POST MARK GRID LOCATION ELEVATION SHOP MATERIAL LIST FOR 1 ASSEMBLY

2HR1/10 G1/3 +21.563 Length Area Weight


Post Mark Profile Size Qty. (mm) (m 2) (kg)
2HR1/10 G2/3 +21.563
PIPE Ø1-1/4/1 PIPE Ø 1.1/4" 1 666 0.10 2.16
Total 0.10 2.16

BOLT LIST FOR ASSEMBLY 2HR1/10 Qty. 2


Dia. Grade Type Length Qty. Member

28

666

2HR1/10 PIPE Ø 1.1 /4"

DRAWING NO. TITLE


REFERENCE DRAWING

PREP'D APP'D CHK'D APP'D


NO. DATE DESCRIPTION

REVISIONS

OWNER :

PT. SEMEN INDONESIA (PERSERO) Tbk.

CONTRACTOR :

PT. CAHYA TEGAR KENCANA

PROJECT :
REKONDISI CEMENT LOADING TT-3

TITLE :
CEMENT LOADING TT-3
GALLERY AIRSLIDE
RAILING 2HR1/10
DESCRP. DRAWN CHECKED CHECKED APPROVED SCALE :
1:5
DATE

SIGN SIZE
Tekla Structures

A3
NAME
COMPANY
TOTAL ASSEMBLY SD-ASSY-TT3-02- 2HR1/10 DWG No. SHEET REV.

Qty = 2 Area = 0.20 M 2 Weight = 4.32 kg SD-ASSY-TT3-02-2HR1/10 1 OF 1 0