NOTES:
1.ALL DIMESNIOSN ARE IN MILLIMETERS & ELEVATIONS
ARE IN METERS UNLESS OTHERWISE NOTED.
OF
4.CARBON DIOXIDE SUPPRESSION SYSTEM SHALL BE
DESIGNED, INSTALLED, HYDROSTATICALLY TESTED,
CONSENT
COMMISSIONED AND PLACED INTO SERVICE AS PER
NFPA12, SAES-B-014 AND SAES-B-019.
TO FACP
5.CAPACITIES , PIPE SIZES AND PIPE ROUTING SHOWN
ARE PRELIMINARY. DRAWINGS SHALL BE DEVELOPED
FURTHER IN DETAIL DURING DETAIL DESIGN
TTEN
ENGINEERING.
WRI
MAIN CYLINDERS BE GALVANIZED SEAMLESS STEEL PIPE CONFORMING
TO ASTM A53, GRADE B, SCHEDULE 40 AND FITTINGS
•" INITIAL DISCHARGE MANIFOLD (BY VENDOR) SHALL BE MALLEABLE IRON GALVANIZED THREADED
THE
FITTINGS CONFORMING TO CLASS 300.
THOUT
ABOVE SHALL BE CARBON STEEL A106, GRADE B,
ERW/SEAMLESS, BEVEL END, SCHEDULE 80, AND
E E E E E FITTINGS SHALL BE BUTT WELDED FITTINGS ,
…" (SEE NOTE-11)
CONFORMING TO ASTM A234 GRADE WPB, SCHEDULE
WI
CPG CPG CPG CPG CPG 80 AND THEIR DIMENSION CONFORMING TO ASME
B16.9.
NG
DRAWI
8.ALL OPENINGS WITHIN THE PROTECTED AREA SHALL
BE PERMANENTLY SEALED OR EQUIPPED WITH
AUTOMATIC DOOR CLOSURES/DAMPERS.
D
9. A ROOM INTEGRITY TEST SHALL BE PERFORMED TO
S
ENSURE THE PROTECTED AREA IS SEALED PROPERLY.
THI
•" 10.FOR CONTROL CABLES AS PER NFPA 70 AND 72,
REFER TO FIRE ALARM DRAWINGS.
FROM
CO2 CYLINDER
100 lbs (TYP.) 11.ALL TUBINGS SHALL BE OF STAINLESS STEEL OR
AS RECOMMENDED BY CO2 MANFACTURER.
NED
12.ALL FIRE PROTECTION EQUIPMENTS SHALL BE UL
LISTED/ FM APPROVED.
OBTAI
13.THIS IS A PROJECT PROPOSAL DRAWING ONLY.
DRAWINGS SHALL BE DEVELOPED FURTHER
EXTENDED DISCHARGE MANIFOLD (BY VENDOR)
DURING DETAIL DESIGN ENGINEERING
TURBINE ENCLOSURE
BE
LEGEND
PART,SHALL
CYLINDER
CPG CPG CPG CPG CPG CPG CPG PRESSURE
GAUGE
LOCK-OUT
VALVE WITH SWITCH
N
I
FULL,OR
PS PRESSURE SWITCH
N
I
DAMPER
ON
REPRODUCTI
SELECTOR
RESERVE CYLINDERS S
SWITCH
SAUDIARAMCO.NO
E E E E E
CHECK VALVE
TYP. TYPICAL
D
REFERENCE DRAWINGS
OF
DWG. CONTROL FOR J.O.BI-10-00844-0001 PD-00ADCL
CO2 FIRE SUP.SYS. PIPING LAYOUT PA-00B109
PROPERTY
DESIGN DATA SCHEDULE
SOLE
TOTAL FLOODING SYSTEM
SYSTEM TYPE
(INITIAL/ EXTENDED DISCHARGE) EXTENDED DISCHARGE MANIFOLD (BY VENDOR)
THE
3
FLOODING FACTOR 1.33 KG CO2/M
ARE
HAZARD LENGTH 12.1 M
N
HEREI
HAZARD HEIGHT 3.2 M
2
HAZARD AREA 40 M
3
HAZARD VOLUME 128 M
NED
SCALE: N.T.S
CONTAI
AGENT CAPACITY INITIAL - 204 KG / EXTENDED - 260 KG
ON
STANDARDS NFPA 12, SAES -B-019
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 07/01/21 ISSUED FOR 100% - PP
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-00844-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
1 CO2 SYSTEM - FIRE PROTECTION SCHEMATIC LAYOUT SAUDI ARABIAN OIL COMPANY
AND
-
SCALE N.T.S DRAWING TYPE
SH
CO2 SYSTEM FP SCH. LAYOUT FPS
NG
FT-4 TURBINE ENCLOSURE (ML-1/2/3)
DRAWI
EAST/WEST PIPELINE PUMP STATION #2
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
K05 B PA-00B108 001 C
Saudi Aramco 2615 ENG. (05/05)