DETAILED ENGINEERING ASSESSMENT OF TEN STORIED RCC

BUILDING-1 OF Rupa Knitwear (Pvt) Ltd & Rupa Fabrics Ltd.


(KUNIA, BORDBAZAR, GAZIPUR)

Assessed by
Engr. Md. Mehedi Hasan
Lead Structural Engineer,
Sthapona Consultants
M.Sc. (Structural Engineering, BUET) B.Sc. (BUET),
MIEB -24748, Rajuk Reg. DMINB-CE0233.

Md Kazi Iqbal Mahmud


Structural Engineer,
B.Sc. Engr. (Civil), BUET
AMIEB: 14132

May, 2016

Office:
1st Floor, House #18, Road #20,
STHAPONA CONSULTANTS Nikunja-2, Dhaka-1229.
Phone: +880-2-8900838
Email: sthaponaconsultants@gmail.com
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD., DETAILED ENGINEERING ASSESSMENT REPORT
KUNIA, BOARDBAZAR, GAZIPUR.]

TABLE OF CONTENTS

1 INTRODUCTION ..................................................................................................................... 2
2 GENERAL OVERVIEW OF THE BUILDING .................................................................. 2
3 DESTRUCTIVE & NON-DESTRUCTIVE TESTING ...................................................... 3
3.1 EVALUATION OF CONCRETE STRENGTH FROM CORE TEST .................... 3
3.2 VERIFICATION OF REINFORCEMENT USING FERRO-SCANNER &
REMOVING CONCRETE COVER ................................................................................................ 4
4 ANALYSIS FOR STRUCTURAL ADEQUACY ................................................................ 5
4.1 STRUCTURAL SYSTEM ..................................................................................................... 5
4.2 CODES AND PRACTICES .................................................................................................. 7
4.3 MATERIAL PROPERTY ..................................................................................................... 7
5 EVALUATION OF STRUCTURAL MEMBERS ............................................................. 14
5.1 CHECKING ADEQUACY OF FOUNDATION WITH 63PSF LIVE LOAD .. 14
5.2 CHECKING ADEQUACY OF COLUMN WITH 63 PSF LIVE LOADING ... 18
5.3 CHECKING ADEQUACY OF BEAMS WITH 63 PSF LIVE LOADING ........ 35
5.4 CHECKING ADEQUACY OF SLAB WITH 63 PSF LIVE LOAD ..................... 39
6 CONCLUSION ........................................................................................................................ 45
7 RECOMMENDATION .......................................................................................................... 45
8 EVALUATION OF STRUCTURAL MEMBERS AFTER RETROFITTING ............ 46
8.1 CHECKING ADEQUACY OF FOUNDATION AFTER RETROFITTING ... 46
9 CHECKING ADEQUACY OF COLUMN AFTER RETROFITTING .............................. 50
9.1 CHECKING ADEQUACY OF BEAMS AFTER RETROFITTING .................. 62
10 DISCLAIMER ......................................................................................................................... 64

STHAPONA CONSULTANTS i
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD., DETAILED ENGINEERING ASSESSMENT REPORT
KUNIA, BOARDBAZAR, GAZIPUR.]

List of Figures and Tables


Figure 2-1: Location of the Building (Source: Google Earth) ....................................................... 2

Figure 4-1: Flat plate Slab System of Typical Floors (Typical Floor) .......................................... 5

Figure 4-2: 3D View of Analytical Model........................................................................................ 6

Figure 4-3: Applied Floor Finish in typical Floor (psf) ............................................................... 11

Figure 4-4: Applied Live Load in Typical Floor (63 psf) for BNBC .......................................... 12

Figure 4-5: Deflected Shape of the Building ................................................................................. 13

Figure 5-1: Foundation Layout Plan ............................................................................................. 14

Figure 5-2: Node ID of ETABS Model .......................................................................................... 15

Figure 5-3: Column Layout Plan from Model Snapshot ............................................................. 18

Figure 5-4: Overstressed Column (Red Colour) Layout Plan .................................................... 19

Figure 5-5: Condition of Column in Grid 1 .................................................................................. 20

Figure 5-6: Condition of Column in Grid 2 .................................................................................. 21

Figure 5-7: Condition of Column in Grid 3 .................................................................................. 22

Figure 5-8: Condition of Column in Grid 4 .................................................................................. 23

Figure 5-9: Condition of Column in Grid 5 .................................................................................. 24

Figure 5-10: Condition of Column in Grid 6 ................................................................................ 25

Figure 5-11: Condition of Column in Grid 7 ................................................................................ 26

Figure 5-12:: Condition of Column in Grid 8 ............................................................................... 27

Figure 5-13: Condition of Column in Grid 9 ................................................................................ 28

Figure 5-14:: Condition of Column in Grid 10 ............................................................................. 29

Figure 5-15: Condition of Shear Wall in Grid A ....................................................................... 30

Figure 5-16: Condition of Shear Wall in Grid D ....................................................................... 31

Figure 5-17: Condition of Shear Wall in Grid G ....................................................................... 32

Figure 5-18:: Condition of Shear Wall in Grid 4 ...................................................................... 33

Figure 5-19:: Condition of Shear Wall in Grid 7 ...................................................................... 34

Figure 5-20: Condition of Shear Wall in Grid 8 ........................................................................ 35

STHAPONA CONSULTANTS 3
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD., DETAILED ENGINEERING ASSESSMENT REPORT
KUNIA, BOARDBAZAR, GAZIPUR.]

Figure 5-21: Beam Layout Plan of 1st, 2nd, 3rd, 8th, 9th & 10th floor. ..................................... 36

Figure 5-22: Beam Conditions of 1st, 2nd, 3rd, 8th, 9th & 10th floor for 63 psf live load. .............. 37

Figure 5-23: Beam Conditions of 4th to 7th floor for 63 psf live load. (Red colour denotes
overstressed beams for excessive shear & torsion). .................................................................. 38

Figure 5-24: DCR ratio for punching of 2nd Floor Flat slab for 63 psf Live Load............................. 39

Figure 5-25: 2nd Floor Slab Bottom Reinforcement Requirement in Direction-1 for 63 psf Live Load
(unit-in2/ft) (SAFE 16.0.0) ................................................................................................................ 40

Figure 5-26: 2nd Floor Slab Top Reinforcement Requirement in Direction-1 for 63 psf Live Load
(unit-in2/ft) (SAFE 16.0.0) ................................................................................................................ 40

Figure 5-27: 2nd Floor Slab Bottom Reinforcement Requirement in Direction-2 for 63 psf Live Load
(unit-in2/ft) (SAFE 16.0.0) ................................................................................................................ 41

Figure 5-28: 2nd Floor Slab Top Reinforcement Requirement in Direction-2 for 63 psf Live Load
(unit-in2/ft) (SAFE 16.0.0) ................................................................................................................ 41

