Saudi Arabian Oil Company: DA-728377 001 P 0A2 K10 Restricted

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SAUDIARAMCO.

NOTES:

1. ALL LOAD EQUIPMENT/DEVICES CONNECTED


DOWNSTREAM TO THE MCC AND SHOWN DASHED
ARE TO BE PROVIDED BY HVAC VENDOR.

TO 480V MCC BLDG 4804


K14-MCC-0102
(SEE DWG DA-728986, SH 3)

OF
NOTES (BI-10-00844-0001):

CONSENT
C-3061-1
2. EXISTING MCC SPACE CUBICAL'S SHALL BE
C-3061-2 UTILIZED TO INSTALL NEW C.B. 250AF/250AT TO
480V MCCK14-MCC-0104
(LOCATED IN CONTROL BLDG 6001) FEED POWER TO NEW HVAC UNITS.

3. NEW POWER CABLES (PC-0001,PC-0002,PC-0003,PC-0004)

TTEN
SHALL BE INSTALLED AND CONNECTED TO NEW HVAC
UNITS.
400AF

WRI
(LOCATED AT PRIMARY
ST ES
400AT EAST EXIT)

THE
TO UPS PANEL

480V, 600A, 3PH, 3W, 60HZ, 25000AIC AT 600V, 65000A BUS BRACING 1E

BELOW

THOUT
2F 2K 3D 3F 3H 1F

WI
NUED
2BL 2BR 3BL 3RB 3ML 3MR
30AT 480V-120V 30AT 480V-120V 7AT 3AT 3AT

NG
CONTI
150AF 150AF 150AF 150AF 150AF 150AF

DRAWI
90AT 60AT 15AT 50AT 15AT 50AT

480V-120V

480V-120V

480V-120V
2 2 2 2 2 SYMBOLS

1. FOR LEGEND & SYMBOLS, SEE DWG DA-512226


AR AR AR AR AR AR AR
AND BELOW.

S
THI
1 H L 1 H L 1 1 1
L H L H 2. FOR ONE LINE DIAGRAM SYMBOLS, SEE
DWG. DA-512224.

H L H L

FROM
M M M H L
PC-4596 - TWO SPEED STARTER
3 3 3 3 3 3 3 H - HIGH SPEED COIL
L - LOW SPEED COIL

NED
NOTE 1 NOTE 1 NOTE 1

OBTAI
K10-XFR(T)-003
ES - EMERGENCY SHUT-DOWN SWITCH
30KVA C-2888
480 / 208-120V
3-PH,4-WIRE+GRD K14-XFR-A
LEGEND
DISC DISC 30KVA DISC

BE
DISC DISC DISC
SW (2) SW (2) 480V/ SW
SW SW SW ABBREVIATION DESCRIPTION
208-120V

PART,SHALL
UPS UNINTERRUPTIBLE
POWER SUPPLY
DISC
SW PC-4338 HVAC HEATING, VENTILATION,
PC-4595 C-2889
AIR CONDITIONING
PC-4590

PC-4597 BUS BUS BAR SECTION


LP

N
I
3KW

FULL,OR
13.98 SCOPE UNDER
30KVA
kVA BI-10-00844-0001
5/0 5/10 3 0.5 0.5

6001
NON-FUSIBLE DISCONNECT SWITCH

PANEL
480V, 3 POLE 60HZ AMPERE

N
K14-CB07-ACCU-B

I
T
UNI
K14-CB07-AHU-B
RATING SIZE AS INSTALLED.
ON

ON
K14-CB07-PU-A

K14-CB07-PU-B

K14-CB07-BB-A

K14-CB07-BB-B
SUPPLY
BLDG

ON
ZATI

ZATI

K14-CB07-EDH
HEATER

AND

NG
TRANSFORMER

RECEPTACLE

REPRODUCTI
SYSTEM

HANDLI

COOLED
NG
K14-LP-001

1A
1
PRESSURI

PRESSURI

CONDENSI
REFERENCE DRAWINGS

K14-LP-A
CONTROL

BLEEDER

BLEEDER
NG

NON-UPS

BLOWER

BLOWER
BYPASS

DWG. CONTROL(BI-00179) VD-047942

GHTI
T-1

T-2

POWER
SCADA

SPACE
SPARE

SPARE
DUCT
SCOPE OF WORK VE-290771

T
UNI

UNI

UNI
UPS

R
LI

AI

AI
CABLE AND CONDUIT SCHEDULE VD-291233.005
ELECTRICAL POWER PLAN DA-728391.005
ONE LINE DIAGRAM, 480V MCC PS-7 DA-728376-2

