1.4. Integrated Service Management (ISM)
1.4. Integrated Service Management (ISM)
1.4. Integrated Service Management (ISM)
63
64
disruption of the service quickly gains a higher The absence of SLA's with clear, controllable and
priority than investigation for the sake of quality measurable service parameters serves to worsen
improvement. the classic discontent of IT buyers.
However, solving incidents without structurally
improving quality is like `mopping the floor while Bottleneck 4. Limited additional value of
the sink is still flooding over'. configuration management
The absence of a structure in which a pro-active, Often, an ITIL `implementation' will start at
quality improving objective has a chance of an early stage, setting up and fleshing out a
success means that the permanent quality Configuration Management Database, the CMDB.
improvement has been neglected. According to the developers, this CMDB should
serve many purposes such as configuration
Bottleneck 3. The difficult relationship management, asset management, resource
between service agreement and delivery management, cost management, etc. and should
With the implementation of a process-based support practically all processes. This creates a
approach, it was hoped that contracts (SLA's) database full of detailed information that contains
would primarily include a service description, many inter-relationships. Maintaining such a
coupled with a number of parameters concerning database is often very time-consuming, making
availability, response time, set-up times etc. it almost impossible to verify data. The problem
However, in practice, the service provider often is aggravated further by the fact that those who
finds it easier to simply charge a couple of easily are responsible for the detailed maintenance of
allocated costs, either with or without commer- changes, i.e. system managers, operators and/or
cial surcharge. The customer, on the other hand, change support staff, do not see the full benefit
still appears to be looking for the safety of a of their efforts in their daily work. Proper
recognisable costing structure based on matters maintenance of a CMDB, therefore, requires a
such as hardware (type of computer, amount of great deal of discipline and effort. The returns are
Megabytes, network capacity), software and further diminished as, in the case of many of the
hours of support, instead of recognisable perfor- larger actions, the CMDB often does not contain
mance units in terms of operational processes. the information required, making further stock-
The resulting bottleneck is that both parties still taking necessary.
come to an agreement but that this agreement The CMDB offers limited support for activities,
does not describe the actual needs of the cus- while its maintenance requires a disproportio-
tomer, namely the required IT service and the nately large amount of effort.
associated support. The supplier, on the other
hand, is left with the problem that he might Bottleneck 5. Questionable added value of
deliver what was contractually agreed upon, but process
that the customer is still not satisfied. Process descriptions establish the sequence of
The cause of this problem is two-fold. The cus- activities. Often, this is not the shortest route
tomer is not IT conscious enough to properly from A to B. A number of activities described in
evaluate a service and therefore, tries to find the processes, such as checks, authorisations
safety in the description of the resources to be and registrations, form part of the process itself,
deployed (hardware, software and humanware). to ensure quality and are not aimed at the
Not only does the supplier find it difficult to establishing of the main objective of the process.
determine the cost of the service, but even more Certain other activities are necessary for
to steer the organisation towards service facilitating other processes. The importance and
parameters. the execution of these processes are not always
65
obvious to the persons who actually do the work. The lack of coherence between operational
This problem occurs especially if the objective of processes on the one hand, and tactical and
the process, the description and the total picture strategic processes on the other hand, causes
of the full model, are not clear enough. too large a gap within the organisation.
The absence of clarity regarding the position of
activities within the process and the absence of Bottleneck 8. Customisation is difficult
the understanding of the importance of those It is the aim of every manager to continuously
activities within the framework of the total improve. Until recently, an availability of 99%
service causes lack of motivation. was a veritable achievement.
Due to continuous improvements to the quality
Bottleneck 6. Slowing down effect of of hardware and software, and certainly also
over-documentation in the standard of managers, the realisation of
Descriptions of processes, procedures and better performance by components of the
work instructions are not generally fun to read, technological infrastructure is proving more and
especially for those who are required to execute more achievable. The infrastructure, on the other
them. The same goes for descriptions of processes hand, is becoming increasingly complex and
and process models. service levels are becoming more specialised.
