Hydro Testing Report

Purpose:
Hydro test of pre-fabricated air cooler piping arrangement to check
soundness of welding.
Location:
At unit 2 generator barrel

Pressure Details:
Date Pressure Time Status
(MPA) (Min)
21/11/2021 0.75 30 Some leakage found and rectified
21/11/2021 0.75 30 Cleared; no leakage found

Pictures showing the arrangement been shown attached herewith