2 000 3 000 1 750 1 750 3 500

TRUSS BRACE RB - 2
800

RB - 2

RB - 2

1 800
HT-7

1 800

RB - 1 RB - 1 L
H
1 200

1 200
HT-4

T-

200
6

HT-4
2-16 mm Ø
H

3 000

3 000

300
T-

RB - 2
RB -2
6

3 500

2-16 mm Ø
SAGROD
3 000

SAGROD
10 mm Ø STIRRUPS, SPCD. @ 4 @ 50,
2 000

6 @ 100, REST @ 150 mm O.C. SECTION


6 000

HT-1 HT-1
TRUSS-1

TRUSS-1

RB - 2

RB - 2
3 000

3 000
2 000

RB-2
3 000

3 000

RB - 1 RB - 1

HT-4
RB - 2

RB - 2

2 000
TRUSS-4 L
HT-4

200 200
L/4 L/4
2 000

2 000

SAGROD SAGROD RB - 1

3-16 mm Ø 2-16 mm Ø

300

300
2.0 mm THK. x 50 x 100 mm CEE TRUSS-3 2-16 mm Ø 3-16 mm Ø
1 200

5 000 5 000
PURLINS SPCD. @ 600 mm O.C. 10 mm Ø STIRRUPS, SPCD. @ 4 @ 50, NEAR SUPPORT AT MIDSPAN
6 @ 100, REST @ 150 mm O.C.
L/5 L/5
SECTIONS
1 200 3 500 3 000 3 500 1 200

ROOF BEAM PLAN


1 200 5 000 1 200 SCALE 1:100 M RB-1
ROOF FRAMING PLAN ROOF BEAM DETAILS
SCALE 1:30 M
SCALE 1:100 M

PROJECT TITLE AND LOCATION SHEET CONTENTS PREPARED CHECKED SUBMITTED RECOMMENDED APPROVED SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JJJJJJJ

REGION VII
CONSTRUCTION OF
EEEE

FOUNDATION PLAN
MULTI-PURPOSE CENTER 2ND FLOOR FRAMING PLAN
TYPICAL BEAM DETAIL
(SENIOR CITIZENS' OFFICE) R.C. SLAB DETAIL
BEN ALDEN R. SERNA FRANCIS ANTONIO L. FLORES
BOHOL FIRST DISTRICT ENGINEERING OFFICE WILFREDO C. FLORES, JR. LEONCIA R. BAGOL LUCIO L. BAGOL
PUNTA CRUZ, MARIBOJOC ARCHITECT II ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION ASST. DISTRICT ENGINEER DISTRICT ENGINEER
NEW CAPITOL SITE, TAGBILARAN CITY
ELECTRICAL SYMBOLS :

2 - No. 8 TW WIRE IN 9 WATTS LED BULB


1
3/4" Ø PVC CONDUIT RECESSED DOWN LIGHT ( 6" Ø )

2 - No. 10 TW WIRE IN 16 WATTS LED TUBE


1 1
2" Ø PVC CONDUIT W/ LUMINAIRE

2 - No. 12 TW WIRE IN 100 AT 2P 20 AT 2P C.O.


2
1 SAFETY BREAKER ( 1.80 m ABOVE FLOOR LINE )
2" Ø PVC CONDUIT

L.O. 15 AT 2P 20 AT 2P
1 3 SPARE CIRCUIT LINE ( 2 - No. 12 THW WIRE IN 1/2'' CONDUIT )

SWITCH LINE ( 2 - No. 14 , TW )


GENERAL NOTES:
CIRCUIT HOMERUN
1. ALL ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH
THESE PLANS AND SPECIFICATIONS. THE APPLICABLE PROVISIONS
PROPOSED OVERHEAD SERVICE ENTRANCE W/ CONDUIT
OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC).
THE RULES AND REGULATIONS OF THE LOCAL ENFORCING AUTHORITY
SINGLE POLE SWITCH ( 1.20 m ABOVE FLOOR LINE )
S NUMERAL NEAR SYMBOL DENOTE THE NUMBER
AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY.
SWITCHES IN GANG
2 2. THE ELECTRICAL SERVICE POWER IS 1-PHASE, 2 WIRE + GROUND
1 - 14 mm TW CU. WIRE ( GROUNDING )
230 V, 60 HZ.
3. WIRING METHOD SHALL BE AS FOLLOWS:
a. FEEDERS AND RISERS - INTERMEDIATE METALLIC
CONDUIT (IMC)
b. LIGHTING, POWER RECEPTACLE - POLYVINYL CHLORIDE CONDUIT
(PVC)
BRANCH CIRCUIT & AUXILLARY