Descriptions often tend to list all of the variants Performance is crucial to some applications,
and exceptions occurring within a process in one whereas to other applications, it is data integrity
go, often giving a detailed exchange of infor- and recovery up to the last second, or simply
mation. If the processes, procedures and working availability.
instructions are also recorded in a single, all- For some services, the standard level of the
encompassing document this results in a docu- service is too high for the nature of the business
ment that is very inaccessible, both in use and it supports. For example, not all discs need to be
maintenance. doubled, the failure of one of the ten work-
Many people, especially beginners, are stations may not need to be resolved within 8
overwhelmed with the amount of rules and hours, or the loss of one day of production may
regulations that seem to push the actual work be less costly than the costs of prevention.
into the background. If the service level is properly attuned to the
Brief, simple and clear descriptions of the working business, it suffices to simply deliver what is
method, summaries of the main points, are usually requested. The same applies here: `You can
absent. have too much of a good thing!'
Unlimited service leads to unnecessarily high
Bottleneck 7. Process and procedures only costs, possibly endangering the competitive
cover part of the activities position.
The original IPW description focuses on a number
of operationally positioned processes. The Bottleneck 9. Projects/Taskforces/
strategic and tactical processes are acknowl- Escalations
edged but have not been designed with the The complexity and dynamics of the ICT
operational processes in mind. This causes a management requires proper fine-tuning of all
breakdown in communication at the borderlines those involved. A good process model and clearly
of the processes, leading to errors and delays. worked out procedures, work instructions and
This gap is also the cause of the lack of grip on good supporting tools are suitable aids.
and the understanding of management in relation Due to time pressure or size, the performance of
to the operational activities. certain actions is sometimes kept outside of the
66
67
68
People
Hardware
System Technical
software infrastructure
Information Communication
system facilities
Information
Application technology
software
Applications
Databases
Technical
facilities
related incidents. The same applies to the change The impact of the organisation paradigm on the
process. ISM model
By nature, the infrastructure paradigm provides Of course, the design of an ISM model focuses
important guidelines for the service-oriented on a process-based approach: it is first deter-
populating of the CMDB. mined which processes need to be executed
By showing the information system per service, a within an organisation. Next, the optimum combi-
meaningful specification of the various necessary nation of people and products infrastructure is
resources is created. This is important for both determined. Environmental factors (culture,
the preparation of a new service and for its financial position, etc.) play an important role in
continuous delivery. the latter.
ISM always discriminates between these
The organisation paradigm
69
infrastructures. A process model is defined The impact of the control paradigm on the
which consciously excludes all influences of the ISM model
people, the organisation infrastructure. As an On the one hand, applying the control para-
implementation is greatly determined by the digm leads to the typification of the recognised
environmental factors and by subjective issues processes according to one of three levels as
such as the preference of the current manager or indicated. The ISM processes are always chosen
by culture, this document remains limited to the in such a way that they will fit univocally into
indication of several implementation variants. one control level. For example, the Problem
Requirements concerning the products infra- Management process is characterised as a
structure to be employed may also be derived tactical process: it determines which improve-
from the process infrastructure The nature and ments must be made to the infrastructure to
character of the products depend on many facilitate the required service quality, or in the
environmental factors and are, therefore, not case of internal improvements, to efficiency. This
developed further. process, therefore, does not include operational
activities regarding the infrastructure. This is
The control paradigm contrary to the relevant ITIL definition. In ISM,
the reactive activities contributed by ITIL for the
Elaboration of the control paradigm Problem Management process always fall under
Within each organisation, a number of control the Incident Handling process, regardless of the
levels can be distinguished. The control para- incidents in question.
digm assumes that three control levels can be
distinguished within each organisation (Figure 4): The integration paradigm
à The strategic level that mainly determines
the long-term information policy and that Elaboration of the integration paradigm
provides a global vision and direction for the The integration paradigm ensures the delivery of
organisation. the service, as seen from the point of view of the
à The tactical level that translates the vision supplier. The customer is not concerned with this
and policy, as defined at the strategic level, division of the components and it is, therefore,
into a medium-term specification of the hidden: the customer only `sees' the `total
infrastructure facilities. supplier'. The supplier is responsible for managing
à The operational level. This level transforms the interface(s) with the sub-supplier(s).
the infrastructure specifications into the The supplier, hereby, assumes the role of system
information systems being used. integrator for the sub-suppliers of components
constituting the integrated service (Figure 5).
