Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

MUSTER LINK INSPECTION No Dokumen

Tanggal Efektif
Form-HSE-TMR-003
1/13/2022
STANDARD No Revisi 1
PT PP(Persero)Tbk, Div.EPC - CFSPP TIMOR-1 (2x50 MW)
(PP/No.50/2012) Halaman 1/1

Inspection Date : _____________________________


Owner : _____________________________

Register Number : _____________________________

INSPECTION METHOD INSPECTION RESULT


No INSPECTION ITEM STANDARDS REASON FOR NOT COMPLY
VISUAL FUNCTION GOOD NOT GOOD
No crack,bent,stretched,heat damage (tidak retak,bengkok,rusak karena
1 Link by link of chain
panas)
2 Capacity tag Available,readable (tersedia,terbaca)
3 Master link or coupling No deformed
4 Certicate Valid from authority juridiction (valid,dari pihak yang berwenang)
5 Hook Safety lack work,no bent (pengunci berfungsi,tidak bengkok) `
6 Chain Not corrosive (tidak berkarat)

INSPECTION STATUS
PASSED Stiker Number

HOLD Stiker Number

REJECTED Stiker Number

INSPECTION DURATION : TO
SPECIAL NOTE FROM :

Panjang : _______ m
Swl : _______

Inspected By Approved By Acknowladge By

HSE Inspector Site Manager HSE Site Manager


Name and Signature Name and Signature Name and Signature

You might also like