Figure 5-29: DCR ratio for punching of 8th Floor Flat slab for 63 psf Live Load ............................ 42

Figure 5-30: 8th Floor Slab Bottom Reinforcement Requirement in Direction-1 for63 psf Live Load
(unit-in2/ft) (SAFE 16.0.0) ................................................................................................................ 43

Figure 5-31: 8th Floor Slab Top Reinforcement Requirement in Direction-1 for 63 psf Live Load
(unit-in2/ft) (SAFE 16.0.0) ................................................................................................................ 43

Figure 5-32: 8th Floor Slab Bottom Reinforcement Requirement in Direction-2 for63 psf Live Load
(unit-in2/ft) (SAFE 16.0.0) ................................................................................................................ 44

Figure 5-33: 8th Floor Slab Top Reinforcement Requirement in Direction-1 for 63 psf Live Load
(unit-in2/ft) (SAFE 16.0.0) ................................................................................................................ 44

Figure 9-0-1: Footing Layout Plan ................................................................................................... 46

Figure 10-1: Condition of Column in Grid 1 .................................................................................. 50

Figure 10-2: Condition of Column in Grid 2 ................................................................................ 51

Figure 10-3: Condition of Column in Grid 3 ................................................................................ 52

Figure 10-4: Condition of Column in Grid 4 ................................................................................ 53

Figure 10-5: Condition of Column in Grid 5 ................................................................................ 54

Figure 10-6: Condition of Column in Grid 6 ................................................................................ 55

Figure 10-7: Condition of Column in Grid 7 ................................................................................ 56

Figure 10-8: Condition of Column in Grid 8 ................................................................................ 57

STHAPONA CONSULTANTS 4
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD., DETAILED ENGINEERING ASSESSMENT REPORT
KUNIA, BOARDBAZAR, GAZIPUR.]

Figure 10-9: Condition of Column in Grid 9 ................................................................................ 58

Figure 10-10: Condition of Column in Grid 10 ............................................................................ 59

Figure 10-11: Condition of Shear Wall in Grid A ..................................................................... 60

Figure 10-12: Condition of Shear Wall in Grid H ..................................................................... 61

Figure 10-13: Beam Conditions of 1st, 2nd, 3rd, 8th, 9th & 10th floor for 63 psf live load. (Red
colour denotes overstressed beams for excessive shear & torsion). ........................................ 62

Figure 10-14: Beam Conditions of 4th to 7th floor for 63 psf live load. (Red colour denotes
overstressed beams for excessive shear & torsion). ..................................................................... 63

STHAPONA CONSULTANTS 5
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD., DETAILED ENGINEERING ASSESSMENT REPORT
KUNIA, BOARDBAZAR, GAZIPUR.]

List of Tables
Table 2.1: Basic information RCC Building#1 ................................................................... 3

Table 5.1: Checking Adequacy of Foundation for Bearing Capacity (63 psf) ................. 17

Table 5.2: Checking Adequacy of Foundation for Punching Shear (63 psf) .................... 18

ANNEX-I: DT & NDT REPORT

ANNEX-II: SOIL TEST REPORT

STHAPONA CONSULTANTS 6
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

EXECUTIVE SUMMARY
Building-1 of Rupa Knitwear (Pvt) Ltd & Rupa Fabrics Ltd. is a ten storied RC flat slab
structure.

A team from ALLIANCE (BV) conducted visual assessment of the building#1 on 29th
May, 2014. They recommended to perform check for structural integrity of the factory
building. In this concern, Rupa Knitwear (Pvt) Ltd & Rupa Fabrics Ltd. engaged
Sthapona Consultants for performing Detail Engineering Assessment along with
checking architectural and structural drawing of the factory building.

The structural and architectural drawings were verified by Ferro-scanning, dimensions


measurement, plaster removing etc. There are few changes in as-built condition with
architectural & structural drawings which has been incorporated during DEA.

For Detail Engineering Assessment one of the key inputs is the concrete strength. We
collected sixteen cores (twelve from columns, four from slabs of different floors). We
found equivalent concrete strength for column is 2996 psi, for slab is 3726 psi. The
equivalent concrete strength has been calculated according to ACI 562.

We incorporated existing live load, concrete strength, rebar information etc. in the finite
element model of this building. Considering the concrete strength suggested by ACI 562,
all the columns and flat slab has been analyzed for 63 psf live load. All of the foundations
are adequate for bearing capacity & some of the foundation is overstressed for punching shear.
Live load reduction factor has been applied where applicable according to BNBC 2006.
Considering BNBC 2006 load combinations (i.e. gravity and lateral load) some columns
& shear walls are f o u n d t o b e overstressed and flat slab are overstressed, few
beams are overstressed due to shear and torsion. Shear walls require more reinforcement
than provided.

We recommend rectify the overstressed members.


We also recommend that each floor above ground floor must not exceed 30 psf live load
until rectification.

STHAPONA CONSULTANTS 1|Page


[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

1 INTRODUCTION
Sthapona Consultants was assigned to conduct Detail Engineering Assessment of the RCC
Building#1. The scope of work of the project has been shown below, which has been
summarized based on visual inspection report done by BV (ALLIANCE) team.
(i). Develop the required documents to confirm the structural integrity of the
building.
(ii). Confirm and document that provision have been made to accommodate
concentrated load at ground floor.
(iii). The Detail Engineering Assessment of the building, which includes the
following items:
 Highlight any variations between as-built and structure design drawings (if
applicable)
 Results of geotechnical assessment and testing/investigation
 Details of assumptions, loading, inputs and results of computer modelling
 Commentary on adequacy/inadequacy of elements of the structure and
further action plan

2 GENERAL OVERVIEW OF THE BUILDING

The Building#1 of Rupa Knitwear (Pvt) Ltd & Rupa Fabrics Ltd. is a 10‐storied reinforced
concrete structure located at KUNIA, BOARD BAZAR, GAZIPUR Dhaka-1230
(Latitude: 23°56'14.34"N; Longitude: 90°23'12.58"E). Total area of the building is
about 127,270 sft (Table 2.1).

Figure 2-1: Location of the Building (Source: Google Earth)

STHAPONA CONSULTANTS 2|Page


[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Table 2.1: Basic information RCC Building#1

Information Description

Structural System Reinforced concrete flat slab.

Floor Area 127,270 sft (Approx.)

Number of Stories 10-storied

Construction Year 2003-2004

Foundation Type Isolated Column Footing

3 DESTRUCTIVE & NON-DESTRUCTIVE TESTING

3.1 EVALUATION OF CONCRETE STRENGTH FROM CORE TEST

Sixteen cores from different locations of column & slab has been collected to examine the
concrete strength. These cores have been sent and tested in BUET lab by UTM (Universal
Testing Machine) to find its compressive strength. Equivalent concrete strength (As per ACI562)
for column is 2996 psi (using combined failure at eleven columns and excluding mortar failure
at one column) and for beam & slab is 3726 psi respectively. Detail of core test results have
presented in Annex-I.