4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE


"THHN"
UNLESS OTHERWISE INDICATED IN THE PLAN. MINIMUM SIZE SHALL BE
5 000 1 500 1 750 1 750 5 000 1 500 1 750 1 750
3.5mm² AND INSULATED FOR 600 VOLTS. SMALLEST RACEWAY SHALL BE
2 500 2 500
15mmØ TRADE/NORMAL SIZE.
5. ALL OUTLET BOXES SHALL BE POLYVINYL CHLORIDE (PVC)
WITH FACTORY KNOCKOUTS.
1 800

1 800
1 1
6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED
S S TYPE FOR THE PARTICULAR LOCATION AND PURPOSE OF USAGE.
1 500

1 500
1 7. EQUIPMENT GROUNDING SYSTEM SHALL BE PROVIDED TO THE
1
C F S3 ELECTRICAL SYSTEM AS PER PHILIPPINE ELECTRICAL CODE
3 500

1 1 3 500 REQUIREMENT.

8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS:


3 000

3 000
B E 1 a. LIGHT SWITCH - 1.20 m ABOVE FINISH FLOOR
1
7 000

7 000

1 1 b. CONVENIENCE OUT LET - 0.30 m ABOVE FINISH FLOOR


C2 c. PANEL BOARD - 1.50 m ABOVE FINISH FLOOR
S d. FIRE ALARM STATION OUTLET - 1.50 m ABOVE FINISH FLOOR
A D e. PUSH BUTTON OUTLET - 1.20 m ABOVE FINISH FLOOR
3 500

3 500

1 1 f. FIRE ALARM & VIBRATING BELL - 0.30 m BELOW CEILING LINE


2 500

2 500
1 1

S3ABC S3DEF S3
2 000

2 000
1

C1

5 000 5 000 5 000 5 000

LIGHTING LAYOUT POWER LAYOUT


SCALE 1:100 M SCALE 1:100 M

PROJECT TITLE AND LOCATION SHEET CONTENTS PREPARED CHECKED SUBMITTED RECOMMENDED APPROVED SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JJJJJJJ

REGION VII
CONSTRUCTION OF
EEEE

FOUNDATION PLAN
MULTI-PURPOSE CENTER 2ND FLOOR FRAMING PLAN
TYPICAL BEAM DETAIL
(SENIOR CITIZENS' OFFICE) R.C. SLAB DETAIL
BEN ALDEN R. SERNA
BOHOL FIRST DISTRICT ENGINEERING OFFICE WILFREDO C. FLORES, JR. LEONCIA R. BAGOL LUCIO L. BAGOL FRANCIS ANTONIO L. FLORES
PUNTA CRUZ, MARIBOJOC ARCHITECT II ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION ASST. DISTRICT ENGINEER DISTRICT ENGINEER
NEW CAPITOL SITE, TAGBILARAN CITY
2 000 1 000 1 000

12 mm Ø REBARS @
200 mm O.C.,BW
GENERAL NOTES:
C.O. C.O. C.O. C.O. 1. GRADES OF HORIZONTAL PIPINGS 4. PIPE CLEAN-OUTS
100

