CHECK SHEET FOR: 1)
STALLATION OF MOTORIZED SMOKE DAMPERS , VCD & FIRE DAMPERS
LOCATION: LEVEL:
WIR NO. DATE:
T
S.No. ITEM checked) REMARKS |
, | Ensure that the materials are as per approved
material submittal
| Ensure all supports are used at site is as per approved
material submittal
Check the routing & level of ducts connection to the
3 |MSD/ MSFD/VCD as per approved shop /
coordination drawings.
4 | Check the joints and flanges are properly installed
and sealed
5 | Check the Fire Sealing done as per manufacturer
recommendation,
5 _| Electrical connections to the MSD / MSFD to be
done as per approved installation details
| Ensure that Identification labels are provided for
ducts |
| Check access doors are provided for MSFD / MSD ,
FD & VCD as per approved shop drawing
Comments:
Name:
Sign:
Date
Name:
Sian:
Date