PROJECT : PEMBANGUNAN PILE SLAB RUAS NANGA SEMANGUT - TANJUNG KERJA (MYC) BH.NO
LOCATIONS : KECAMATAN PUTUSSIBAU SELATAN - KABUPATEN KAPUAS HULU DIRECTION : STA 640+400
DATE : 23-27 MARET 2022 RIG :
TOTAL DEPTH : 40 METER LOGGED BY : SOPIAN CS
DB-1
GWL : 0,00 METER CHECKED BY : MIKI ISHAN
CASHING
SAMPLING
RELEVATIVE DENSITY
CONE PENETRATION TEST(kg/cm²)
LAYER THICKNES (M)
OD (mm)
qc (kg/cm²)
NO. OF BLOW/CM
SYMBOLIC LOG
CONSISTENCY
PERMEABILITY
0 25 50 75 100 125 150
SOIL TYPE
DEPTH (M)
DEPTH (M)
DRILLING
CASHING
N VALUE
BEFORE
R.Q.D
DATE
TYPE
0 10 20 30 40 50 60
0.00 ORGANIS-OH
Organis (gambut), warna coklat
kehitaman, konsistensi sangat lunak
2.00 0-0-0 0
4.00 0-0-0 0
6.00 0-0-0 0
8.00 0-0-0 0
18
10.00 0-0-0 0
12.00 0-0-0 0
14.00 0-0-0 0
16.00 0-0-0 0
0-0-0 0
LEMPUNG-CH
Lempung, lanau, warna putih abu-abu,
konsistensi sangat lunak
18.00
2
20.00 2-3-4 7
UNDISTURBED SAMPLE
LEMPUNG KERIKIL
SHEET : 1
LANAU BATU
GEOLOGIC DRILLING LOG
PROJECT : PEMBANGUNAN PILE SLAB RUAS NANGA SEMANGUT - TANJUNG KERJA (MYC) BH.NO
LOCATIONS : KECAMATAN PUTUSSIBAU SELATAN - KABUPATEN KAPUAS HULU DIRECTION : STA 640+400
DATE : 23-27 MARET 2022 RIG :
TOTAL DEPTH : 40 METER LOGGED BY : SOPIAN CS
DB-1
GWL : 0,00 METER CHECKED BY : MIKI ISHAN
CASHING
SAMPLING
RELEVATIVE DENSITY
CONE PENETRATION TEST(kg/cm²)
LAYER THICKNES (M)
OD (mm)
qc (kg/cm²)
NO. OF BLOW/CM
SYMBOLIC LOG
CONSISTENCY
PERMEABILITY
0 25 50 75 100 125 150
SOIL TYPE
DEPTH (M)
DEPTH (M)
DRILLING
CASHING
N VALUE
BEFORE
R.Q.D
DATE
TYPE
0 10 20 30 40 50 60
20.00 2-3-4 7
2
22.00 5-7-7 14
PASIR-SP
Pasir halus, warna abu-abu, konsistensi
lepas
3
24.00 16-17-21 38
PASIR-SP
Pasir kasar, kerikil halus, warna
abu-abu, konsistensi lepas sampai
26.00 padat 18-21-24 45
28.00 19-23-25 48
8
30.00 20-24-29 53
32.00 21-25-28 53
KERIKIL-GP
Kerikil, pasir kasar, warna abu-abu,
konsistensi lepas sampai padat
34.00 12-15-20 35
36.00 12-16-22 38
7
38.00 18-23-28 51
UNDISTURBED SAMPLE
LEMPUNG KERIKIL
SHEET : 2
LANAU BATU
GEOLOGIC DRILLING LOG
PROJECT : PEMBANGUNAN PILE SLAB RUAS NANGA SEMANGUT - TANJUNG KERJA (MYC) BH.NO
LOCATIONS : KECAMATAN PUTUSSIBAU SELATAN - KABUPATEN KAPUAS HULU DIRECTION : STA 640+922
DATE : 28 MARET - 02 APRIL 2022 RIG :
TOTAL DEPTH : 44 METER LOGGED BY : SOPIAN CS
DB-2
GWL : 0,00 METER CHECKED BY : MIKI ISHAN
CASHING
SAMPLING
RELEVATIVE DENSITY
CONE PENETRATION TEST(kg/cm²)
LAYER THICKNES (M)
OD (mm)
qc (kg/cm²)
NO. OF BLOW/CM
