CHECK SHEET FOR: 1) STALLATION OF MOTORIZED SMOKE DAMPERS , VCD & FIRE DAMPERS LOCATION: LEVEL: WIR NO. DATE: T S.No. ITEM checked) REMARKS | , | Ensure that the materials are as per approved material submittal | Ensure all supports are used at site is as per approved material submittal Check the routing & level of ducts connection to the 3 |MSD/ MSFD/VCD as per approved shop / coordination drawings. 4 | Check the joints and flanges are properly installed and sealed 5 | Check the Fire Sealing done as per manufacturer recommendation, 5 _| Electrical connections to the MSD / MSFD to be done as per approved installation details | Ensure that Identification labels are provided for ducts | | Check access doors are provided for MSFD / MSD , FD & VCD as per approved shop drawing Comments: Name: Sign: Date Name: Sian: Date