Calculatio n of Equiva le nt Concrete Strength as per ACI-562 for Column

For Column:

Core Diameter Modified


Diameter
Sample test of Core Core test
Effect
result (inch) result

1 4310 3.19 1.0243 4414.733 f c (avg)= 3680.341 psi


2 4810 3.19 1.0243 4926.883
Standard Deviation of
3 2790 3.19 1.0243 2857.797 730.15 psi
Core strength=
4 3350 3.19 1.0243 3431.405
Coefficient of variation, V= 0.20
5 4530 3.19 1.0243 4640.079
Number of Sample, n=
6 3280 2.72 1.0384 3405.952 11
Coefficient of variation
7 3500 2.72 1.0384 3634.4 1.07
modification factor, kc=
8 2620 3.19 1.0243 2683.666
f c (eq)= 2996 psi
9 3190 3.19 1.0243 3267.517
10 3920 3.19 1.0243 4015.256
11 3130 3.19 1.0243 3206.059

STHAPONA CONSULTANTS 3|Page


[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Calculatio n of Equiva le nt Concrete Strength as per ACI-562 for Slab

For Slab:

Diame
Core Diamet Modified
ter of
Sample test er Core test
Core
result Effect result
(inch)
1 5570 2.72 1.0384 5783.888 f c (avg)= 4807.792 psi
2 4800 2.72 1.0384 4984.32
Standard Deviation of
3 4280 2.72 1.0384 4444.352 761.32 psi
Core strength=
4 3870 2.72 1.0384 4018.608
Coefficient of variation, V= 0.16

Number of Sample, n=
4
Coefficient of variation
1.28
modification factor, kc=
f c (eq)= 3726 psi

3.2 VERIFICATION OF REINFORCEMENT USING FERRO-SCANNER & REMOVING


CONCRETE COVER
We have performed Ferro-scanning in different locations of the columns & slab and removed
concrete cover of one column to verify the structural drawings. We have found that number and
size of rebar are slightly different as mentioned in structural design drawings for the surveyed
location. Detail results of Ferro scanning and concrete cover removing are shown in DT &
NDT report (Annex).

STHAPONA CONSULTANTS 4|Page


[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

4 ANALYSIS FOR STRUCTURAL ADEQUACY

4.1 STRUCTURAL SYSTEM


Generally, the structural system of Building#1 of Rupa Knitwear (Pvt) Ltd & Rupa
Fabrics Ltd. is a RC Flat Plate slab (Figure 4.1.1). Grade beam had been provided along
both directions of the building. Moreover, a steel shed was found on roof. The building
may be classified as ordinary moment resisting frame. General 3D view of the building
has been presented in Figure 4.1.2.

Figure 4-1: Flat plate Slab System of Typical Floors (Typical Floor)

STHAPONA CONSULTANTS 5|Page


[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 4-2: 3D View of Analytical Model

STHAPONA CONSULTANTS 10 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

4.2 CODES AND PRACTICES


For the present project relevant sections of Bangladesh National Building Code (BNBC,
2006) have been used for analysis. For the reinforced concrete design check, American
Concrete Institute (ACI 318-99) code has been consulted as and when became necessary
to complement the BNBC. American Concrete Institute (ACI 318-02) has also been used
for NTPA.

4.3 MATERIAL PROPERTY

The principal material of construction is reinforced concrete. As per investigation and


design drawings, the following material properties has been used:
 Yield strength of steel, fy = 60,000 lb/in2 (From credible design drawings, roof rod)
 Compressive Strength of concrete of Column, fc' = 2,996 lb/in2 (as per ACI-
562 using Core Test Results)
 Compressive Strength of concrete of Slab, fc' = 3,726 lb/in2(as per ACI-562 using
Core Test Results)
 Young's modulus of concrete, Ec = 57,000 √fc' (for Stone Chips)

4.3 LOADS
The loads that may act upon the structure are as follows:

4.4.1 Dead Loads


Dead loads (D) are those gravity load which remain acting on the structure permanently
without any change during the structures normal service life. These are basically the loads
coming from the weight of the different components of the structure. For the sake of
convenience in the analysis, sometimes this kind of loads are divided into two types,
namely a) self-weight of the structure (SW) and b) the weight coming from the non-
structural permanent components of the building (SDEAD). In concrete building the
weight of slabs, beams and columns etc. which form the main structural system is
considered the self-weight (SW). The weights of floor finish, water proofing layer,
partition walls and other non-structural permanent components generally constitute the rest
of the total dead load, i.e. (SDEAD). For the analysis and design checking of the building,
following are the values of dead loads,

 Unit weight of reinforced concrete = 150 pcf


 Unit weight of brickwork = 120 pcf
Floor Finish
Typical Floors 15 psf

STHAPONA CONSULTANTS 10 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

4.4.2 Live Load

Live load is the gravity load due to non-permanent objects like machines, furniture, and
human. Analysis has been carried out based on load recommended by BNBC (2006).
According to BNBC we have considered 63 psf live load for analysis. And for NTPA
compliance (When the structure seems not compliant with BNBC loading condition) we
have used reduced live load=42 psf.

4.4.3 Wind Load (W)


Bangladesh is typically a storm prone area where consideration to the thrust due to storm
must be given in the analysis and design of building and structures. Wind load due to storm
is typically modelled as lateral thrust force causing sway or overturning of the building.
Detailed specifications on wind loading on buildings are outlined in BNBC (2006). The
present project is located in Dhaka, for which the following basic parameters are used in
wind load calculation,

 Basic wind speed, Vb= 215 km/h (Gazipur)


 Exposure category = A
 Structure Importance coefficient CI =1.00

4.4.4 Earthquake Load (E)


Proper structural design of any building structure must include loads due to earthquake
shaking. Although there has been no major incident of earthquake hazard in the recent
past of Bangladesh, earthquakes are not uncommon in this area. Scientific geological study
of the earth crust below Bangladesh shows that Bangladesh does fall in moderate to high
seismic risk zone. Statistical evidence from past major and minor earthquake incidents
shows that a major earthquake is overdue in the recent times of geological scale. Therefore,
it is necessary to prepare against any possible earthquake hazard. It should be kept in mind
that the objective of earthquake resistance building design is not to make a strong building
which can resist any damage due to earthquake. Instead, earthquake resistant design
basically aims at minimizing the possible damage and casualty to an acceptable level.

Regarding the earthquake resistant structural design, it essential that the specific design
code is followed. For the analysis and design checking of this building, Equivalent Static
Force Method of BNBC (2006) is followed. The main considerations for calculation of
earthquake load are given below.

