CITY WATER BALANCE PLAN

Basic Details

ULB Information
District State Existing AMRUT City
City
BARABANKI UTTAR PRADESH No
HAIDERGARH (NP)

Name Designation Landline No. Mobile No. E-mail ID


eotownhgh@gmail.
Nodal Officer Ravindra Mohan Excutive officer 9198041799
com
eotownhgh@gmail.
Mayor.Pre Puja Dixit NA 8604427583
com
eotownhgh@gmail.
Municipal.C/C.Ofc Ravindra Mohan NA 9198041799
com
eotownhgh@gmail.
Head,W.S/S.De Ravindra Mohan NA 9198041799
com
eotownhgh@gmail.
HOD/P.H.de Ravindra Mohan NA 9198041799
com

Parastatal Agency
Any parastatal agency engaged? : Yes No. Of Parastatal Agency : 1
# Organization Nodal officer Designation Landline no. Mobile no. E-mail ID
name name
UTTAR PRADESH Project Manager
1 Sunil Kumar Singh 9532501783 pmnkeupjnfzd1@gmail.com
JAL NIGAM URBAN Nagar Karya Ikai

City profile as per FY 2020-21

City
Households City area (sq.
population(Census 17200 4247 4.00
(Census 2011) km.)
2011)

Slum
Industries
Wards in city 12 settlements 00 0
(No.)
(No.)

Population
survey
Industrial clusters 0 conducted in No Survey year NA
the last five
years ?

Survey city City population Households in


NA 20640 5096
population in 2021 2021(no.)

Slum Slum
Population density 5160 population in 0 households 0
2021 2021

Future Projection
City population in Households in Slum households
22291 5504 0
2025 2025 in 2025
Engineering College/ Organization/ Experts Working in Water Sector in the ULB
# Type Entity name Nodal officer Landline no. Mobile no. E-mail ID
name
No data available in table

Uploaded Images

# Type Name Uploaded image(s)

1 Water Body Kakrahiya Pond

2 Park Atal Bihari Park


Water Supply

Major Water Sources Details


# Type Name / Location No. of water Quantity of water Location outside Distance in km.
tapping points tapped in MLD
1 Tube Well NP Haidergarh 2 0.8 No NA
2 Handpumps NP haidergarh 415 0.62 No NA

Water Treatment Plants (WTP)


# Location of WTP Designed capacity Operational Water supply Technology used
in MLD capacity in MLD source for automatic
monitoring
No data available in table

Water Connections
# Water connections type No. of tap connections No. of households Water supplied in MLD
provided

1 Residential / Households 886 886 0.48

Commercial
2 0 NA 0
Establishments

3 Industries 0 NA 0

Institutional
4 0 NA 0
Establishments

5 Slums 0 0 0

Present Water Supply to Residential/Households incl. Slums


Piped water supply in Water supply directly Water supply through
MLD 0.48 through tankers in 0 tubewell & borewell in 0.32
MLD MLD

Treated water supply Total water supply in Average per capita


in MLD
0 MLD
0.8 water supply in LPCD
133.768

Estimated Future Water Demand in 2025 (in MLD)


Residential/
Commercial
Households including 3.46 establishments
0.2 Industries 00
slums

Institutional
establishments
0.1 Slums 0 Total 3.7600000000000002

Are you going to met the 100% future demand How much future demand in MLD will be met
through subsurface water source? through subsurface water source?
NA
WB Rejuvenation & RWH

Rainwater Harvesting (RWH)


Is rainwater
No. of water tanks
harvesting
Yes Status Implemented at religious places 0
included in
in your city
bylaws?

Water Source Quality Assessment


# Type Name Area Photograph Site latitude & Water quality Has the source
longitude assessment rejuvenated
1 Water Body Kakhariya pond 0.011 26.604 - 81.357 Bad No
Used Water

Sewerage Coverage
Household connected to sewer network
No. of Sewage Sewage treated
households 0 generated in 0.64 through STP in 0
covered MLD MLD

Household not connected to sewer network


No. of Sewage Sewage treated
households 5504 generated in 2.41 through STP in 0
covered MLD MLD

Septage Coverage
No. of Sewage Sludge treated Grey water
households 0 generated in 2.41 through FSSM 0 recycled in MLD 0
covered MLD in KLD

Sewage Treatment Plants (STP)


# Location of STP Designed Operational Reused capacity Reuse purpose Revenue from Automatic
Technology used
capacity in MLD capacity in MLD in MLD reused water monitoring?
No data available in table
City Water Balance Plan Summary

Current Infrastructure assets/supply Projected consumption/demand Estimated gap FY25-26 (C)= (B)-(A)
FY21-22 (A) FY25-26 (B)

Water Supply

Water
Gap in water
supplied to 0.8 Water demand 3.76 2.96
supply
households

Water
Water to be Gap in water
treatment 0 3.76 3.76
treated treatment
capacity

Tap
Gap in
connections Total slum
0 0 household tap 0
provided in households
connections
slums

Households
Gap in
covered with Total
households tap
Tap 886 households 5504 4618
connections
connections including slums
including slums
(City)

Used Water

Gap in used
Used water Used water
0 2.768 water 2.768
being treated generation
treatment

Used water Used water to


Gap in used
being 0 be recycled 0.554 0.554
water recycling
recycled (20%)

Sewer Gap in
connections household
provided sewer
Total
(including 0 5504 connections/ 5504
households
coverage with coverage with
septage septage
management) management