Gudang + Kantor + Denah PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

U

90.80
22.55
B T 4.00
T. TORN
2000 L

10.54
S
24.00

4.00
POS JAGA
2x3 23.01

GUDANG 1 40 x 60
+1.00

HALAMAN
Jalan Desa

111.92
84.00
98.94

GUDANG 2 40 x 60
+0.50

WC

T. BILAS
SUPIR

T. BILAS
SUPIR
6.92

WC

R. GENSET
WC 3x3

GAZEBO S E L A S A R (2 x 40) +0.25


3x3
T.WUDHU 6.00
+0.20
R. TUNGGU TAMU 5 x 10 TEMPAT TORN
+0.30 (2 x 3 ) 2000 L
R. DIREKTUR 5 x 5
PARKIR MOBIL +0.30

27.92
16.50 GUDANG 15 x 15
+0.30 WC 2x2
MUSHOLA 6 x 6
+0.50
R. ADMINISTRASI / STAF 13 x 10
+0.30
MUSHOLA RUANG RAPAT 10 x 15
PANTRY

+0.30

WC 2x2

90.00

SITE PLAN
skala 1 : 500
1 2 3 4 5 6 7 8 9 10 11
2.00 40.00 40.00 2.00
8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

2.00
2.00
RABAT BETON +0.20
A

6.00
6.00
B

6.00
C 6.00

6.00
6.00

6.00
6.00

6.00
6.00

GUDANG 2 GUDANG 1
F
+0.50 +1.00

60.00
60.00

6.00
6.00

RABAT BETON +0.20


RABAT BETON +0.20

G
6.00
6.00

6.00
6.00

6.00
6.00

6.00
6.00

K
RABAT BETON +0.20 RABAT BETON +0.20

2.00
2.00

DENAH GUDANG
skala 1 : 400
A
60.00 2.00

2.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

2.00 RABAT BETON +0.20


11

8.00
10

8.00
HALAMAN
9

GUDANG 1

8.00
40.00
B +1.00 B

RABAT BETON +0.20


RABAT BETON +0.20

8.00
8

8.00
7
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00
60.00 2.00

2.00
A B C D E F G H I J K
A

DENAH GUDANG 1
skala 1 : 250
TAMPAK DEPAN GUDANG
skala 1 : 300

SAMPING KANAN GUDANG


skala 1 : 300
TAMPAK BELAKANG GUDANG
skala 1 : 300

SAMPING KIRI GUDANG


skala 1 : 300
1.20
1.20
1.20
0 1.20 E GALVALUM LAPIS INSULATOR
1 . 2
1.20
.2 0 1 .20
22 1.2 0 D
1.20 PENUTUP GALVALUM
1.20
1.20 PLAT SAMBUNGAN 15 MM
1.20 VENTILATOR
1.20 C
1.20 GORDING CANAL C 150x50

5.27
1.20
1.20
1.20 IWF 600x300
0.90
0.90
TALANG SENG
2.00 F
IWF 250x125

B PAS. BATA

3.00
IWF 250x125

PAS. BATA
IWF 200x400 PAS. BATA IWF 200x400 IWF 200x400 IWF 600x300

3.00
STIFNER 15 MM
PINTU BESI HIDROLIK IWF 250x125

11.00
IWF 200x400

3.00
A BALOK 15x30

2.00
GUDANG +1.00

1.00
COR LANTAI K-350 TB : 20 CM
URUGAN SIRTU TB : 50 CM

2.00
TANAH URUG

4.00
2.00
8.00 8.00 8.00 8.00 8.00
40.00
11 10 9 8 7 6

POTONGAN A - A
skala 1 : 175
40.00
2.00 3.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