The domain of the supplier can consist of one or
Strategic more sub-domains. The integrated service to be
delivered is then divided into components of the
various sub-suppliers.
Tactical
The impact of the integration paradigm on the
ISM model
Operational
Each sub-domain that is to be put into practice
can be specified and split off as an independent
domain. The requirements for the total service
Figure 4 The control paradigm are translated into requirements applicable to the
70
Integrator
The considerations and paradigms presented
above lead to the generic model for Integrated
Service ManagementÕ (Figure 6). For the IT
Integrator Supplier
service supplier to be able to deliver a composite
service, it is essential to take the role of
integrator if the service is to be split into
components. The integrator manages the S S S
71
Customer Supplier
Figure 8 Elaboration of the most important interactions between customer and supplier
72
Strategic Strategic
Strategic
Strategic
Marketing
RFI
RFI
Information Acquisition Innovation Information
PROBL COST
Delivery order
Delivery order
Tactical service SEC AVM HRM SLA reporting
SLA reporting management
W V
Figure 9 The Integrated Service Management model. This model only shows the process relationships
and not the flow of information. Nor does it include any quality processes. Quality management is
thought to be applicable to all elements and levels within this model
The Integrated Service Management contacts with the customer are maintained.
process model Based on a Request For Information (RFI), the
iterative interaction with the customer finally
The previous paragraph established the para- determines the shape and form of the service to
digms, creating a generic model for the delivery be delivered, the information the customer needs
of an integrated service. At this stage, the and how it is to be achieved. As soon as the
processes occurring on a strategic, tactical and customer decides that the supplier might be able
operational level need to be completed.The model to meet the information needs, a Request For
shows three levels as well (Figure 9). Proposal (RFP) is drawn up.
73
to a delivery order: the input for the Tactical tion of the ISM model, it is essential that one
Service Management process (group). has a clear picture of the definition of managed
This delivery order shall be in the form of an infrastructure. This requires agreements being
agreement (contract) stating the terms made within the whole of the organisation, to
and conditions and the specifications of the prevent confusion. The fact is that the ISM model
service to be delivered, i.e. the service level only concerns this managed infrastructure.
agreement (SLA). The model can further distinguish between
The Tactical Service Management process is changes to copies and types. Objects for which
aimed at the achieving and continuation of the the type (a characteristic feature of the object)
requested service. It might also lead to changes, are processed using the change
organisational adjustments, e.g. setting up a process. Changes relating to (identical) copies
7 ¾ 24 hour support. are not processed using the change process, but
The tactical level also sees processes concerning are processed in the production process and
the care of the infrastructure. The model has 10 registered in the CMDB.
processes, included within the Tactical Infra- The production process executes all operational
structure Management (TIM) process group. activities related to the service to be delivered.
TIM is the total of all processes ensuring the These activities can be triggered from the
layout of the infrastructure remains such that the incident and change process and lead to
integrated service is delivered in conformity with adjustments to the daily planning in the produc-
the agreements. The following processes are tion process. The customer domain will also
distinguished within TIM: produce questions and small orders, however,
à Availability Management. directly interfering with the production process.
à Capacity Management. Examples of small orders include a one-time
à Contingency Management. production of a database query and the addition
à Cost Management. of a user profile to an authorisation database.
à Vendor Management. One final trigger (series) for the process
à Performance Management. production originates from the TIM processes
à Security Management. (e.g. problem solving and innovation projects).
à Problem Management.
à Lifecycle Management. Process integration between domains
à Human Resource Management. Interactions with sub-suppliers of the integrated
service are controlled from the processes
Operational processes described in the ISM model. The model does not
The operational level sees the delivery of the dictate any requirements to the working process
service in conformity with the specifications or method within the sub-domains, apart from
as agreed with the customer. Of course, no the fact that each of the identified ISM processes
information system is perfect and the ISM model requires uniform input by sub-suppliers. This way,
also has the necessary processes in place to deal the interaction can be specified clearly and the
with disruptions and adjustments in a correct and agreements can be guaranteed by means of a
adequate manner. To enable proper implementa- quality system.
74