SAUDIARAMCO.NO
CABLE AND CONDUIT SCHEDULE, PS-7 DB-508747-9

480V MCC K14-MCC-0104 CABLE AND CONDUIT SCHEDULE, PS-7 DB-508747-10


EQUIPMENT LAYOUT BLDG 6001 DA-728391-1
STUB-UP PLAN BLDG 6001 DA-728391-4
DWG. CONTROL (BI-10-00179-0004) VD-309022
SCOPE OF WORK VE-309023
480V, 600A, 3PH, 3W, 60HZ, 25000AIC AT 600V, 65000A BUS BRACING BLOCK DIAGRAM UPS DA-728377 SH 002

ELECTRICAL POWER PLAN DA-728391 SH 005


1H 1M 2M 3K
ABOVE

4D 4F 4H 1K CABLES & CONDUIT SCHEDULE VD-309034

OF
4K
DWG. CONTROL FOR J.O. BI-10-00844-0001 PD-00ADCL

PROPERTY
4BR 4BL 4ML 250AF 250AF 15AT 1KL 3KR POWER LAYOUT PA-00P114
4MR
7AT 3AT 3AT
FROM

250AT 250AT CABLE AND CONDUIT SCHEDULE PD-00P122


150AF 150AF 7AT 150AF 150AF 150AF 150AF

480V-120V
90AT 100AT 15AT 50AT 2 50AT 50AT
480V-120V

480V-120V

480V-120V

2 2 2
480V-120V
NUED

AR AR AR
CONTI

AR

SOLE
1 1 1
1

THE
M M M
M
3 3 3 HOA

ARE
3

NOTE 1 NOTE 1 NOTE 1


NOTE 1

N
HEREI
PC-4586
PC-4340

DISC
DISC DISC DISC PE

NED
DISC SW K10-XFR(T)-001
K14-XFR(T)-005 SW SW SW
PC-0001 PC-0003 30 kVA, 480VAC/
SW

CONTAI
40KVA 208-120VAC
480 / 208-120V

C-2864
REVISION VALIDATION
3-PH, 4-WIRE + GROUND
K10-DSW-001 K10-DSW-002 PC-4341
THIS REVISION NO. IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
PC-4587 250A, 3P 250A, 3P
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
NEMA 4X NEMA 4X

ON
PC-0002 PC-0004

NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)

ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

17.58
30KVA kVA
REV.NO. DATE REVISION DESCRIPTION
3 0.5 0.5 PB

I
0A2 07/01/21 ISSUED FOR 100% - PP
0.5

6001

THE
STAND-BY)
PACKAGE COMPUTER

JOB ORDER/EWO NO.


PACKAGE COMPUTER

THIS REVISION IS NOT TO BE USED FOR

NG
T

10-00844-0001
UNI

CONSTRUCTION UNTIL CERTIFIED AND DATED

GHTI
ON

K10-CB07-ACCU-A

DUTY)
UNI
K14-CB07-AHU-A

SAUDI ARABIAN OIL COMPANY


SLOLATI

AND
BLDG
K14-CB07-BB-C

K14-CB07-BB-D

K14-CB07-EF-1
TRANSFORMER

LI
NG

POWER
DRAWING TYPE

PANELBOARD
02A

BLACKOUT
SYSTEM

K14-PP-003
ELECTRICAL ONE LINE DIAGRAM
HANDLI

COOLED
NG

ROOM
PACU-01 (

E1L
PACU-02 (
UNI

T
UNI
2

CONDENSI

AREA

SPACE

SPACE

NG
FAN

N
I
BLEEDER

BLEEDER

480V MCC K10-MCC-0104


NPUT/I

DRAWI
BLOWER

BLOWER

SPACE
LOCATED
SPARE

SPARE

ROOM

NOTE
RACK
HVAC
ROOM

EAST/WEST PIPELINE PUMP STATION #7


PURGE

NGL
UPS

R
AI

AI

2X

2Y
YANBU SAUDI ARABIA
NGL
I

S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
K10 P DA-728377 001 0A2
Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-05