WC

2.00
+0.25
5.00

RUANG RAPAT

1.50
+0.30
PANTRY

1.50
R. ADMINISTRASI / STAF
+0.30

1.50
WC GUDANG +0.30

2.00
5.00

+0.25

17.00
17.00

1.50
R. DIREKTUR R. TUNGGU TAMU
+0.30 +0.30

5.00
5.00

S E L A S A R +0.25

2.00
2.00

2.00 3.00 4.05 1.90 4.05 4.05 1.90 4.05 5.00 5.00 5.00
40.00

DENAH KANTOR
skala 1 : 150
1.00 1.50 6.00 2.00
0.50 1.00 3.00 3.00

RABAT BETON +0.20

1.00
1.25
1.00
MUSHOLA SELASAR

6.00
1.50
+0.50 +0.45

RABAT BETON +0.20

1.00
1.25
RABAT BETON +0.20

1.00
DENAH MUSHOLA
skala 1 : 50
6.00
4.50 1.50

2.00
2.00
T. WUDHU TOILET
+0.20 +0.15

DENAH T. WUDHU
skala 1 : 50

3.00
3.00

WATER WATER
2.00

TORN TORN
GAZEBO

3.00
+0.40

DENAH GAZEBO DENAH MENARA TORN


skala 1 : 50 skala 1 : 50
12.00
1.50 3.00 3.00 1.50 3.00

T. BILAS SUPIR T. BILAS SUPIR

2.00
TOILET +0.20 +0.20 TOILET
+0.15 +0.15
RUANG GENSET

3.00
3.00
+0.20

S E L A S A R +0.15

1.00
DENAH T. BILAS & R. GENSET
skala 1 : 50

3.00

POS JAGA
2.00

+0.20

DENAH POS JAGA


skala 1 : 50
TAMPAK DEPAN MUSHOLA SAMPING KANAN MUSHOLA
skala 1 : 100 skala 1 : 100

SAMPING KIRI MUSHOLA TAMPAK BELAKANG MUSHOLA


skala 1 : 100 skala 1 : 100
DETAIL MENARA TORN
skala 1 : 100
80

MUKA TANAH ASLI MUKA TANAH ASLI

TANAH URUG TANAH URUG

130
18 D 16 DETAIL FOOTPLAT FP-1
skala 1 : 20

200
20 13 D 16
16 D 16

30 13 D 16
16 D 16

10 LANTAI KERJA K-250


10 PASIR URUG TB: 10 CM

400
BUIS BETON D 100 CM

BUIS BETON D 100 CM

200
KOLOM K-1
200

BETON SIKLOP K-250 60 x 80


16 D 16
16 D 16

13 D 16

PASIR URUG TB: 10 CM

13 D 16
100

240
60

KOLOM K-2 60x60

MUKA TANAH ASLI MUKA TANAH ASLI

TANAH URUG TANAH URUG

130
16 D 16 DETAIL FOOTPLAT FP-2
skala 1 : 20

200
20 13 D 16
13 D 16

30 13 D 16
13 D 16

10
10

400
BUIS BETON D 100 CM

KOLOM K-2
BUIS BETON D 100 CM

200
200

60 x 60
13 D 16
13 D 16

BETON SIKLOP K-250

13 D 16

13 D 16
PASIR URUG TB: 10 CM

200
100
60

KOLOM IWF 600 x 300

STIFNER 15 MM

30
ANGKUR 10 D 19
80
75
FLANDES 19 MM

40
60
KOLOM K-1 60 x 80 A A

80
ANGKUR 10 D 19
KOLOM IWF 600 x 300
FLANDES 19 MM
KOLOM K-1 60 x 80
STIFNER 15 MM
80

POTONGAN A - A TAMPAK ATAS


skala 1 : 10 skala 1 : 10

DETAIL SAMBUNGAN A
skala 1 : 10
Layout Existing (Skala 1:100)
U
B T
S
0 5 15 30
Penggilingan Pad
i
Kebun
Kebun
Kebun
Jalan Desa

Kebun
Kebun
h
Ruma
Kebun
Kebun
KETERANGAN
SALURAN KONTUR
RUMAH TALUD
LUAS LAHAN : 10.316 m
Layout Kontur (Skala 1:100)
U
B T
S
0 5 15 30
Penggilingan Pad
i
Kebun
100.00

99.00
99.00
99.50

99.50
100.00

Kebun
Kebun
Jalan Desa

99.50

99.00
99.00 98.50
98.50
Kebun

99.
50
Kebun
h
Ruma
Kebun
Kebun
KETERANGAN
SALURAN KONTUR
RUMAH TALUD
LUAS LAHAN : 10.316 m
Layout Potongan (Skala 1:100)
U
B T
S
0 5 15 30
Penggilingan Pad
i
Kebun
1
A

2
Kebun
Kebun
Jalan Desa

3
4
Kebun
5
Kebun
h
6 Ruma
B

D
Kebun

F
Kebun
KETERANGAN
SALURAN KONTUR
RUMAH TALUD
LUAS LAHAN : 10.316 m
Potongan Memanjang dan Melintang (Skala 1:100)
U
B T
S
0 5 15 30
Penggilingan Pad
i
Kebun
100.00