SYMBOLIC LOG
CONSISTENCY
PERMEABILITY
0 25 50 75 100 125 150
SOIL TYPE
DEPTH (M)
DEPTH (M)
DRILLING
CASHING
N VALUE
BEFORE
R.Q.D
DATE
TYPE
0 10 20 30 40 50 60
0.00 ORGANIS-OH
Organis (gambut), warna coklat
kehitaman, konsistensi sangat lunak
2.00 0-0-0 0
4.00 0-0-0 0
6.00 0-0-0 0
8.00 0-0-0 0
15
10.00 0-0-0 0
12.00 0-0-0 0
14.00 0-0-0 0
LEMPUNG-CH
Lempung, lanau, warna putih abu-abu,
konsistensi sangat lunak
16.00 0-0-1 1
5
1-1-2 3
18.00
20.00 2-2-3 5
UNDISTURBED SAMPLE
LEMPUNG KERIKIL
SHEET : 1
LANAU BATU
GEOLOGIC DRILLING LOG
PROJECT : PEMBANGUNAN PILE SLAB RUAS NANGA SEMANGUT - TANJUNG KERJA (MYC) BH.NO
LOCATIONS : KECAMATAN PUTUSSIBAU SELATAN - KABUPATEN KAPUAS HULU DIRECTION : STA 640+922
DATE : 28 MARET - 02 APRIL 2022 RIG :
TOTAL DEPTH : 44 METER LOGGED BY : SOPIAN CS
DB-1
GWL : 0,00 METER CHECKED BY : MIKI ISHAN
CASHING
SAMPLING
RELEVATIVE DENSITY
CONE PENETRATION TEST(kg/cm²)
LAYER THICKNES (M)
OD (mm)
qc (kg/cm²)
NO. OF BLOW/CM
SYMBOLIC LOG
CONSISTENCY
PERMEABILITY
0 25 50 75 100 125 150
SOIL TYPE
DEPTH (M)
DEPTH (M)
DRILLING
CASHING
N VALUE
BEFORE
R.Q.D
DATE
TYPE
0 10 20 30 40 50 60
20.00 2-2-3 5
PASIR-SP
Pasir halus, warna abu-abu, konsistensi
lepas
22.00
4
8-10-12 22
24.00 15-18-24 42
KERIKIL-GP
Kerikil, pasir kasar, warna abu-abu,
konsistensi lepas sampai padat
26.00 18-24-26 50
6
28.00 20-24-29 53
30.00 22-25-30 55
PASIR-SP
Pasir kasar, kerikil halus, warna
abu-abu, konsistensi lepas sampai
padat
32.00 11-17-21 38
34.00 13-19-21 40
10
36.00 13-18-20 38
38.00 18-23-25 48
40.00 19-25-25 50
UNDISTURBED SAMPLE
LEMPUNG KERIKIL
SHEET : 2
LANAU BATU
GEOLOGIC DRILLING LOG
PROJECT : PEMBANGUNAN PILE SLAB RUAS NANGA SEMANGUT - TANJUNG KERJA (MYC) BH.NO
LOCATIONS : KECAMATAN PUTUSSIBAU SELATAN - KABUPATEN KAPUAS HULU DIRECTION : STA 640+922
DATE : 28 MARET - 02 APRIL 2022 RIG :
TOTAL DEPTH : 44 METER LOGGED BY : SOPIAN CS
DB-2
GWL : 0,00 METER CHECKED BY : MIKI ISHAN
CASHING
SAMPLING
RELEVATIVE DENSITY
POCKET PENETROMETER (kg/cm²)
LAYER THICKNES (M)
OD (mm)
qc (kg/cm²)
NO. OF BLOW/CM
SYMBOLIC LOG
CONSISTENCY
PERMEABILITY
0 25 50 75 100 125 150
SOIL TYPE
DEPTH (M)
DEPTH (M)
DRILLING
CASHING
N VALUE
BEFORE
R.Q.D
DATE
TYPE
0 10 20 30 40 50 60
40.00 19-25-25 50
LEMPUNG-CH
Lempung, warna abu-abu, konsistensi
kaku
42.00 8-10-12 22
4
44.00 11-15-21 36
AKHIR PENGEBORAN
46.00
48.00
50.00
52.00
54.00
56.00
58.00
60.00
UNDISTURBED SAMPLE
LEMPUNG KERIKIL
SHEET : 3
LANAU BATU