TIME AND WORK

1) A can do a piece of work in 30 days and B can do same work in 60 days. In how many days will A
& B do this work together ?
2) A can do a piece of work in 20 days and B can do same work in 30 days. In how many days will A
& B do this work together ?
3) A can do a piece of work in 15 days and B can do same work in 45 days. In how many days will A
& B do this work together ?
4) A can do a piece of work in 10 days and B can do same work in 16 days. In how many days will A
& B do this work together ?
5) A can do a piece of work in 45 days and B can do same work in 60 days. In how many days will A
& B do this work together ?
6) A, B and C can do a piece of work in 12, 15 and 20 days respectively. In how many days will all
three do this work together ?
7) A, B and C can do a piece of work in 10, 12 and 115 days respectively. In how many days will all
three do this work together ?
8) A, B and C can do a piece of work in 15, 18 and 20 days respectively. In how many days will all
three do this work together ?
9) A, B and C can do a piece of work in 10, 30 and 45 days respectively. In how many days will all
three do this work together ?
10) A, B and C can do a piece of work in 45, 75 and 90days respectively. In how many days will all
three do this work together ?
11) A and B can do a work in 15 days and 20 days respectively B started the work and they work on
alternate days. Find the number of days it will take them to complete the work
12) A and B can do a work in 12 days and 36 days respectively B started the work and they work on
alternate days. Find the number of days it will take them to complete the work
13) (A + B) can do a piece of work in 20 days and A can do same work in 60 days. In how many days
will B do this work ?
14) (A + B) can do a piece of work in 15 days and A can do same work in 30 days. In how many days
will B do this work ?
15) A can do a piece of work in 10 days and B can do same work in 15 days. Both A and B start the
work and after 3 days B left. In how many days will A do the remaining work?
16) A can do a piece of work in 15 days and B can do same work in 25 days. Both A and B start the
work and after 3 days B left. In how many days will A do the remaining work?
17) A can do a piece of work in 20 days and B can do same work in 35 days. Both A and B start the
work and after 3 days B left. In how many days will A do the remaining work?
18) A can do a piece of work in 12 days and B can do same work in 18 days. Both A and B start the
work and after some days A left and B complete the remaining work in 8 days. After how many
days will A left work?
19) A can do a piece of work in 25 days and B can do same work in 45 days. Both A and B start the
work and after some days A left and B complete the remaining work in 10 days. After how many
days will A left work?

QUANT MADE EASY WITH YOGESH REDHU SIR


PH:-9812334440,7330303103
TIME AND WORK
20) A, B and C can do a work in 25, 40 and 60 days respectively. All three start the work together
and work for 5 days then A left and B left 10 days before the completion of work, how much
time shall be taken to do whole work?
21) A, B and C can do a work in 10, 12 and 15 days respectively. All three start the work together but
A left 5 days before the completion of the work and after 2 days B left, how much time shall be
taken to do whole work?
22) A can make 1/3 part of a wall in 9 days and B can make 2/3 part of a wall in 9 days. In how many
days will A and B complete the total work ?
23) A can make 1/4 part of a wall in 4 days and B can make 2/3 part of a wall in 16 days. In how
many days will A and B complete the total work ?
24) A can make 2/5 part of a wall in 10 days and B can make ¾ part of a wall in 9 days. In how many
days will A and B complete the total work ?
25) A does 4/5 part of the work in 20 days and rest of the work is done by A and B in 3 days. In what
time can B do the whole work.
26) A does 3/4 part of the work in 15 days and rest of the work is done by A and B in 2 days. In what
time can B do the whole work.
27) A can do a piece of work in 4 hours. (B + C) can do the same work in 3 hours. (A + C) can do the
same work in 2 hours. In how many hours will B do this work alone ?
28) (A + B) together can do a piece of work in 12 days. While (B + C) together can do a piece of work
in 15 days. (C + A) together can do a piece of work in 20 days. In how many days will this work
be completed by A, B and C alone and (A + B + C) together ?
29) (A + B) together can do a piece of work in 10 days. While (B + C) together can do a piece of work
in 12 days. (C + A) together can do a piece of work in 15 days. In how many days will this work
be completed by A, B and C alone and (A + B + C) together ?
30) (A + B) together can do a piece of work in 20 days. While (B + C) together can do a piece of work
in 30 days. (C + A) together can do a piece of work in 60 days. In how many days will this work
be completed by A, B and C alone and (A + B + C) together ?
31) Ratio of efficiency of P and Q is 3 : 4. Find the ratio of number of days they will take to complete
the work.
32) Ratio of efficiency of P and Q is 5 : 7. Find the ratio of number of days they will take to complete
the work.
33) A is 40 % more efficient than B. If B can complete this work in 24 days. In how many days will
both A and B complete this work ?
34) A works thrice as much as B. If A can complete this work in 12 days, then in how many days will
both A and B complete this work ?
35) B works four times as much as A. If B takes 15 days less than A to complete this work. In how
many days will A and B alone complete this work ?
36) A works Three times as much as B. If A takes 10 days less than B to complete this work. In how
many days will A and B alone complete this work ?

