Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Objective

P. Aravinth  To be a motivated engineering professional and there by utilize my


technical expertise to accomplish the ultimate goals with sincerity,
enabling me to team up with an organization where excellence & quality
is a way of life.

Education

 Master of Engineering (Structural Engineering),


Government College of Technology, (2002 –04, 7.58 CGPA)
Affiliated to Anna University, Coimbatore.

 Bachelor of Engineering (Civil Engineering)


PSNA College of Engineering & Technology,(1996-2000, 74.5%)
Affiliated to Madurai Kamaraj University, Dindigul.

Professional Experience
MIE., Chartered Engineer
M-153672 Overall Experience: 15+ years in Structural Engineering

Email: From January 2019 till date working as Lead Engineer in Fichtner India
aravinthp79@gmail.com Pvt Ltd., Chennai.
aravinthp@yahoo.com
From February 2010 to December 2018 – Mott Mac Donald Pvt Ltd.,
Mobile: Chennai. Designation : Principal Structural Engineer.
+9194443 61299
Roles and Responsibilites
Contact Address:  Experience in analysis and design of Main Power plant structures,
No 110, SF1A, Balance Of Plant (BOP), Non Plant buildings, Chimney design,
Vasanth Apartment,
water-retaining structures, design of Pipe & cable racks,
MS Kovil Street,
Royapuram, Commercial IT parks, industrial sheds and institutional buildings,
Chennai – 600 013  Proficient in various software: Staad Pro V8i, SAP2000, Etabs 2013,
Robot, Fastrak, Prokon & TEDDS
Personal Data:  Good knowledge of Indian Standards(IS), Eurocodes (EC), American
Standards (ACI) and British Standards(BS).
DOB : 06-03-1979.  Proficient in reviewing construction documents and checking per
Gender : Male. QA/QC standards.
Nationality : Indian.
Marital Status : Married.  Experience in budgeting - estimate man-hours; Experience in guiding
Father’s Name : Dr.P.Periathambi junior team members.
 Proficient in Inter-Disciplinary coordination with Mechanical, Piping,
Linguistic Abilities: Electrical, Architectural, Plumbing from schematic design through
Tamil, English. construction.
 Familiar in reviewing model with Naviswork and clash detection.
Favourite Pursuits:
Yoga, Kabbadi. Design Exposure

 Power Plant Sector - STG building, HRSG & Main stack foundation,
Bye Pass stack foundation, GTG dynamic foundation, RCC
Chimneys, enclosed and open steel structures, Pipe racks, Pump
houses & Non-Plant buildings.
 Water Sector - Design of effluent treatment plant PST, SST tanks
potable water and fire water tanks, swimming pool.
 Built Environment Sector - Flat slab & Flat plates, Steel/composite
floors/Precast slab, Disproportionate collapse, Shear walls.

BMS – QA/QC Management

 Preparing design calculations for Warrant submissions to clients.


 Comprehensively check the design calculations and drawings as per
BMS standard practices.
 Interacting with clients and attending client meetings.
 Checking shop drawings.

Overseas assignment for Projects

 Leeds Allerton BSF Grange school, Sheffield UK.


 Rosebowl block Stadium Birmingham, UK.
 St.Peter College, Hongkong.
 2x171 MW Jindal JSPL, Gaborone, Botswana, Southern Africa.
From January 2019 to till date FICHTNER Consulting Engineers (India) Pvt. Ltd, Chennai.
Assignments/Project handled
Cap Des Biches Combined Cycle Power Station Project, Dakar, Senegal, West Africa 300MW
Worked as a Technical lead for this project. Responsibility includes preparation of Civil, Structural,
Architectural Design basis report, Technical specifications as per Eurocodes, Preliminary and detailed BOQ to the
EPC contractor Calik Enerji.
Analysis and design of Power Plant as per Eurocodes using SAP2000 for Concrete, steel enclosed and open steel
structures - STG building with 57T/10T cranes, HRSG and Main Stack (45m height) Foundations, Bye pass stack
(42m Height) Foundation, GTG dynamic Foundation design, Administration building, Pipe racks, RMS building,
GIS building, Fuel Oil Forwarding Pump Shelter, Air compressor building, car parking,
As per the Geotechnical report, soil is swelling in nature and all the main structures are designed as Raft with
Micropiles (150mm dia and 300mm dia -11m deep).