 Zone co-efficient, Z = 0.15 (zone 2, As Per BNBC 2006)


 Structure importance co-efficient, I = 1.00 (Standard Occupancy, Table 6.2.23,
BNBC 2006)
 Response modification co-efficient, R = 5.0 (OMRF, Table 6.2.24, BNBC)
 Site co-efficient, S 3= 1.5 (type 3 soil as suggested in Table 6.2.25, BNBC)

STHAPONA CONSULTANTS 10 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

4.5 METHOD OF ANALYSIS


Depending on the type of project, there are several well-established methods among which
Finite Element Method (FEM) is perhaps the most sophisticated and all-encompassing
one. For analysis and design checking of the building, powerful finite element based
structural design software package ETABS- V16.2.0 has been employed for analysis. Some
aspects of the analysis process are discussed in the following paragraphs.
A full three-dimensional modelling of the structure has been developed using frame and
plate/shell elements. At base level, the columns are assumed to be held hinged due to
spread foundation.

4.6 LOADING AND LOAD COMBINATION


The basic sources of loads are described in earlier section. These loads are applied on the
model in seven basic categories. These are as follows:
 Load Case 1: Self-weight of structure (SW).
 Load Case 2: Floor finish and partition wall (SDEAD).
 Load Case 3: Live load on roof (LL)
 Load Case 4: Earthquake load on East-West Direction. (Ex)
 Load Case 5: Earthquake load on North-South Direction. (Ey)
 Load Case 6: Wind load on East-West Direction. (Wx)
 Load Case 7: Wind load on North-South Direction. (Wy)

These seven basic load cases are analysed by ETABS-V9.7.4. The results are then
combined in accordance with BNBC. These are as follows:

1.4 D
1.4 D + 1.7 L
0.9 D + 1.3 (W or 1.1 E)
0.75 (1.4 D + 1.7 L + 1.7 (W or 1.1 E))

Where D stands for total dead load i.e. D = DL + SDEAD, L stands for live load i.e. L=LL,
W stands for wind load and E stands for earthquake load. When these seven basic load
cases are combined accordingly considering the direction of lateral loads, we obtain, after
simplification, the following twenty-two combination cases:

 Combination Case 1: 1.4 D


 Combination Case 2: 1.4 D + 1.7 L
 Combination Case 3: 1.05 D + 1.275 L + 1.275 Wx
 Combination Case 4: 1.05 D + 1.275 L - 1.275 Wx
 Combination Case 5: 1.05 D + 1.275 L + 1.275 Wy

STHAPONA CONSULTANTS 10 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

 Combination Case 6: 1.05 D + 1.275 L - 1.275 Wy


 Combination Case 7: 1.05 D + 1.275 Wx
 Combination Case 8: 1.05 D - 1.275 Wx
 Combination Case 9: 1.05 D + 1.275 Wy
 Combination Case 10: 1.05 D - 1.275 Wy
 Combination Case 11: 0.9 D + 1.3 Wx
 Combination Case 12: 0.9 D - 1.3 Wx
 Combination Case 13: 0.9 D + 1.3 Wy
 Combination Case 14: 0.9 D - 1.3 Wy
 Combination Case 15: 1.05 D + 1.275 L + 1.4025 Ex
 Combination Case 16: 1.05 D + 1.275 L - 1.4025 Ex
 Combination Case 17: 1.05 D + 1.275 L + 1.4025 Ey
 Combination Case 18: 1.05 D + 1.275 L - 1.4025 Ey
 Combination Case 19: 1.05 D + 1.4025 Ex
 Combination Case 20: 1.05 D - 1.4025 Ex
 Combination Case 21: 1.05 D + 1.4025 Ey
 Combination Case 22: 1.05 D - 1.4025 Ey
 Combination Case 23: 0.9 D + 1.43 Ex
 Combination Case 24: 0.9 D - 1.43 Ex
 Combination Case 25: 0.9 D + 1.43 Ey
 Combination Case 26: 0.9 D - 1.43 Ey
 Combination Case 27: 1.4 D + 1.4 L + 1.4 Ex
 Combination Case 28: 1.4 D + 1.4 L - 1.4 Ex
 Combination Case 29: 1.4 D + 1.4 L + 1.4 Ey
 Combination Case 30: 1.4 D + 1.4 L - 1.4 Ey

But in ETABS analysis, we do not calculate last four combination cases (Combination
case 27, 28, 29 & 30).

STHAPONA CONSULTANTS 10 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

4.7 BOUNDARY CONDITIONS


In any finite element analysis, applying appropriate boundary conditions are important.
Without appropriate boundary conditions the model of building structure may not be
stable. On the other hand, application of excessive restraints may render the structure too
stiff resulting in development of unreasonable stresses. For a structure like this building,
it is reasonable to assume that the bases of columns are not fully restrained in all directions.

4.8 APPLICATION OF LOAD AND ANALYSIS


A static analysis is performed using the loadings and combinations of loads (mentioned
earlier) for the Building#1. Some pictorial representation of the analysis results are shown
in figures below.

Figure 4-3: Applied Floor Finish in typical Floor (psf)

STHAPONA CONSULTANTS 11 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 4-4: Applied Live Load in Typical Floor (63 psf) for BNBC

STHAPONA CONSULTANTS 12 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 4-5: Deflected Shape of the Building

STHAPONA CONSULTANTS 13 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

5 EVALUATION OF STRUCTURAL MEMBERS

5.1 CHECKING ADEQUACY OF FOUNDATION WITH 63PSF LIVE


LOAD
Provided structural drawings of the project shows that isolated column foundation had
been used for this project (Figure 5.1). We have checked adequacy of footing size &
thickness for 63 Psf live load. Average bearing capacity of soil has been found 8.88 Ksf
with factor of safety 2 from the soil report prepared by “STRAIN FIELD
GEOTECHNIQUE LIMITED” in JULY-2016.

Figure 5-1: Foundation Layout Plan

STHAPONA CONSULTANTS 14 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-2: Node ID of ETABS Model


Figure 5.2 (snapshot of model developed by ETABS) shows model nodes where
foundation was provided. Ultimate capacity of foundations and corresponding factor of
safety has been shown in Table 5.1 to Table 5.2 for different type of foundations. From
the tables conditions of foundations are found.