QUANT MADE EASY WITH YOGESH REDHU SIR


PH:-9812334440,7330303103
TIME AND WORK
37) A is 40 % more efficient than B and B is 20 % less efficient than C. If A takes 6 days less than C to
complete a work, then in how many days will B complete this work ?
38) Efficiency of A is 3/4 of B's efficiency and B's efficiency is 80% of C's efficiency. If A takes 120
more days than that of B and C working together to finish a certain piece of work. Then in how
many days working together they will finish the work?
39) The ratio of efficiency of A and B is 3 : 5 and that of B and C is 2 : 3 respectively. If A and B work
for 4 days then remaining work is finished by C in 8 days. Then in how many days B alone will
finish the work?
40) A takes three times as long as (B + C) together to complete a work. B takes four times as much
as (A + C) together to complete a work. If all the three, working together can complete the work
in 22 days, then find the number of days A, B and C alone will take to complete this work.
41) B takes two times as long as (A + C) together to complete a work. C takes three times as much as
(A + B) together to complete a work. If all the three, working together can complete the work in
36 days, then find the number of days A, B and C alone will take to complete this work.
42) A take three times as long as B and C together to do a job. B takes four times as long as A and C
together to do the work. If all the three, working together can complete the job in 24 days, then
the number of days, A alone will take to finish the job is
43) A does half as much as work as B in 3/4 of the time. If together they take 18 days to complete a
work, how much time shall B take to do it alone ?
44) A does half as much as work as B in 1/ 6 of the time. If together they take 10 days to complete a
work, how much time shall B take to do it alone ?
45) (A + B) can do a piece of work in 12 days. (B + C) can do same work in 16 days. A work for 5
days, B works for 7 days and C completed the remaining work in 13 days. In how many days will
A, B and C do this work alone ?
46) (A + B) can do a piece of work in 12 days. (B + C) can do same work in days. A work for 3 days,
B works for 4 days and C completed the remaining work in 7 days. In how many days will A, B
and C do this work alone ?
47) A and B together can do a piece of work in 30 days, B and C together can do it in 20 days. A
starts the work and work on it for 5 days, then B takes up and work for 15 days. Finally C finishes
the work in 18 days. The number of days in which C alone can do the work where doing it
separately is:
48) A work for 2 days, then B complete the remaining work in 9 days. If A work for 3 days, then B
complete the remaining work in 6 days. In how many days will A and B do this work alone ?
49) (A + B) can do a piece of work in 10 days. A works days and B works for days, then half of
the work has been completed. In how many days will B do this work alone ?
50) (A + B) can do a piece of work in 14 days. A works days and B works for days, then half of
the work has been completed. In how many days will B do this work alone ?

QUANT MADE EASY WITH YOGESH REDHU SIR


PH:-9812334440,7330303103
TIME AND WORK
51) (A + B) can do a piece of work in 5 days. If A works with twice of his efficiency and B works with
1 3 of his efficiency, then work will be completed in 3 days. In how many days will A do this work
alone ?
52) (A + B) can do a piece of work in 5 days. If A works with twice of his efficiency and B works with
half of his efficiency, then work will be completed in 4 days. In how many days will A and B do
this work alone ?
53) 12 men can complete a work in 18 days. Six days after they started working, 4 men joined them.
How many days will all of them take to finish the remaining work ?
54) A can write 75 pages in 25 hrs. A and B together can write 135 pages in 27 hrs. In what time can
B write 42 pages ?
55) A piece of work can be done by 6 men and 5 women in 6 days or 3 men and 4 women in 10 days.
It can be done by 9 men and 15 women in
56) If the work done by 8 men and 4 boys in 1 day is 7 times the work done by 1 man and 1 boy,
then compare the work done by 1 man and 1 boy in 1 day ?
57) If 10 men or 18 boys can do a pieceof work in 15 days, then 25 men and 15 boys together will do
twice the work in :
58) 10 men can make 20 toys in 12 days working 12 h a day. Then, in how many days can 24 person
make 32 toys working 16 h a days
59) If 12 men and 16 boys can finish a work in 5 days, while 13 men and 24 boys can finish the same
work in 4 days. Compare the one day work of 1 man and 1 boy ?
60) If 6 men and 8 boys can do a piece of work in 10 days and 26 men and 48 boys can do the same
in 2 days, then the time taken by 15 men and 20 boys to do the same type of work will be:
61) 5 men can do a piece of work in 6 days while 10 women can do it in 5 days. In how many days
can 5 women and 3 men do it?
62) A wall of 100 metres can be built by 7 men or 10 women in 10 days. How many days will 14 men
and 20 women take to build a wall of 600 metres
63) One men, 3 women and 4 boys can do a piece of work in 96 hours, 2 men and 8 boys can do it in
80 hours, 2 men and 3 women can do it in 120 hours, 5 men and 12 boys can do it in
64) A 10 hectare field is reaped by 2 men, 3 women and 4 children together in 10 days. If working
capabilites of a man, a women and a child are in the ratio 5 : 4 : 2, then a 16 hectare field will be
reaped by 6 men, 4 women and 7 children in.
65) Amit and Surjit together can complete an assignment of data entry in 5 days. Surjit’s speed in
80% of Amit’s speed and the total key depressions in the assignment are 5,76,000. What is the
Amit’s speed in key depressions per hour if they work for 8 hours a day ?
66) A road of 5 km length will be constructed in 100 days. So 280 workers were employed. but after
80 days it was found that only 3.5 km road was completed. Now how many more people were
need to finish the work in the specified time?
67) A contractor undertook to finish a work in 92 days and employed 110 men. After 48 days, he
found that he had already done 3 5 part of the work, the number of men he can withdraw so
that his work may still be finished in time is:

QUANT MADE EASY WITH YOGESH REDHU SIR


PH:-9812334440,7330303103
TIME AND WORK
68) A man undertakes to do a certain work in 150 days. He employs 200 men. He finds that only a
quarter of the work is done in 50 days. The number of additional men that should be appointed
so that the whole work will be finished in time is:
69) P and Q together can do a job in 6 days. Q and R can finish the same job in 60/7 days. P started
the work and worked for 3 days. Q and R continued for 6 days. Then the difference of days in
which R and P can complete the job alone is?
70) There is sufficient food for 400 men for 31 days. After 28 days 280 men leave the place for ho
wmany days will the rest of the food last for the rest of men ?