RUN ALL HORIZONTAL PIPINGS IN PERFECT ALIGNMENT AND CLEAN-OUTS ARE REQUIRED UNDER THE FOLLOWING
AT A FORM GRADE NOT LESS THAN TWO PERCENT (2%). CONDITIONS:
300 mm AIRSPACE
400 mm AIRSPACE a. EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING
LEVEL OF SCUM 500 mm AIRSPACE 2. CHANGE IN DIRECTION
IN TWENTY TWO AND A HALF DEGREES (22 1/2°).
ALL CHANGE IN DIRECTION SHALL BE MADE APPROPRIATE b. ONE AND ONE-HALF METERS (1.50m) INSIDE THE PROPERTY
USE OF FORTY-FICE DEGREES (45°) WYES, LONG SWEEP LINES BEFORE THE HOUSE DRAINAGE CONNECTION.
OUT QUARTER BEND, SIXTH EIGHT OR SIXTEENTH BEND. WHEN c. EVERY FIFTEEN METERS (15.00m) IN HORIZONTAL RUN OF
THE CHANGE OF FLOW IS FROM HORIZONTAL TO VERTICAL PIPES.

1 750
A SINGLE 1/8 BEND COMBINATION MAYBE USED ON WASTE d. AT THE END OF ANY HORIZONTAL PIPE LINES.
1 800

CHB WITH PLASTER FIN ON TREATMENT PURIFYING LINE, TEE AND CROSSES MAYBE USED IN BENT PIPES.
INTERIOR FACE
CHAMBER C.O.
CHAMBER C.O. C.O. C.O. OUT 5. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE
200 mm THK. CHARCOAL IN 3. PROHIBITED FITTINGS
DIGESTIVE CHAMBER FILTER
WATERPROOFED.
NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON
300 mm THK. GRAVEL HORIZONTAL SOIL AND WASTE LINES, THE DRILLINGS 6. NOT LESS THAN 0.30 METER OF AIR SPACE MUST BE LEFT
100 mm THK CHB W/ 10 mm Ø FILTER AND TAPPING OF HOUSE DRAIN, WASTE OR VENT PIPES BETWEEN THE TOP OF THE SEWAGE AND THE UNDER PART
BARS @ 600 mm O.C.,BW C.O. AND USE OF SADDLE HUB AND BEND ARE PROHIBITED. OF VAULT ROOF SLAB.
300 mm THK. SAND FILTER
150

150
7. NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE
BUILDING.
600 x 600 (mm)MANHOLE COVER
250
10 mm Ø BARS @
0.60 m O.C.,BW IN

SEPTIC TANK DETAILS


SCALE 1:25 M

50 mm Ø VTR
100 mm Ø C.O.

50 mm Ø VTR
LAV
100 mm Ø C.O. WC

PLUMBING LEGEND: F FD
LAV LAV
LAV
WC - WATER CLOSET WC

FD WC FD VTR - VENT THRU ROOF GV


NOTE: F

50 mm Ø VTR
FD
ST
WC USE 1 2" PVC PIPE FOR UR
FD - FLOOR DRAIN ALL WATERLINES
F

UR LAV - LAVATORY
KS - KITCHEN SINK KS

F - FAUCET
ST
SH - SHOWER HEAD 50 mm Ø C.O.
GV
KS SV - SHOWER VALVE
GV - GATE VALVE
50 mm Ø C.O.
ST - SEPTIC TANK

SANITARY LINES
PLUMBING LAYOUT (PLAN) WATERLINES
SCALE 1:50 M

PLUMBING LAYOUT (ISOMETRIC)


SCALE 1:50 M

PROJECT TITLE AND LOCATION SHEET CONTENTS PREPARED CHECKED SUBMITTED RECOMMENDED APPROVED SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS JJJJJJJ

REGION VII
CONSTRUCTION OF
EEEE

FOUNDATION PLAN
MULTI-PURPOSE CENTER 2ND FLOOR FRAMING PLAN
TYPICAL BEAM DETAIL
(SENIOR CITIZENS' OFFICE) R.C. SLAB DETAIL
BEN ALDEN R. SERNA
BOHOL FIRST DISTRICT ENGINEERING OFFICE WILFREDO C. FLORES, JR. LEONCIA R. BAGOL LUCIO L. BAGOL FRANCIS ANTONIO L. FLORES
PUNTA CRUZ, MARIBOJOC ARCHITECT II ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION ASST. DISTRICT ENGINEER DISTRICT ENGINEER
NEW CAPITOL SITE, TAGBILARAN CITY

You might also like