STHAPONA CONSULTANTS 15 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Table 5.1: Checking Adequacy of Foundation for Bearing Capacity (63 psf)

STHAPONA CONSULTANTS 16 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Table 5.2: Checking Adequacy of Foundation for Punching Shear (63 psf)

f'C= 2996 psi


Live Load BNBC psf
Factored Reaction Column Column Punching
Foundation
Joint Foundation Column (At Column Length, Width, Shear DCR for
Thickness Remark
Label Type Type Center) L B Capacity Punching
(1.4*DL+1.7*LL) in in in kip
877 FC1 C10 447 40 13 23 1515 0.29 OK
878 FC1 C10 628 40 13 23 1515 0.41 OK
875 FC1
C8 899 40 13 43 1790 0.50 OK
29 FC1
876 FC1
C8 961 40 13 43 1790 0.54 OK
893 FC1
863 FC1 C3 1551 40 30 30 1845 0.84 OK
872 FC2
C6 807 30 13 43 1105 0.73 OK
907 FC2
860 FC2 C3 1326 30 30 30 1146 1.16 NOT OK
892 FC2 C10 238 30 13 23 904 0.26 OK
873 F6 C7 1141 30 23 23 1005 1.14 NOT OK
874 F6 C7 882 30 23 23 1005 0.88 OK
858 F2 C2 1905 42 30 30 2003 0.95 OK
859 F2 C2 1670 42 30 30 2003 0.83 OK
871 F5 C5 815 30 23 23 1005 0.81 OK
862 F3 C3 1396 37 30 30 1620 0.86 OK
851 F1 C10 1604 38 13 23 1381 1.16 NOT OK
854 F1 C10 1592 38 13 23 1381 1.15 NOT OK
857 F1 C10 1594 38 13 23 1381 1.15 NOT OK
866 F5 C5 989 30 23 23 1005 0.98 OK
870 F5 C5 804 30 23 23 1005 0.80 OK
861 F3 C3 1391 37 30 30 1620 0.86 OK
850 F1 C10 1580 38 13 23 1381 1.14 NOT OK
853 F1 C10 1578 38 13 23 1381 1.14 NOT OK
856 F1 C10 1607 38 13 23 1381 1.16 NOT OK
865 F5 C5 1011 30 23 23 1005 1.01 NOT OK
849 F1 C1 1562 38 30 30 1694 0.92 OK
852 F1 C1 1597 38 30 30 1694 0.94 OK
855 F1 C1 1679 38 30 30 1694 0.99 OK
904 F4
C4 1295 27 13 61 1090 1.19 NOT OK
864 F4
869 F5 C5 838 30 23 23 1005 0.83 OK
868 F5 C5 896 30 23 23 1005 0.89 OK
867 F5A C5 1012 27 23 23 840 1.21 NOT OK
2366 F7
C9 587 27 13 33 840 0.70 OK
879 F7

STHAPONA CONSULTANTS 17 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

5.2 CHECKING ADEQUACY OF COLUMN WITH 63 PSF LIVE


LOADING
Typical column layout plan is shown in Error! Reference source not found.3 with grid
results has been shown based on model grid. Assessment of columns (P-M-M Interaction
Ratio) according to BNBC 2006 with 63 psf live load has been presented in Figure 5.3 to
onwards. According to standard practice, column with P-M-M value greater than 1.0
consider as Over-stressed. However, it is found that all the peripheral & some other
columns are Over-stressed.

Figure 5-3: Column Layout Plan from Model Snapshot

STHAPONA CONSULTANTS 18 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-4: Overstressed Column (Red Colour) Layout Plan

STHAPONA CONSULTANTS 19 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-5: Condition of Column in Grid 1


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 20 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-6: Condition of Column in Grid 2


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 21 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-7: Condition of Column in Grid 3


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 22 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-8: Condition of Column in Grid 4


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 23 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-9: Condition of Column in Grid 5


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 24 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-10: Condition of Column in Grid 6


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 25 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-11: Condition of Column in Grid 7


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 26 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-12:: Condition of Column in Grid 8


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 27 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-13: Condition of Column in Grid 9


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 28 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-14:: Condition of Column in Grid 10


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 29 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-15: Condition of Shear Wall in Grid A


(Sections requiring more than 1% reinf. (4.45% to 2.91%) are Over-
stressed)

STHAPONA CONSULTANTS 30 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-16: Condition of Shear Wall in Grid D


(Sections requiring more than 1% reinf. are Over-stressed

STHAPONA CONSULTANTS 31 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-17: Condition of Shear Wall in Grid G


(Sections requiring more than 1% reinf. are Over-stressed)

STHAPONA CONSULTANTS 32 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-18:: Condition of Shear Wall in Grid 4


(Sections requiring more than 1% reinf. are Over-stressed)

STHAPONA CONSULTANTS 33 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-19:: Condition of Shear Wall in Grid 7


(Sections requiring more than 1% reinf. are Over-stressed)

STHAPONA CONSULTANTS 34 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-20: Condition of Shear Wall in Grid 8


(Sections requiring more than 1% reinf. are Over-stressed)

5.3 CHECKING ADEQUACY OF BEAMS WITH 63 PSF LIVE LOADING


The building has some peripheral beams. Assessment of Beams have been conducted
according to BNBC 2006 with 63 psf live load has been presented in Figure 5.21 to
onwards.

STHAPONA CONSULTANTS 35 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-21: Beam Layout Plan of 1st, 2nd, 3rd, 8th, 9th & 10th floor.

STHAPONA CONSULTANTS 36 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-22: Beam Conditions of 1st, 2nd, 3rd, 8th, 9th & 10th floor for 63 psf live load.
(Red colour denotes overstressed beams for excessive shear & torsion).

Beam Id. Provided Reif. Provided Reif.


Required Required
In At Top- Edge At Middle-
Reinf. (in2) Reinf. (in2)
Drawing (in2) Bottom(in2)

B-1 3.804 As Shown 3.804 As Shown


B-2 2.435 As Shown 2.435 As Shown
B-3 2.435 As Shown 2.435 As Shown
B-4 2.922 As Shown 2.435 As Shown
B-5 1.461 As Shown 2.435 As Shown
B-6 1.402 As Shown 1.402 As Shown

STHAPONA CONSULTANTS 37 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-23: Beam Conditions of 4th to 7th floor for 63 psf live load. (Red colour denotes overstressed
beams for excessive shear & torsion).

Beam Id. Provided Provided Reif.


Required Required
In Reif. At Top- At Middle-
Reinf.(in2) Reinf.(in2)
Drawing Edge (in2) Bottom(in2)
B-1 3.804 As Shown 3.804 As Shown
B-2 2.435 As Shown 2.435 As Shown
B-3 2.435 As Shown 2.435 As Shown
B-4 2.922 As Shown 2.435 As Shown
B-7 2.922 As Shown 1.461 As Shown
B-8 2.922 As Shown 1.948 As Shown
CB 4.870 As Shown 1.247 As Shown

STHAPONA CONSULTANTS 40 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

5.4 CHECKING ADEQUACY OF SLAB WITH 63 PSF LIVE LOAD


We found flat slab system in the building. Slab thickness is 8 inch. We have assessed the
slab in BNBC recommended minimum live load 63 psf.

