STANDARD CHECKLIST

EQUIPMENT: MOTOR

Page 1 of 2
PREVENTIVE MAINTENANCE – 6 MONTHS
Trade: ELEC

EQUIPMENT LIST
Machine ID / SN.
Location
Date Time (Start) Time (End)
CHECKLIST
Executed
No. Work Description Remarks
Yes No
Check the condition of motor casing and
1 ☐ ☐
mounting frame.

2 Visual check the terminal box condition. ☐ ☐

Check cable termination for looseness. Tighten


3 ☐ ☐
all electrical connections.

Ensure earthing cable in good condition and


4 ☐ ☐
termination.

5 Check the condition of cable glands ☐ ☐

Check the equipment tag and name plate if it is


6 ☐ ☐
rusty, readable or missing

7 Inspect the fan cowls for any damage ☐ ☐

Apply lubricant in between stator and armature


8 ☐ ☐
windings. if necessary
Moving parts inspection. Replace / re-apply
9 lubricant bearing grease of motor and fan ☐ ☐
operation
Ensure manual emergency button working for
10 ☐ ☐
safety

11 Test run on/off through Scada PLC. ☐ ☐

12 Others: ☐ ☐

 | Rev1 (6.12.2018)
STANDARD CHECKLIST
EQUIPMENT: MOTOR

Page 2 of 2
PREVENTIVE MAINTENANCE – 6 MONTHS
Trade: ELEC

Note:

CORRECTIVE MAINTENANCE
Yes ☐
Is Cm Required? Work Order (requested):
No ☐

ELECTRICAL DEPARTMENT
Maintained by Designation Signature Date Time

Approval by Designation Signature Date Time

PRODUCTION DEPARTMENT
Approval by Designation Signature Date Time

 | Rev1 (6.12.2018)