Saudi Arabian Oil Company: Electrical Power Plan Electrical Power Plan Electrical Power Plan

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SAUDIARAMCO.

NOTES:

1.ALL CABLE/CONDUIT INSTALLATION SHALL BE


IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING
STANDARDS SAES-P-104 AND WITH THE LATEST
EDITION OF NFPA-70 - NEC.

2.WIRING METHODS AND MATERIALS SHALL CONFORM


TO SAES-P-104 AND NFPA-70 - NEC.

OF
3.CIRCUIT WIRING FOR NEW FIRE SUPPRESSION CONTROL
PANEL SHALL BE REPLACE AND INSTALL WITH A

CONSENT
NEW SET OF WIRES.

4.EXISTING CIRCUIT BREAKER IN PANEL ACD1 AT MCC


INSIDE CONTROL VAN 1, 2 & 3 FEEDING EXISTING
FIRE ALARM PANEL FOR HALON SYSTEM SHALL BE
REUSED FOR NEW FIRE SUPPRESSION CONTROL

TTEN
PANEL AFTER REMOVING THE OLD FACP, REFER TO
PANEL SCHEDULE DWG. NO. DA-703275.005,

WRI
DA-703277.005 & DA-703279.005.

THE
THOUT
WI NG
DRAWI
GAI-TRONICS GAI-TRONICS GAI-TRONICS
PAGING SYSTEM PAGING SYSTEM PAGING SYSTEM

S
THI
BATTERY CABINET BATTERY CABINET BATTERY CABINET

FROM
LEGEND

NED
NEW CABLE NEW CABLE NEW CABLE
SEE NOTE-3 SEE NOTE-3 SEE NOTE-3

OBTAI
UCP - UNIT CONTROL PANEL
K05-FSCP-001 K05-FSCP-002 K05-FSCP-003
MTB - MASTER TERMINAL BOARD
PC-9482 PC-9483 PC-9484
PC-9484 - POWER CABLE TAG NO.9484
NEW NEW NEW

BE
TELEPHONE TELEPHONE TELEPHONE
TERMINAL FIRE ALARM TERMINAL FIRE ALARM TERMINAL FIRE ALARM

PART,SHALL
BLOCK CONTROL PANEL BLOCK CONTROL PANEL BLOCK CONTROL PANEL - SCOPE UNDER J.O. BI-10-00844-0001

- {20mm EMT CONDUIT


2
TO UPS ROOM TO UPS ROOM TO UPS ROOM INCLUDING 3x1/C-4mm THHN WIRE
PC-0381 PC-0471 PC-0561
CONTROL BLDG-6001 CONTROL BLDG-6001 CONTROL BLDG-6001
PC-0382 PC-0472 PC-0562 FSCP - NEW FIRE SUPPRESSION CONTROL PANEL
K05-MDP-0102/CKT #13 K05-MDP-0102/CKT #15 K05-MDP-0102/CKT #17
PC-0383 PC-0473 PC-0563
PC-2348 EXISTING PC-2349 EXISTING PC-2350 EXISTING

N
PC-0384 PC-0474 PC-0564

I
K05-CP-103 K05-CP-104 205-CP-105

FULL,OR
PC-0373 PC-0463 PC-0553
UCP UCP UCP
PC-0374 PC-0464 PC-0554
MCC)

MCC)
PC-0375 PC-0465 PC-0555

MCC)
PC-0376 PC-0466 PC-0556
DMC DMC DMC

PANEL

PANEL
PANEL
(

(
PC-0377 PC-0467 PC-0557

N
PC-0450 PC-0540 PC-0630

I
CENTER

CENTER
REFERENCE DRAWINGS

CENTER
VE-10-202-02
VE-10-202-01

PC-9639 PC-9641 PC-9643

ON
DRAWING CONTROL FOR BI-10-00493-0001 VD-688132

VE-10-202-03
UCP UCP UCP

CONTROL

CONTROL
CONTROL

REPRODUCTI
PC-0255
PC-9575
PC-0256
PC-9576
PC-0257
PC-9577 SCOPE OF WORK VE-688133

MOTOR CONTROL CENTER SCHEDULE DB-703274.001


CONTROL

CONTROL

CONTROL
MOTOR CONTROL CENTER SCHEDULE DB-703276.001
SEE MOTOR CONTROL CENTER SCHEDULE DB-703278.001
NOTE-4

T
T

SEE SEE

UNI

UNI
UNI

CABLE AND CONDUIT SCHEDULE DB-511300.001


UCP NOTE-4 UCP NOTE-4 UCP
CABLE AND CONDUIT SCHEDULE DB-506684.001
MOTOR

MOTOR

MOTOR
DC SUPPLY CABLE TO DC SUPPLY CABLE TO DC SUPPLY CABLE TO CABLE AND CONDUIT SCHEDULE DB-506694.001

SAUDIARAMCO.NO
PC-0378 PC-0468 PC-0558
UNIT CONTROL PANEL UNIT CONTROL PANEL UNIT CONTROL PANEL CABLE AND CONDUIT SCHEDULE DB-517305.001
FROM DCD-1/CKT #6 FROM DCD-1/CKT #6 FROM DCD-1/CKT #6 CABLE AND CONDUIT SCHEDULE DB-509236.001
125VDC EXISTING 125VDC EXISTING 125VDC EXISTING CABLE AND CONDUIT SCHEDULE DB-513220.004
STUB-UP PLAN DB-506836.001
ELECTRICAL EQUIPMENT LAYOUT & SECTION DA-703267.001
2 x 1.5kVA 2 x 1.5kVA 2 x 1.5kVA
ELECTRICAL EQUIPMENT LAYOUT & SECTION DA-703268.001
WALL MOUNTED WALL MOUNTED WALL MOUNTED
ELECTRICAL EQUIPMENT LAYOUT & SECTION DA-703269.001
DRY TYPE DRY TYPE DRY TYPE
CABLE AND CONDUIT SCHEDULE VA-688166.001
TRANSFORMER TRANSFORMER TRANSFORMER
DRAWING CONTROL FOR BI-10-00844-0001 PD-00ADCL

OF
480-240/240-120V 480-240/240-120V 480-240/240-120V
120 VAC DISTRIBUTION PANEL SCH DA-703275.005

PROPERTY
120 VAC DISTRIBUTION PANEL SCH DA-703277.005

120 VAC DISTRIBUTION PANEL SCH DA-703279.005

SOLE
MASTER TERMINAL BOARD MASTER TERMINAL BOARD MASTER TERMINAL BOARD
(MTB) (MTB) (MTB)

THE
ARE N
HEREI
0 0.5 1.0 2.0

METERS

NED
SCALE: 1 : 25M

CONTAI
REVISION VALIDATION

THIS REVISION NO. IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

ELECTRICAL POWER PLAN ELECTRICAL POWER PLAN ELECTRICAL POWER PLAN


REV.NO. DATE REVISION DESCRIPTION

1: 25M SCALE: 1: 25M SCALE: 1: 25M

I
0A3 07/01/21 ISSUED FOR 100% - PP

THE
(CONTROL VAN NO. 1) (CONTROL VAN NO. 2) (CONTROL VAN NO. 3) JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-00844-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY

AND
DRAWING TYPE

ELECTRICAL POWER PLAN EPD

NG
CONTROL VAN NO. 1, 2, 3

DRAWI
EAST/WEST PIPELINE PUMP STATION #2

YANBU SAUDI ARABIA

S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
K05 P VA-688165 003 0A3
Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-01