1
A

99.00
99.00
99.50

99.50
100.00

2
Kebun
Kebun
Jalan Desa

99.50

3
99.00
98.50
4
99.00
98.50
Kebun
5

99.
50
Kebun
h
6 Ruma
B

D
Kebun

F
Kebun
KETERANGAN
SALURAN KONTUR
RUMAH TALUD
LUAS LAHAN : 10.316 m
Potongan Memanjang dan Melintang (Skala 1:100)

105.00 105.00
104.00 104.00

103.00 103.00

102.00 102.00

101.00 101.00

100.00
Kebun Kebun 100.00
Kebun
99.00 99.00

98.00 98.00

97.00 97.00

96.00 96.00

95.00 95.00
94.00 94.00

93.00 93.00

92.00 92.00

91.00 91.00
SECTION A SECTION 1
DATUM +90.00 90.00 DATUM +90.00 90.00
JARAK (m) JARAK (m)

ELEVASI (m) ELEVASI (m)

EXISTING
EXISTING
ELEVASI RENCANA ELEVASI RENCANA
(m) (m)

105.00 105.00
104.00 104.00

103.00 103.00

102.00 102.00

101.00 101.00

100.00 Kebun Kebun 100.00 Kebun Kebun


99.00 99.00

98.00 98.00

97.00 97.00

96.00 96.00

95.00 95.00
94.00 94.00

93.00 93.00

92.00 92.00

91.00 91.00
SECTION B SECTION 2
DATUM +90.00 90.00 DATUM +90.00 90.00
JARAK (m) JARAK (m)

ELEVASI (m) ELEVASI (m)

EXISTING
EXISTING
ELEVASI RENCANA ELEVASI RENCANA
(m) (m)

105.00 105.00
104.00 104.00

103.00 103.00

102.00 102.00

101.00 101.00

100.00 Kebun Kebun 100.00 Kebun Kebun


99.00 99.00

98.00 98.00

97.00 97.00

96.00 96.00

95.00 95.00
94.00 94.00

93.00 93.00

92.00 92.00

91.00 91.00
SECTION C SECTION 3
DATUM +90.00 90.00 DATUM +90.00 90.00
JARAK (m) JARAK (m)

ELEVASI (m) ELEVASI (m)

EXISTING
EXISTING
ELEVASI RENCANA ELEVASI RENCANA
(m) (m)

105.00 105.00
104.00 104.00

103.00 103.00

102.00 102.00

101.00 101.00

Kebun Kebun Kebun


100.00 Kebun 100.00
99.00 99.00

98.00 98.00

97.00 97.00

96.00 96.00

95.00 95.00
94.00 94.00

93.00 93.00

92.00 92.00

91.00 91.00
SECTION D SECTION 4
DATUM +90.00 90.00 DATUM +90.00 90.00
JARAK (m) JARAK (m)

ELEVASI (m) ELEVASI (m)

EXISTING
EXISTING

ELEVASI RENCANA ELEVASI RENCANA


(m) (m)

105.00 105.00
104.00 104.00

103.00 103.00

102.00 102.00

101.00 101.00
Kebun Kebun Kebun Kebun
100.00 100.00
99.00 99.00

98.00 98.00

97.00 97.00

96.00 96.00

95.00 95.00
94.00 94.00

93.00 93.00

92.00 92.00

91.00 91.00
SECTION E SECTION 5
DATUM +90.00 90.00 DATUM +90.00 90.00
JARAK (m) JARAK (m)

ELEVASI (m) ELEVASI (m)

EXISTING
EXISTING

ELEVASI RENCANA ELEVASI RENCANA


(m) (m)

105.00 105.00
104.00 104.00

103.00 103.00

102.00 102.00

101.00 101.00
Kebun Kebun Kebun Rumah
100.00 100.00 Kebun
99.00 99.00

98.00 98.00

97.00 97.00

96.00 96.00

95.00 95.00
94.00 94.00

93.00 93.00

92.00 92.00

91.00 91.00
SECTION F SECTION 6
DATUM +90.00 90.00 DATUM +90.00 90.00
JARAK (m) JARAK (m)

ELEVASI (m) ELEVASI (m)

EXISTING
EXISTING

ELEVASI RENCANA ELEVASI RENCANA


(m) (m)

You might also like