Figure 5-24: DCR ratio for punching of 2nd Floor Flat slab for 63 psf Live Load
(DCR more than 1.0 denotes inadequacy)

STHAPONA CONSULTANTS 39 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-25: 2nd Floor Slab Bottom Reinforcement Requirement in Direction-1 for 63 psf Live
Load (unit-in2/ft) (SAFE 16.0.0)

Figure 5-26: 2nd Floor Slab Top Reinforcement Requirement in Direction-1 for 63 psf Live Load
(unit-in2/ft) (SAFE 16.0.0)

STHAPONA CONSULTANTS 40 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-27: 2nd Floor Slab Bottom Reinforcement Requirement in Direction-2 for 63 psf Live
Load (unit-in2/ft) (SAFE 16.0.0)

Figure 5-28: 2nd Floor Slab Top Reinforcement Requirement in Direction-2 for 63 psf Live Load
(unit-in2/ft) (SAFE 16.0.0)

STHAPONA CONSULTANTS 41 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-29: DCR ratio for punching of 8th Floor Flat slab for 63 psf Live Load
(DCR more Than 1.0 denotes inadequacy)

STHAPONA CONSULTANTS 42 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-30: 8th Floor Slab Bottom Reinforcement Requirement in Direction-1 for63 psf Live
Load (unit-in2/ft) (SAFE 16.0.0)

Figure 5-31: 8th Floor Slab Top Reinforcement Requirement in Direction-1 for 63 psf Live Load
(unit-in2/ft) (SAFE 16.0.0)

STHAPONA CONSULTANTS 43 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 5-32: 8th Floor Slab Bottom Reinforcement Requirement in Direction-2 for63 psf Live
Load (unit-in2/ft) (SAFE 16.0.0)

Figure 5-33: 8th Floor Slab Top Reinforcement Requirement in Direction-1 for 63 psf Live Load
(unit-in2/ft) (SAFE 16.0.0)

STHAPONA CONSULTANTS 44 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

6 CONCLUSION

According to BNBC loading condition (63psf Live Load)-

 All of the footings are adequate in size (in respect of soil bearing capacity)
 Some of the footings are overstressed due to punching shear.
 Shear walls, few columns are over-stressed for BNBC load combination.
 Few beams are overstressed due to shear and torsion.
 The flat slab is overstressed considering 63 psf live load.

7 RECOMMENDATION

We strongly recommend to rectify over-stressed members immediately. We also recommend that


each floor above ground floor must not exceed 30 psf live load until rectification.

STHAPONA CONSULTANTS 45 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

8 EVALUATION OF STRUCTURAL MEMBERS AFTER RETROFITTING


8.1 CHECKING ADEQUACY OF FOUNDATION AFTER
RETROFITTING

Figure 9-0-1: Footing Layout Plan

STHAPONA CONSULTANTS 46 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 8.1.2: Node ID from ETABS Model

STHAPONA CONSULTANTS 47 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Table 8.1.1: Foundation size check after retrofitting

Provided
Bearing FoS (From Ultimate Load Reaction Available FoS Remarks
Joint Foundation Foundation
Capacity Soil Test Bearing Capacity (DL + LL) (For Existing (Minimum
Label Type Size
Report) Foundation) FoS=2.0)
sft ksf kip kip
873 F6 132.3 8.88 2 2348.76 642.89 3.65 OK
874 F6 132.3 8.88 2 2348.76 599.62 3.92 OK
858 F2 306.3 8.88 2 5439.00 1332.03 4.08 OK
859 F2 306.3 8.88 2 5439.00 1165.93 4.66 OK
871 F5 182.3 8.88 2 3236.76 524.95 6.17 OK
862 F3 280.6 8.88 2 4982.79 974.91 5.11 OK
851 F1 324.0 8.88 2 5754.24 1122.26 5.13 OK
854 F1 324.0 8.88 2 5754.24 1110.05 5.18 OK
857 F1 324.0 8.88 2 5754.24 1109.41 5.19 OK
866 F5 182.3 8.88 2 3236.76 676.36 4.79 OK
870 F5 182.3 8.88 2 3236.76 526.27 6.15 OK
861 F3 280.6 8.88 2 4982.79 970.37 5.13 OK
850 F1 324.0 8.88 2 5754.24 1103.19 5.22 OK
853 F1 324.0 8.88 2 5754.24 1102.25 5.22 OK
856 F1 324.0 8.88 2 5754.24 1127.46 5.10 OK
865 F5 182.3 8.88 2 3236.76 632.96 5.11 OK
849 F1 324.0 8.88 2 5754.24 1090.33 5.28 OK
852 F1 324.0 8.88 2 5754.24 1120.99 5.13 OK
855 F1 324.0 8.88 2 5754.24 1115.41 5.16 OK
869 F5 182.3 8.88 2 3236.76 573.91 5.64 OK
868 F5 182.3 8.88 2 3236.76 606.40 5.34 OK
877
878
875 FC1 718.5 8.88 2 12759.91 3658.04 3.49 OK
893
863
884
891
889
885 FC3 875.4 8.88 2 15546.45 5600.40 2.78 OK
886
887
888
907
860
881
882
921 FC2 815.6 8.88 2 14484.43 3270.23 4.43 OK
920
892
880
883
904
864
867
927
RF1 948.0 8.88 2 16836.48 2755.35 6.11 OK
16
928
2366
879

STHAPONA CONSULTANTS 48 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Table 8.1.2: Punching shear check for retrofitting

f'C= 2996 psi


Live Load BNBC psf
Factored Reaction Column Column Punching
Foundation
Joint Foundation Column (At Column Length, Width, Shear DCR for
Thickness Remark
Label Type Type Center) L B Capacity Punching
(1.4*DL+1.7*LL) in in in kip
873 F6 C7 921 30 23 23 1005 0.92 OK
874 F6 C7 862 30 23 23 1005 0.86 OK
858 F2 C2 1931 42 30 30 2003 0.96 OK
859 F2 C2 1701 42 30 30 2003 0.85 OK
871 F5 C5 765 30 23 23 1005 0.76 OK
862 F3 C3 1432 37 30 30 1620 0.88 OK
851 F1 C1 1649 38 30 30 1694 0.97 OK
854 F1 C1 1631 38 30 30 1694 0.96 OK
857 F1 C1 1629 38 30 30 1694 0.96 OK
866 F5 C5 987 30 23 23 1005 0.98 OK
870 F5 C5 767 30 23 23 1005 0.76 OK
861 F3 C3 1426 37 30 30 1620 0.88 OK
850 F1 C1 1622 38 30 30 1694 0.96 OK
853 F1 C1 1620 38 30 30 1694 0.96 OK
856 F1 C1 1656 38 30 30 1694 0.98 OK
865 F5 C5 924 30 23 23 1005 0.92 OK
849 F1 C1 1600 38 30 30 1694 0.95 OK
852 F1 C1 1644 38 30 30 1694 0.97 OK
855 F1 C1 1637 38 30 30 1694 0.97 OK
869 F5 C5 838 30 23 23 1005 0.83 OK
868 F5 C5 885 30 23 23 1005 0.88 OK
893 FC1 RC6 1807 40 18 48 1928 0.94 OK
863 FC1 C3 1426 40 30 30 1845 0.77 OK
907 FC2 RC6 523 30 18 48 1206 0.43 OK
860 FC2 C3 352 30 30 30 1146 0.31 OK

