SAUDIARAMCO.

NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS & ELEVATIONS


ARE IN METERS UNLESS OTHERWISE NOTED.

2.ALL PIPE SIZES SHOWN ARE IN NOMINAL DIAMETER


IN INCHES UNLESS OTHER WISE NOTED.

3.CARBON DIOXIDE SUPPRESSION SYSTEM SHALL BE

OF
DESIGNED, INSTALLED, HYDROSTATICALLY TESTED,
COMMISSIONED AND PLACED INTO SERVICE
DAMPERS DAMPERS

CONSENT
AS PER NFPA12, SAES-B-014 AND SAES-B-019.

4.CAPACITIES , PIPE SIZES AND PIPE ROUTING


1200
SHOWN ARE PRELIMINARY. DRAWINGS SHALL
BE DEVELOPED FURTHER IN DETAIL DURING
DETAIL DESIGN ENGNINEERING.

TTEN
5.ALL ABOVE GROUND PIPES UPTO ƒ" (20MM) DIA. SHALL
BE GALVANIZED SEAMLESS STEEL PIPE CONFORMING

WRI
TO ASTM A53, GRADE B, SCHEDULE 40 AND FITTINGS
SHALL BE MALLEABLE IRON GALVANIZED THREADED
FITTINGS CONFORMING TO CLASS 300.

THE
6.ALL ABOVE GROUND PIPES 1" (25MM) DIA AND
ABOVE SHALL BE CARBON STEEL A106, GRADE B,

THOUT
ERW/SEAMLESS, BEVEL END, SCHEDULE 80, AND

5620
FITTINGS SHALL BE BUTT WELDED FITTINGS ,
SEE NOTE-13 CONFORMING TO ASTM A234 GRADE WPB, SCHEDULE

WI
80 AND THEIR DIMENSION CONFORMING TO ASME
B16.9.

NG
DRAWI
7.ALL OPENINGS WITHIN THE PROTECTED AREA
SHALL BE PERMANNETLY SEALED OR EQUIPPED
WITH AUTOMATIC CLOSURES.

8.A ROOM INTEGRITY TEST SHALL BE PERFORMED TO

S
THI
ENSURE THE PROTECTED AREA IS SEALED PROPERLY.

12100
9.FOR CONTROL CABLINGS AS PER NFPA 70 AND 72,

FROM
REFER TO FIRE ALARM DRAWINGS.

10.THE PROJECT SCOPE SHOWN HERE IS BASED ON


AS-BUILT DRAWINGS. FIELD VERIFICATION SHALL

NED
BE CONDUCTED AT THE SITE BEFORE STARTING
ANY WORK.

OBTAI
11. THIS IS A PROJECT PROPOSAL DRAWING ONLY.
DRAWINGS SHALL BE DEVELOPED FURTHER
DURING DETAIL DESIGN ENGINEERING

BE
12.ALL FIRE PROTECTION EQUIPMENST SHALL BE UL
LISTED/ FM APPROVED.

PART,SHALL
13.CO2 SHELTER SHALL BE OF 2MM THICK STEEL SHEET,
COVERING THE SIDES WITH ACCESS DOORS INFRONT OF
THE CYLIDERS.

N
I
FULL,OR
LEGEND
SEE NOTE-7
CO2 NOZZLE

N
CO2 CYLINDER

I ON
REPRODUCTI
CO2 SYSTEM PIPE

D DIFFERENTIAL CHECK VALVE

3300

CHECK VALVE

SAUDIARAMCO.NO
REFERENCE DRAWINGS
DWG. CONTROL FOR J.O.BI-10-00844-0001 PD-00ADCL
CO2 SYSTEM FP SCHEMATIC LAYOUT PA-00B127

OF
PROPERTY
DESIGN DATA SCHEDULE

EQUIPMENT FT-4 TURBINE ENCLOSURE

EXTINGUISHING AGENT TYPE CO2 (CARBON DIOXIDE)

TOTAL FLOODING SYSTEM


SYSTEM TYPE

SOLE
(INITIAL/ EXTENDED DISCHARGE)

DESIGN CONCENTRATION 50%

3
FLOODING FACTOR 1.33 KG CO2/M

THE
HAZARD LENGTH 12.1 M

ARE
HAZARD WIDTH 3.3 M

HAZARD HEIGHT 3.2 M

N
HEREI
2
HAZARD AREA 40 M
0 1.0 2.0 3.0 4.0 5.0

3
HAZARD VOLUME 128 M
METERS

NED
AGENT CAPACITY INITIAL - 204 KG / EXTENDED - 260 KG SCALE: 1 : 50M

CONTAI
NUMBER OF CYLINDERS INITIAL - 5 No's / EXTENDED - 6 No's
REVISION VALIDATION
CYLINDER ARRANGEMENT DUTY (MAIN) / STANDBY (RESERVE)
THIS REVISION NO. IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
STANDARDS NFPA 12, SAES -B-019

ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

REV.NO. DATE REVISION DESCRIPTION

I
C 07/01/21 ISSUED FOR 100% - PP

THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-00844-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY

AND
1 CO2 FIRE SUPPRESSION SYSTEM PIPING LAYOUT DRAWING TYPE

-
SCALE 1 :50M CO2 FIRE SUP. SYS. PIPING LAY. FPS

NG
SH

FT-4 TURBINE ENCLOSURE (ML-1/2/3)

DRAWI
EAST/WEST PIPELINE PUMP STATION #4

YANBU SAUDI ARABIA

S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
K07 B PA-00B123 001 C
Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-05