Fire Drill

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

Page 1 of 1

COMPANY REPORT FORMS AND CHECKLIST


Revision 0
CHECKLIST 03-08
Date: May 15, 2016

DRILLS AND EXERCISES RECORDS

SHIP NAME: Blessed Sea Journey DATE: 27 March 2022

TYPE/S OF DRILL: Fire Drill LAST DATE: no record

BRIEF DESCRIPTION OF DRILLS MASTER’S EVALUATION AND


LOCATION
CONDUCTED COMMENTS

Coron, palawan in Ramp Scenario : Fire in the galley

1. Sounded the alarm - crew mustered 1. Crew familiarization on how to use


1500h - 1530h at the muster station conducted brief portable fire extinguisher.
safety meeting as per the drill.
2 Exercise fire hose nozzle, apply
2 Crew proceed to their station as per grease regularly to loosen spray type
muster list. Attack team prepared fire nozzles grip.
hose, portable fire extinguisher, fire
axe. Engine room start emergency fire
pump. Close all ventilation and, air
conditioning and watertight doors.Start
to fight fire. Back up team start cooling
the boundaries

3. Continue communication with the


passenger control team. Maintained
passenger control.

4. Maintained communication with


engine room.

5. Chief officer declared fire clear,


checked for any injury, assesed
damaged and cause of fire.

7. Dismised the drill.

Prepared By: Approved By:

Leomar M. Eleazar Capt. Anecito T. Asuncion


Chief Mate Master
Signature/Date March 27, 2022 Signature/Date March 27, 2022

You might also like