STHAPONA CONSULTANTS 49 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

9 CHECKING ADEQUACY OF COLUMN AFTER RETROFITTING

Figure 10-1: Condition of Column in Grid 1


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 50 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 10-2: Condition of Column in Grid 2


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 51 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 10-3: Condition of Column in Grid 3


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 52 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 10-4: Condition of Column in Grid 4


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 53 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 10-5: Condition of Column in Grid 5


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 54 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 10-6: Condition of Column in Grid 6


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 55 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 10-7: Condition of Column in Grid 7


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 56 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 10-8: Condition of Column in Grid 8


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 57 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 10-9: Condition of Column in Grid 9


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 58 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 10-10: Condition of Column in Grid 10


(Sections having P-M-M ratio more than 1 are Over-stressed)

STHAPONA CONSULTANTS 59 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 10-11: Condition of Shear Wall in Grid A


(Sections requiring more than 1% reinf. (4.45% to 2.91%) are Over-stressed

STHAPONA CONSULTANTS 60 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 10-12: Condition of Shear Wall in Grid H


(Sections requiring more than 1% reinf. are Over-stressed

STHAPONA CONSULTANTS 61 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

9.1 CHECKING ADEQUACY OF BEAMS AFTER RETROFITTING

Figure 10-13: Beam Conditions of 1st, 2nd, 3rd, 8th, 9th & 10th floor for 63 psf live load.
(Red colour denotes overstressed beams for excessive shear & torsion).
Beam Id. Provided Reif. Provided Reif.
Required Required
In At Top- Edge At Middle-
Reinf. (in2) Reinf. (in2)
Drawing (in2) Bottom(in2)

B-1 3.804 As Shown 3.804 As Shown


B-2 2.435 As Shown 2.435 As Shown
B-3 2.435 As Shown 2.435 As Shown
B-4 2.922 As Shown 2.435 As Shown
B-5 1.461 As Shown 2.435 As Shown
B-6 1.402 As Shown 1.402 As Shown

STHAPONA CONSULTANTS 62 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

Figure 10-14: Beam Conditions of 4th to 7th floor for 63 psf live load. (Red colour
denotes overstressed beams for excessive shear & torsion).

Beam Id. Provided Provided Reif.


Required Required
In Reif. At Top- At Middle-
Reinf.(in2) Reinf.(in2)
Drawing Edge (in2) Bottom(in2)
B-1 3.804 As Shown 3.804 As Shown
B-2 2.435 As Shown 2.435 As Shown
B-3 2.435 As Shown 2.435 As Shown
B-4 2.922 As Shown 2.435 As Shown
B-7 2.922 As Shown 1.461 As Shown
B-8 2.922 As Shown 1.948 As Shown
CB 4.870 As Shown 1.247 As Shown

STHAPONA CONSULTANTS 40 | P a g e
[BUILDING#1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARDBAZAR, GAZIPUR.]
DETAILED ENGINEERING ASSESSMENT REPORT

10 DISCLAIMER

The assessment engineer made the above observations & recommendations from Core
test, NDT results & mathematical modelling of the building. We applied our best
engineering judgments. We do not bear responsibility for any deviation from the predicted
behavior of the structure caused by uncertainties of performance or calamities.

STHAPONA CONSULTANTS 64 | P a g e
ANNEX -I

NON DESTRUCTIVE & DESTRUCTIVE TEST RESULTS


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Executive Summary of the Test Results (NDT & DT)


 We have inspected the building (Bldg#1) visually at 6th April, 2015 for first time. The
building is ten storied with semi-basement RCC structure of flat plate slab. We have
performed NDT & DT tests in columns, and slab in several times in April.

 We have performed detailed rebar scanning using Ferro-Scan at Eight (8) locations to find
the reinforcement used in structural members. Among the Eight, five scans were done for
ground floor column, one scan was done for ground floor slab, and one scan was done for
third floor column and one scan for third floor slab. Also a lot of quick scan were performed
to verify the reinforcement in columns and slab.

 We have checked rebar no. and diameter of columns and spacing of slab by removing
concrete cover.

 We have performed concrete strength test by cutting Core (Destructive) at sixteen (16)
locations in column and slab. All the cores have been taken from different floor. After
cutting the Core, we have tested it by Universal Testing Machine at BUET lab. We found
that stone chips were used for concreting of column and slab. We found the concrete
strength is on a range from 2460 psi to 4810 psi for column and 3870 psi and 5570 psi for
slab and calculated average concrete strength is of column is 3491 psi and of slab is 4630
psi. However, considering the Guide line of ACI 562, the Equivalent Concrete strength is
2996 psi for column and 3726 psi for slab.

 We have checked the footing size and thickness by foundation exploration.

STHAPONA CONSULTANTS Page | 74


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

1. REBAR SCAN USING FERRO-SCANNER

STHAPONA CONSULTANTS Page | 75


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

1.1 Ferro-Scan Locations:

Figure 1.1: Locations of detailed Ferro scan

STHAPONA CONSULTANTS Page | 76


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

1.2 Some photographs of Scanning in Columns, & Slab:

Figure 1.2: Scanning in Column for finding main rebar.

Figure 1.3: Scanning in Column for finding Tie bar.

STHAPONA CONSULTANTS Page | 77


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Figure 1.5: Scanning in slab for checking the reinforcement.

STHAPONA CONSULTANTS Page | 78


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

1.3 Findings by detailed Ferro scanning in column, and slab:

Sl. Sample Member Reinforcement


Location Remarks
No Id Type Details
Along 27"
Ground Floor Column face:
01 D-1,2
4-F (27" X 27")
Main Reinforcement: 06-
Ø25mm Tie Bar: Ø10 mm @ 6"
c/c
Scanning Images from Ferro-Scanner

STHAPONA CONSULTANTS Page | 79


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Sl. Sample Member Reinforcement


Location Remarks
No Id Type Details
Along 27"
Ground Floor Column face:
02 D-3,4
4-F (27" X 27")
Main Reinforcement: 06-
Ø25mm Tie Bar: Ø10 mm @ 6"
c/c
Scanning Images from Ferro-Scanner

STHAPONA CONSULTANTS Page | 80


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Sl. Sample Member Reinforcement


Location Remarks
No Id Type Details
Along 27"
Ground Floor Column face:
03 D-5,6
5-E (27" X 27") Main Reinforcement: 06-
Ø25mm Tie Bar: Ø10 mm @ 6"
c/c
Scanning Images from Ferro-Scanner

STHAPONA CONSULTANTS Page | 81


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Sl. Sample Member Reinforcement


Location Remarks
No Id Type Details
Along 27"
Ground Floor Column face:
04 D-7,8
5-E (27" X 27") Main Reinforcement: 06-
Ø25mm Tie Bar: Ø10 mm @ 6"
c/c
Scanning Images from Ferro-Scanner

STHAPONA CONSULTANTS Page | 82


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Sl. Sample Member Reinforcement


