001-RA - Unloading and Erection of Pipe Spools REV-5
001-RA - Unloading and Erection of Pipe Spools REV-5
001-RA - Unloading and Erection of Pipe Spools REV-5
Risk Level
Risk Level
Likelihood
Likelihood
Y/N
Severity
Severity
1 Preparation 1. Mobilization of Legal issues 3 2 M Y 1.1 Ensure medical fitness 2 1 L
man power and certificate and Covid 19
failure to attend vaccination for everyone comes
the induction for induction and ensure 100%
2. Failure to induction for everyone before
assessment of entering into site.
Logistic Plan 2.1. Ensure the route survey and
3. Failure to prepare logistic plan as per
obtained permit requirements and get approved
4. Lack of Training from APG.
5. In Competency / 3.1. Ensure to obtain the relevant
License permits from APG before
6. Invalid starting the work.
documentation 4.1. Ensure job specific training for
everyone and training
passbook signed by APG.
5.1. Operators should have valid
license with competent
certificate and specified skilled
workers should have
competency certificate.
6.1. All relevant documents shall be
available at site.
2. Covid-19 Spread of corona virus Human ill-health 2 2 M Y 1.1. Daily temperature check at 1 1 L
Page 1 of 11
Elephant Project – Sayakha Gujarat
Precautions entry.
1.2. Ensure hand sanitation at
regular intervals.
1.3. Ensure to wear nose masks
and maintain social distancing.
1.4. Covid-19 caution boards.
1.5. Ensure the training to
awareness about the covid-19
virus and causes.
1.6. Ensure the vaccination and
reporting of ill-health.
3, Marching of 1. Improper access. Body injury 3 3 H Y 1.1. Vehicle entry permission from 1 2 L
manlift/Farana 2. Hit injury Damage of APG.
/Crane 3. Un Authorized Equipment 1.2. Logistic safety plan shall be
person operating Property damage prepared for vehicle movement
& person injury 1.3. Ensure access should be clear
from any obstruction.
1.4. Ensure no overhead electric
cable.
2.1. Flagman shall be provided to
guide farana /crane operator
2.2 Speed limit of 10km/hr shall be
strictly followed.
3.1. Operator should have valid
license with competent
certificate.
Page 2 of 11
Elephant Project – Sayakha Gujarat
Page 3 of 11
Elephant Project – Sayakha Gujarat
work area.
5. Erection of pipe 1. Damaged lifting Human 2 3 H Y 1.1 All lifting gears have valid third- 1 2 L
spools manually gears injury/property party certificates issued by an
/farana and boom lift 2. Failure of damage authorized competent person.
by using web sling inspection 1.2 Damage lifting gears will not allow
and chain block. 3. Unauthorized
use.
entry
1.3 All lifting gears must carry visible
4. Incompetent rigger
monthly color code identification
5. Lack of awareness
2.1. Make sure all lifting
for slinging accessories are physically in
6. Cut injury good condition and have valid
7. Fall from height TPI.
8. Falling objects 2.2. Softeners padding provide to
structural steel
2.3. Chain block and web sling
shall be inspected before use.
(every chain link is rust-free
etc.)
2.4. Chain block hanging point and
hanging arrangement shall
also be under SWL.
3.1. Area barricading and caution
boards to be placed.
4.1. Assign a competent rigger
rigging foreman.
4.2 All involved rigging foremen must
be certified by an authorized third
party.
Page 4 of 11
Elephant Project – Sayakha Gujarat
Page 5 of 11
Elephant Project – Sayakha Gujarat
Page 6 of 11
Elephant Project – Sayakha Gujarat
Page 7 of 11
Elephant Project – Sayakha Gujarat
rack.
6.5 Adopt safe rigging practices.
7.1 All mandatory PPE must be
worn.
7.2 Prescribed eyewear safety
goggles must be worn
8.1. Continuous safety personal
monitoring.
8.2. Assign sufficient supervisor to
execute the activity.
7. Access & Egress 1. BOOM LIFT may Human injury 3 2 6 Y 1.1 Ensure boom lift is approved by 2 2 M
for De-sling the topple APG before deploying at site.
column by BOOM 2. Fall of men/material Fatality 1.2 Third party certificate & operator
LIFT 3. Failure of BOOM manual shall be available at work
LIFT Material damage
location.
1.3 Cherry picker with valid TPI by a
competent person.
1.4 Ensure levelled & compacted
area for BOOM LIFT placement &
movement.
1.5 Ensure signalman with flag while
moving of boom lift.
Page 8 of 11
Elephant Project – Sayakha Gujarat
Page 9 of 11
Elephant Project – Sayakha Gujarat
spools at Piperack.
3.7 Ensure safety inspection check
sheet for boom lift before starting the
job & color coding for the month.
3.8. Provide wheel choke for all moving
equipment.
3.9 Manlift/farana to be parked at
designated places.
Page 10 of 11
Elephant Project – Sayakha Gujarat