Professional Documents
Culture Documents
Scope Matrix
Scope Matrix
PARTY RESPONSIBLE
FOR ITEMS OF
S/N ITEM OF WORKS WORKS REMARKS
Works Works By
By TPL SC
A SITE OFFICE AND TEMPORARY BUILDINGS
Identify and allocate space for construction of
A1 X
temporary offices and store for the SC.
Provide, erect, maintain and remove the temporary
A2 X
office and stores for the SC
Telecommunication facilities
A3 Internet X
Telephone
A4 Power and electricity to SC offices and stores X
D2 Compliances X
D3 Transport off site X
D4 First aid facility at site X X
F2 Final cleaning up X
De-watering including slush removal & disposing
F3 outside the site premise with required machinery, X
pumps, tools & tackles
Providing central disposal areas and dispose debris To clear and dump debris at central
F4 X
off site disposal areas.
G INSURANCES
X
G1 Contract or All Risk Policy
H OTHERS
H1 Royalty/Mines
J4 Bitumen X
J6 Safety PPE X