Switch A Switch B: Network Diagram

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8

MIMIC GPS/NTP
IEC-104 (A3) IEC-104 (A0)
Operation No.1 Operation No.2 Server
Engineer laptop
Gateway1 Gateway2

Switch A Switch B

Optical fiber 1Gbps

TCP/IP TCP/IP TCP/IP TCP/IP TCP/IP

Synchronizer Controller & I/O Controller & I/O Controller & I/O Controller & I/O Controller & I/O

Modbus RTU Unit 1 Common control of switchyard Auxiliary equipment Spillway Intake
Unit 2

IEC61850

Excitation Governor IEC61850


Air system
MIV control
DC aux power
Unit oil & water Water system
Bay protection no.1
IEC61850 Bay protection no….
Bay protection no.N

BCU
G-T Protection 1

Bay control no.1


Bay control no…. LEGEND
Out of OCI’s scope
Bay control no.N Optical cable
G-T Protection 2
Ethernet cable
RS485

Revision Name Date Project Name


Decsription A Luoi Hydropower Plant
Drawn THE.M.D
Network diagram Page
Job Number Drawing set
Checked KHOA.T.D 1