Prepare Tender documents for 2x171 MW Green field Coal Fired Power plant in Botswana, Southern Africa,
(As an Independent Power Producer by Jindal JSPL, South Africa)
Two weeks Site visit to Botswana, Southern Africa to understand the material availability, shipping of
equipment’s and materials, cost analysis and cost implications.
Involved in the preparation of Bank Feasibility study report (civil part), Civil, Structural & Architectural Owner
Tender specifications for main plant, Balance of Plant (BOP) and Non plant buildings, design criteria’s and
Finalisation of Plot plan.

Deputed to TechnipFMC for ARCTIC LNG 2 Projects for 15 months.


Involved in the Structural analysis and design of TMS 003 & TMS 004 Modules - Equipment supports, Monorails
and Secondary framing arrangement for decks.
In-Service and Sea Transportation Analysis
 Reviewed each of the mechanical equipment inputs & the loading data.
 Modelled the structural arrangement in STAAD with Equipment dummy legs supported on the respective
decks.
 Preparation of Load calculation – Dead, live, wind, blast load, snow and ice loads.
 Structural analysis and design as per Russian code SP 16.
 Checked and Optimized the structural members with respect to Weight control report (WCR)
 Reviewed the Steel GA drawings, equipment support details extracted from E3D.
 Preparation of Calculation note.

Mouda super thermal power project, Stage II (2x660MW)- Unit No. 3 & 4, (FGD) system package.
Involved in the analysis, design & detailed engineering of Chimney (Shell only condition and Shell with lining
condition), Flue Gas Duct Supporting Structures and Lime stone unloading shed, BRU shed, UG sumps.
Preparation of design documents and got the approval from NTPC.

Tata Steel Limited, Kalinganagar, Odisha, Overhead Yard Piping & cable gallery for the inter plot
connectivity route
Involved in the analysis, design & detailed engineering of pipe rack using Staad Pro V8i. And preparation of
design document.
Feb 2010 – Dec 2018 Mott MacDonald, Chennai.
Principal Structural Engineer, Chennai, India
Projects Involved:
Greenfield VSF Vilayat Project, Gujarat. India.
Lead engineer responsible for the analysis and design of the main VSF plant & Auxiliary plant includes Pulper and
slurry section, Xanthation, ripening room & Flash deaerator, Spinning area, After treatment, Dryer and Bailing
portion, MSFE plant & Salt recovery plant.
The structure is modelled as three-dimensional frames. The structure is analysed for dead load, live load, super
imposed dead, equipment dead load, equipment operating load, Wind load & Seismic loads using Staad Pro V8i.
Analysis and design is done based on IS 456:2000, IS 1893 -2002. Worked and guided engineers on the design &
detailing, checking of design document, drawings & co-ordination with the lead office and the site.
Aluminium Extrusion Plant, Abu Dhabi – Talex
Lead Engineer responsible for the analysis and design of Waste water tank, Piezometric tower, three scrap
buildings & Logistics centre. The waste storage tank is modeled and analyzed in STAAD using Finite element,
checked manually with Moody's chart and designed. Assisted in the preparation & checking of drawings.

SATAH AL RAZBOOT (SARB – 6) MM Dubai.


Lead engineer responsible for detailed analysis and design of GRP water tank supporting structure - potable water
tank, fire water tank and drainage collection tank for helideck. And prepared the calculation report which includes
foundation design, bearing pressure, sliding, overturning, crack width check and steel beam design as per
ACI – 318. And carried out the Foundation design and calculation report for the module A, B & C buildings. Worked
and guided engineers on the design & detailing, checking of design document, drawings & co-ordination with the
MM Dubai Office.

SWTP - Tareeq Al Matar at Saudi Arabia - For Kentz Engg. International Co. Ltd.
Team lead responsible for the completion of various stages of design - 60%, 90% & IFC and detailing of the
various elements of SWTP - Primary sedimentation tank (Four circular tank of 30m dia) , Secondary sedimentation
tank (Four circular tank of 37m dia), Primary pump station & distribution well, Secondary pump station &
distribution well, Chlorine contact tank, PST Sludge well. All the structural elements were designed for
Environmental Concrete Structures ACI 350-06 and ACI 318M-08. Attended design review meeting of clients -
Kentz and reviewer M/s. Jacobs (UK) and got the approval for design document and drawings.

Raw Water Treatment Plant - Jindal Steel and Power Ltd., Orissa, India.
Lead Engineer responsible for the analysis, detailed design and documentation of the Raw Water Treatment Plant
for Jindal Steel & Power Ltd. The Raw Water treatment plant consists of Common make up water sump, Pump
House, MCC Room, Common drinking water sump, UHRC, Chemical house and Chlorine house.
The common make up water sump is 15m wide x50m length, height is 9.8m. It is designed using IS 3370 - outer
wall with counterforts at every 5m intervals and column spaced at 7.5m centre between the walls.

