CWBP - Summary - HAIDERGARH (NP)
CWBP - Summary - HAIDERGARH (NP)
Basic Details
ULB Information
District State Existing AMRUT City
City
BARABANKI UTTAR PRADESH No
HAIDERGARH (NP)
Parastatal Agency
Any parastatal agency engaged? : Yes No. Of Parastatal Agency : 1
# Organization Nodal officer Designation Landline no. Mobile no. E-mail ID
name name
UTTAR PRADESH Project Manager
1 Sunil Kumar Singh 9532501783 pmnkeupjnfzd1@gmail.com
JAL NIGAM URBAN Nagar Karya Ikai
City
Households City area (sq.
population(Census 17200 4247 4.00
(Census 2011) km.)
2011)
Slum
Industries
Wards in city 12 settlements 00 0
(No.)
(No.)
Population
survey
Industrial clusters 0 conducted in No Survey year NA
the last five
years ?
Slum Slum
Population density 5160 population in 0 households 0
2021 2021
Future Projection
City population in Households in Slum households
22291 5504 0
2025 2025 in 2025
Engineering College/ Organization/ Experts Working in Water Sector in the ULB
# Type Entity name Nodal officer Landline no. Mobile no. E-mail ID
name
No data available in table
Uploaded Images
Water Connections
# Water connections type No. of tap connections No. of households Water supplied in MLD
provided
Commercial
2 0 NA 0
Establishments
3 Industries 0 NA 0
Institutional
4 0 NA 0
Establishments
5 Slums 0 0 0
Institutional
establishments
0.1 Slums 0 Total 3.7600000000000002
Are you going to met the 100% future demand How much future demand in MLD will be met
through subsurface water source? through subsurface water source?
NA
WB Rejuvenation & RWH
Sewerage Coverage
Household connected to sewer network
No. of Sewage Sewage treated
households 0 generated in 0.64 through STP in 0
covered MLD MLD
Septage Coverage
No. of Sewage Sludge treated Grey water
households 0 generated in 2.41 through FSSM 0 recycled in MLD 0
covered MLD in KLD
Current Infrastructure assets/supply Projected consumption/demand Estimated gap FY25-26 (C)= (B)-(A)
FY21-22 (A) FY25-26 (B)
Water Supply
Water
Gap in water
supplied to 0.8 Water demand 3.76 2.96
supply
households
Water
Water to be Gap in water
treatment 0 3.76 3.76
treated treatment
capacity
Tap
Gap in
connections Total slum
0 0 household tap 0
provided in households
connections
slums
Households
Gap in
covered with Total
households tap
Tap 886 households 5504 4618
connections
connections including slums
including slums
(City)
Used Water
Gap in used
Used water Used water
0 2.768 water 2.768
being treated generation
treatment
Sewer Gap in
connections household
provided sewer
Total
(including 0 5504 connections/ 5504
households
coverage with coverage with
septage septage
management) management