Summary of Cost / Scope of Works

LOT 1 = 5 SITES LOT 2 = 3 SITES LOT 4 = 6 SITES


NGN2,044,915,058.01 NGN1,857,150,995.88 NGN2,342,020,632.95
Inclusive of 5% contingency Inclusive of 5% Inclusive of 5% contingency
and 7.5% VAT contingency and 7.5% VAT and 7.5% VAT
1. Ebenezeri I (Adogba 1. Oke Omi - Kumopayi 1. Olorungunwa I (Rockview
street) Bridge Estate)
2. Ebenezeri II (Kute- 2. Idi Osan Kumapayi 2. Olorungunwa II
Jenriyin) Bridge (Olorungunwa
3. Oke Ayotuntun 3. Aroro - Makinde (Ojoo – Channel+Culvert)
 Safau Road (Oki Area) Arulogun Road 3. Omiri I (Kuelu Street)
 Wakajaye/Agbede/Ay /GOFAMINT Area) 4. Omiri II (Ogo Oluwa Street)
enreti/Wofun Areas 5. Alaro Poly (Oke Odan
4. Aiyetoro - Alapata (Elere Stream Culvert - Poly
Area) Quarter Oke Odan)
6. Alaro 7up (Gbekuba
Communities culverts)

Major works
Road 4.45km Road 2.9km Road 6.65km
Covered 8.90km Covered 5.8km Covered 13.3km
Lined Lined Lined
drain drain drain
Culverts 2Nos -2.5m x 2.5m Culverts 1No.- 3/3.0mx3.5m Culverts 2Nos – 3.0m x 3.5m
1No. – 3.0mx3.5m 1No.-2.5m x 2.5m 2Nos – 3/3.0m x 3.5m
1No.- 2/3.0m x 3.5m 2Nos – 2/3.0m x 3.5m
1No.-3.0mx3.5m
(Total = 6Nos) (Total = 2Nos) (Total = 6Nos)
Bridges 1No. 15m Span bridge Bridges 2Nos – 2span / 15m Lined 4m x 2.5m = 500m
span bridge = 30m Channel 2.5m x 1.5m = 200m