Indospace, Chennai, India


Lead Engineer responsible for Value Engineering & reviewing the Structural design & drawing. This project is an
Industrial warehouse of around 50 acres of land which the client wants to develop in two phases.

Portland Park, MM Newcastle, UK:


This is a six-storey concrete framed structure with a single basement. The slab system is flat plate and punching
checks were carried out and additional shear reinforcements were provided for the flat plate.
Lower ground floor was designed for two cases - suspended slab considering uplift pressure (water table
for 3m height) and downward gravity load cases.The entire structure is modelled, analysed & designed using Orion
software R18 for EC2. Responsible for co-ordination, checking of Orion model and the Revit model developed.

Liverpool commercial development, MM Sydney, Australia:


Lead Engineer assisted in the concept, Schematic and detailed analysis & design of Liverpool commercial
development. The Commercial building is of 3 basements & G + 7 stories, the structural system is floor slabs
supported by band beams and by diaphragm action transferred to the shear walls. The structure is modelled,
analysed and designed for gravity and lateral loads using Etabs 2013. And reviewed the design report, Revit model
and 2D floor plans, section, elevations, details, staircase drawings.

Shell India Markets Private Limited, Bangalore, India.


Lead Engineer responsible for detailed analysis & design of NTCB - Office building. This is a RC building with
basement+ground+8 floors. The entire structure is analysed & designed using Staad Pro V8i based on IS 456-
2000 & IS 1893-2002. The floor loads are transferred to the RC columns & shear walls by flat slabs with drop
system. The lateral drifts and deflections are checked for serviceability limits.
Oct 2009 – Feb 2010 CDM INDIA PVT LTD. Structural Engineer (Structural Level -3)
Projects Involved:
- Fourche Creek Waste Water Treatment Plant, USA
- South Waste Water Treatment Plant, USA
Modelling the structure and analysing the structure using Staad Pro V8i for various load combinations which
includes seismic analysis and designed using ACI 350.06 & ACI 318-08 code.

2007 – 2009 MOTT MACDONALD GROUP Senior Structural Engineer, Chennai, India
Dundee University - MM Aberdeen, UK.
Senior structural engineer responsible for the RIBA Stage D structural design & drafting of the four storey
reinforced concrete flat slab building. Floors comprise flat slab construction supported by internal and external
columns and walls.

Occupational Therapy Store & Resource Centre - MM Aberdeen, UK.


Senior structural engineer responsible for analysis & design of the steel framed three-storey building. The
structure is rectangular in plan with a mono pitched roof, 33.0mx 20.0m in plan area. Lateral stability is provided by
the 1st and 2nd floor composite concrete and steel floor deck system acting as a diaphragm and taking the wind
loads back to vertical bracing in the two gable elevations and the two long elevations.

Karachi Port Trust Enclave - MM Dubai.


Preliminary analysis of 32 storey building – Response spectrum method of analysis is used for earthquake
analysis. Modelling, Analysis and Design of Flat slab, beam, column, shear wall and spandrel beams,
Disproportionate collapse were done using Etabs software.

2004 – 2007 CRUTHI CONSULTANT CONSORTIUM PVT. LTD, Bangalore.


Structural Engineer
LIST OF PROJECTS DONE:
 Pride Silica, Bangalore – Commercial building (B+G+12)
 Centenary Arcades, Mysore – Commercial building (B+G+5)
 Jhanavi Meadows, Bangalore - Residential apartment (B+G+8)
 Indusfila, Hindupura - 40m span Truss – Industrial building
 Saaya Apartment, Bangalore – (G+5)
 Tata Motors, Vellore – Show room (B+G+3)
 Mr.Narayana Murthy Residence, Infosys Chairman, Bangalore – (G+2)
Paper Presentation:
Venue : Thiagarajar College of Technology, Madurai. BULTEC ’99 paper presented on
‘Polymer Applications’ in National Level Students Technical Symposium.

Venue : Anna University, Guindy College of Engineering, Chennai.


CIVILISATION ‘2000 paper presented on ‘Fiber Reinforced Concrete’ in National Level
Students Technical Symposium. & Won Quiz competition.

Presented a technical paper entitled “HIGH PERFORMANCE CONCRETE”, in all India Seminar on ‘Emerging
Trends in Structural Mechanics & Composites’ (ETSMC—2003) held at National Institute of Technology,
st nd
Rourkela, Orissa during 1 and 2 Nov ‘2003 as Post Graduate Scholar.

Declaration:

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my
qualifications, and my experience.

Yours sincerely,
Aravinth Periathambi

You might also like