TABLE OF CONTENTS
PART 1 GENERAL............................................................................................................ 1
1.04 REFERENCES..................................................................................................... 1
1.05 SUBMITTALS....................................................................................................... 2
PART 1 GENERAL
A. Furnish and install the darkroom and photographic equipment areas and systems
based on the recommendation of the approved manufacturer. Selections and
quantities of equipment, materials and accessories shall comprise all the items
normally used for complete operation of the system.
1.04 REFERENCES
A. The referred codes and standards are intended to provide an acceptable level of
quality for materials and products. In case of conflict between these standards and
the text of this Specification, the Specification text shall govern.
B. The latest revision of the referred codes and standards shall be used wherever
applicable. In case of conflict, the Contractor shall propose equipment conforming to
one group of codes and standards.
1.05 SUBMITTALS
A. The Contractor shall submit to the Royal Commission, under the provisions of
SECTION 01330, the following items for review and approval before commencing
Work:
c) Optional auxiliary equipment and controls that will be included for the
project.
B. After installation of the equipment, the Contractor shall submit the following:
A. The Contractor shall be responsible for the quality of work and shall develop and
propose programs and methods of construction and testing to achieve the specified
quality to the approval of the Royal Commission in accordance with
SECTION 01450.
3. Contractor
B. In the absence of any of the above, best accepted industry practice shall be
employed throughout.
A. All the equipment/materials installed indoor shall be suitable for continuous operation
under the following service conditions:
a) Maximum of 40°C.
b) Minimum of 0°C.
a) Maximum of 50°C.
b) Minimum of 0°C.
2. Altitude shall be less than 1000 m, unless a higher altitude is specified in the
Contract Drawings.
A. All the equipment/material shall be tested at factory. The Contractor shall notify the
Royal Commission in writing not less than 30 days prior to the scheduled starting
date of the factory tests.
B. The Royal Commission reserves the right of deputing their representative for
witnessing the factory test.
C. Upon completion of factory test, and before shipment of the equipment/material, the
Contractor shall submit 5 certified copies of test reports not later than 10 days after
the completion of all factory tests for review and approval of the Royal Commission.
1.10 COORDINATION
A. The Contractor shall be responsible for the proper coordination of all phases of the
work under this Contract.
B. It shall be the responsibility of the Contractor to coordinate the work and equipment
as specified herein with work to be performed and equipment to be furnished under
other Sections of the specifications in order to assure a complete and satisfactory
installation.
A. The equipment shall not be delivered or installed until the following conditions have
been met:
1. Building areas are dry and unexposed to adverse weather conditions which
may damage finished materials.
A. The Contractor shall deliver, handle and store equipment and material units in
accordance with SECTIONS 01650 and 01660, as well as the following
requirements:
PART 2 PRODUCTS
2.01 GENERAL
A. All goods and products covered by these Specifications shall be procured, when
available, from an in-Kingdom manufacturer. Procurement of all goods and products
manufactured out-of-Kingdom must be approved by the Royal Commission.
A. General
a) Color enlarger.
3. The new color enlarger shall be the same as existing units for ease of
operation and maintenance.
B. Darkroom Casework
2. Laminate shall have low luster and shall be chosen from the factory’s standard
selection.
3. All exterior and interior surfaces shall be able to be cleaned with soap and
water.
4. All cabinets shall be manufactured with hinged doors, drawers and face
panels.
5. Shelves shall be adjustable and furnished with shelf clips capable of securing
the shelf in a fixed position. Easy access to adjustable shelves shall be
maintained.
C. Revolving Door
1. The revolving door shall be two-way type unless otherwise specified on the
Contract Drawing.
2. The revolving door shall consist of an inner cylinder revolving inside a close
fitting outer cylinder with the required number of door openings.
3. The construction of the inner and outer cylinders shall be of a rigid high-impact
petroleum hydrocarbon polystyrene or Acrylonitrile Butadiene Styrene (ABS).
4. The door material shall retain its original shape when accidentally struck and
shall not rust in the humid photo lab environment.
5. The inner cylinder shall revolve noiselessly and easily from one opening to the
next with no possibility of jamming or light leaks. Felt light seals shall be easily
removed without the use of special tools.
e) Security lock.
f) Breakaway hardware.
D. Darkroom Curtain
2. The curtain track shall be made of a satin anodized aluminum designed for
surface mounting to the underside of the ceiling.
2. The design of photographic studio room shall provide maximum flexibility for
the activities anticipated.
C. Sink Unit
1. Each sink unit shall be completely assembled at the factory and shall consist
of sink, base cabinet and pre-piped fittings and equipment.
2. Each sink unit shall develop maximum strength and rigidity in each integral
unit.
3. Sink unit shall be fabricated with a polyester resin work surface, reinforced with
a glass fiber mat.
5. The sink unit shall be one piece molded construction with radius inside and
outside corners and bottom sloped to ensure positive drainage.
7. Each unit cabinet or stand shall be equipped with 4 or more adjustable leveling
legs as required to properly support and level each individual unit.
1. Pipe traps with clean out plugs and fittings shall be chemical-resisting. The
clean out plug shall be removable without tools.
PART 3 EXECUTION
3.01 GENERAL
A. The Contractor shall be responsible for coordinating the installation of the darkroom
equipment and photographic studio room to ensure complete and fully operational
immediate use once a facility is complete.
D. A set of working drawings shall be at the site at all times during the works. All work
shall be subject to acceptance by the Royal Commission. Deviations from the
Contract Drawings/Document and specifications shall not be permitted, except upon
prior written permission of the Royal Commission.
F. All equipment and system installation and activation work shall be performed
according to the latest manufacturing technology and the Royal Commission rules
and regulation.
G. During the construction period, the Contractor shall be responsible for protecting
equipment from dirt, water, and chemical or mechanical injury.
A. General
1. The Contractor shall carry out all site tests in accordance with approved test
procedures to ensure that the equipment and related accessories comply with
this Specification and operational requirements. All tests shall be subject to
witnessing by the Royal Commission’s representative.
2. At least 4 weeks prior to schedule tests, the Contractor shall submit to the
Royal Commission an outline of the plan and procedures to be used in
performing the site inspection and site tests. This shall include a brief
description of the test equipment, reference drawings, proposed tests and
procedure, test sheets, calculations, reference drawings and
minimum/maximum test and performance values in conformance with the
specification and acceptability of the equipment and acceptability of the
installation.
5. Upon completion of all testing, the Contractor shall submit 5 copies of certified
reports attesting that each test has been performed in accordance with the
approved test procedures. The report for each test shall include the name of
the person in-charge of the test and the date of performance. All factory and
field test reports shall be included in Operation and Maintenance Manual.
6. Care shall be taken that the test apparatus does not damage the equipment or
other related accessories during the testing.
END OF SECTION