Location Remarks
No Id Type Details
Along 27"
Ground Floor Column face:
05 D-9,10
5-G (27" X 27")
Main Reinforcement: 08-
Ø25mm Tie Bar: Ø10 mm @ 6"
c/c
Scanning Images from Ferro-Scanner

STHAPONA CONSULTANTS Page | 83


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Sl. Sample Member Reinforcement


Location Remarks
No Id Type Details
Along 27"
Ground Floor Column face:
06 D-11,12
6-G (27" X 27")
Main Reinforcement: 07-
Ø25mm Tie Bar: Ø10 mm @ 6"
c/c
Scanning Images from Ferro-Scanner

STHAPONA CONSULTANTS Page | 84


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Sl. Sample Member Reinforcement


Location Remarks
No Id Type Details
Along 27"
Ground Floor Column face:
07 D-13,14
7-E (27" X 27")
Main Reinforcement: 06-
Ø25mm Tie Bar: Ø10 mm @ 6"
c/c
Scanning Images from Ferro-Scanner

STHAPONA CONSULTANTS Page | 85


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Sl. Sample Member Reinforcement


Location Remarks
No Id Type Details
Along 27"
Ground Floor Column face:
08 D-15,16
7-E (27" X 27")
Main Reinforcement: 06-
Ø25mm Tie Bar: Ø10 mm @ 6"
c/c
Scanning Images from Ferro-Scanner

STHAPONA CONSULTANTS Page | 86


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Sl. Sample Member


Location Reinforcement Details Remarks
No Id Type
Along X Direction:
Ground Floor Ø10
09 D-17 Slab
5,6-F,G mmY@Direction:
Along 6 " c/c
Ø10
mm @ 5 " c/c

Scanning Images from Ferro-Scanner

STHAPONA CONSULTANTS Page | 87


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Sl. Sample Member Reinforcement


Location Remarks
No Id Type Details
Along 27" face:
3rd Floor Column
10 D-18,19 Main Reinforcement: 06-Ø25mm
4-F (27" X 27")
Tie Bar: Ø10 mm @ 6" c/c

Scanning Images from Ferro-Scanner

STHAPONA CONSULTANTS Page | 88


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Sl. Sample Member Reinforcement


Location Remarks
No Id Type Details
Along 27" face:
3rd Floor Column
11 D-20,21 Main Reinforcement: 05-Ø25mm
4-F (27" X 27")
Tie Bar: Ø10 mm @ 6" c/c

Scanning Images from Ferro-Scanner

STHAPONA CONSULTANTS Page | 89


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Sl. Sample Member


Location Reinforcement Details Remarks
No Id Type
Along X Direction:
Ground Floor Ø10
12 D-22 Slab
4,5-F,E mmY@Direction:
Along 6 " c/c
Ø10
mm @ 5 " c/c

Scanning Images from Ferro-Scanner

STHAPONA CONSULTANTS Page | 90


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

2. REBAR CHECK BY REMOVING CONCRETE


COVER

STHAPONA CONSULTANTS Page | 91


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

2.1 LOCATIONS OF REBAR CHECK:

Figure 2.1: Locations of Rebar Check

STHAPONA CONSULTANTS Page | 92


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

2.2 FIELD PHOTOS OF REBAR CHECK:

Figure 2.2: Removal of Concrete Cover of Column.

Figure 2.3: Checking Rebar Diameter of Column.

STHAPONA CONSULTANTS Page | 93


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Figure 2.4: Checking Concrete Cover of Column.

Figure 2.4: Checking Spacing of Rebar at Slab.

STHAPONA CONSULTANTS Page | 94


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Figure 2.4: Checking Diameter of Rebar at Slab.

STHAPONA CONSULTANTS Page | 95


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

3. CONCRETE CORE PULLOUT

STHAPONA CONSULTANTS Page | 96


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

3.1 LOCATIONS OF CORE CUTTING:

Figure 3.1: Locations of Core Cutting

STHAPONA CONSULTANTS Page | 97


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

3.2 FIELD PHOTOS OF CORE CUTTING:

Figure 3.2: Core-1 cutting location Figure 3.3: Core-2 cutting location

Figure 3.4: Core-3 cutting location Figure 3.5: Core-4 cutting location

Figure 3.6: Core-5 cutting location Figure 3.7: Core-6 cutting location

STHAPONA CONSULTANTS Page | 98


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Figure 3.8: Core-7 cutting location Figure 3.9: Core-8 cutting location

Figure 3.10: Core-9 cutting location Figure 3.11: Core-10 cutting location

Figure 3.12: Core-11 cutting location Figure 3.13: Core-12 cutting location

STHAPONA CONSULTANTS Page | 99


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Figure 3.14: Core-13 cutting location Figure 3.15: Core-14 cutting location

Figure 3.16: Core-15 cutting location Figure 3.17: Core-16 cutting location

STHAPONA CONSULTANTS Page | 100


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Figure 3.18: Core-1 taken from 5F Column Figure 3.19: Core-2 taken from 2F Column

Figure 3.20: Core-3 taken from 4F Column Figure 3.21: Core-4 taken from 4F Column

Figure 3.22: Core-5 taken from 5F Column Figure 3.23: Core-6 taken from 6F Column

STHAPONA CONSULTANTS Page | 101


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Figure 3.24: Core-7 taken from 6F Column Figure 3.25: Core-8 taken from 6F Column

Figure 3.26: Core-9 taken from 6F Column Figure 3.27: Core-10 taken from 6F Column

Figure 3.28: Core-11 taken from 6F Column Figure 3.29: Core-12 taken from 6F Column

STHAPONA CONSULTANTS Page | 102


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Figure 3.30: Core-13 taken from 6F Slab Figure 3.31: Core-14 taken from 5F Slab

Figure 3.32: Core-15 taken from 4F Slab Figure 3.33: Core-16 taken from 3F Slab

STHAPONA CONSULTANTS Page | 103


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

BUET CONCRETE TEST REPORT

STHAPONA CONSULTANTS Page | 104


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

STHAPONA CONSULTANTS Page | 105


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

STHAPONA CONSULTANTS Page | 106


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

4. REBAR Test Report

STHAPONA CONSULTANTS Page | 107


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

STHAPONA CONSULTANTS Page | 108


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

5. FOUNDATION EXPLORATION

STHAPONA CONSULTANTS Page | 109


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

4.1 Location of foundation exploration

STHAPONA CONSULTANTS Page | 110


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

4.2 Field Photo of Foundation Exploration

Figure 4.1 Foundation Excavation

Figure 4.2 Foundation Thickness check

STHAPONA CONSULTANTS Page | 111


[BUILDING-1, RUPA KNITWEAR (PVT) LTD & RUPA FABRICS LTD.,
KUNIA, BOARD BAZAR, GAZIPUR.]

Figure 4.3 Foundation size measurement

STHAPONA CONSULTANTS Page | 110


ANNEX -II
SOIL TEST REPORT