Job No: GA13011 Name of Project 109MW Main HFO Power Plant Project - Bangladesh Title 132/11kV Transformer Control & Protection Panel Revision: 00
Job No: GA13011 Name of Project 109MW Main HFO Power Plant Project - Bangladesh Title 132/11kV Transformer Control & Protection Panel Revision: 00
APPR.
CHECK
A A
NAME
DATE
B B
C C
E E
APPR.
F F
CHECK
G G
PO No: MPPL/CLC/PO-05/13-14
H H
Title
g
Project : 109MW Main HFO Power Plant Title : Title sheet Date 16.08.13
Title : 132/11kV Trafonsformer Control & Protection Panel
Drawn RJS GE Rev Sheet 01
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 02
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Sheet Next Sheet Description Rev. Revision Note Sheet Next Sheet Description Rev. Revision Note
APPR.
01 02 Title Sheet 00
CHECK
A A
02 03 List of Drawings 00
03 04 Panel Details - General Arrangement 00
NAME
11 15 Bill of Meterial 00
B B
15 20 Symbols 00
20 30 Protection Block Diagram 00
30 40 Trip Matrix 00
40 41 DC Distribution & DC Fail Circuit 00
REVISION
41 70 AC Distribution Circuit 00
C C
70 71 Annunciation Circuit 00
71 72 Annunciation Circuit 00
72 80 Control and Indication Circuit 00
REV.
G G
REVISION
H H
g GE
Title : 132/11kV Trafonsformer Control & Protection Panel Project : 109MW Main HFO Power Plant Title : List of Drawings Date 16.08.13 Rev Sheet 02
Drawn RJS
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 03
01 02 03 04 05 06 07 08 09 10 11 12 13 14
A 800 A
=T1 +RP1
Equipment Name Description
g =T1 +RP1 -CL
FC
132kV side of 132/11kV Trafo Protection Relay Panel
Annunciator
87T Differential Protection Unit
1 5 9 13 17 21 67 A,B,C & 67N and 50 protections 50/51 Backup Protection Unit
B H1 B
are minimum required.As an back up
2 6 10 14 18 22 Position Indicator for Breaker
3 7 11 15 19 23 H2 Position Indicator for Disconnectors
protection.
4 8 12 16 20 24 CS-Q0 CB Control Switch
CS-Q1 Isolator Control Switch
PB1, PB2, PB3 Push Button for Annunciation Accept, Reset, Lamp Test
86A, 86B Master Trip Relays
30AB, 30CD, 30EF, 30GH, 30JK Auxiliary Relays for Transformer Trouble Functions
87 T60
195, 295 Trip Coil Supervision Relay TC1 & TC2
Standby earth fault protections shall 86RST Trip Relay Rest
C 86AX C
have to be provided from neutral CT of
Group-A High Speed Trip Relay, Type:RXMS
86BX Group-B High Speed Trip Relay, Type:RXMS
50/51
47MVA Transformer. 80A,80B
TS1
DC Supervision Relay
Test Switch for Transformer Protection Relay
TS2 Test Switch for Backup Protection Relay
F650
**NOTE: For Cubicle Details Board arrangement refer Drg.No GA13011-CD
PB1 PB2 PB3
O N C H2 Indicates Blank Plate
D CS-Q1
H1
Shall be revised as per M/s D
2000
30EF
195
295
F F
86RST
30GH
86AX
86BX
30JK
80A
80B
TS1
TS2
Please check and correct the base frame height
G as per cubical drawings, M/s GE shall have to Painting thickness shall be 85 microns, with RAL G
maintain all the switch yard control room panels 7035.
100
GE WIREWAY 60 X 60
F F
+B.40 +C.40
G +B.10 EARTH BAR +C.10 G
PLANE-A PLANE-B PLANE-C
PANEL REF: =T1 +RP1
H H
g GE
Title : 132/11kV Trafonsformer Control & Protection Panel Project : 109MW Main HFO Power Plant Title : PanelDetails Date 16.08.13 Rev Sheet 04
Drawn RJS
Project - Bangladesh Internal View Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 10
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Panel Reference : =T1 +RP1
APPR.
SL. No. Device Device Type Technical Manufacturer Qty GE Item Code Sheet Ref.
Designation Description Designation Data
CHECK
A A
01 =T1 +RP1 132kV side of 132/11kV Transformer Protection Panel Relay Panel With Swing Frame & Dimensions: (WXDXH) 800 X 800 X 2100mm (Base Frame: 100mm (H)) GE 01 03
Protective Glass Door Paint: Powder Coated
Exterior & Interior : RAL7035
NAME
4 Rows x 5 Columns
B B
Color of Trip Window: Red
Color Of Non Trip Window: White
With Inbuilt DC/AC Fail Annunciation
Auxiliary Supply :220V DC / 230V AC
04 87T Transformer Differential Protection relay Numerical Model No : T60-J03-HKH-F8L-H6D-M8N-P67-UXX-WXX GE 01 211
Communication Protocol: IEC61850
Communication Port: RS232 & Rear RS485 & 10/100 Base-T
Protection Functions : Differential
REVISION
06 86A Master Trip Relay for Differential Protection Latching Type Model No : RXMVB2 ABB 01 150
86B Master Trip Relay for Backup Protection Contacts: 6 N/O + 2 N/C ER 01 151
Flag: HR
Auxiliary Supply : 220V DC
D D
07 86AX Group-A High Speed Trip Relay Electro Mechanical Model No : RXMS ABB 01 150
86BX Group-B High Speed Trip Relay Contacts: 6 N/O SR 01 151
Auxiliary Supply : 220V DC
08 86RST Push Button for Lockout relay Reset 2 N/O, 2 N/C ABB 01 150, 151
09 195 Trip Circuit Supervision Relay for CB Close & Trip Coil-1 Static Model No : RXTCS ABB 01 82
295 Trip Circuit Supervision Relay for CB Trip Coil-2 Contacts: 2 C/O + 1 N/O + 1 N/C S/R 01
E Indication: LED E
Auxiliary Supply : 220V DC
10 80A DC Source-1 Supervision Relay Static Model No : TSR ABB 01 40
80B DC Source-2 Supervision Relay Contacts: 2 C/O S/R 01 40
Indication: LED
Auxiliary Supply : 220V DC
APPR.
11 PB1 Pushbutton for Anuunciation Accept Momentry contact type Size: 22.5mmDia TEKNIC 01 70
Colour: Red
F Contacts: 2 N/O+2 N/C F
CHECK
PB2 Pushbutton for Anuunciation Reset Momentry contact type Size: 22.5mmDia TEKNIC 01 70
Colour: Yellow
Contacts: 2 N/O+2 N/C
NAME
PB3 Pushbutton for Anuunciation Test Momentry contact type Size: 22.5mmDia TEKNIC 01 70
Colour: Blue
Contacts: 2 N/O+2 N/C
12 TS1 Test switch for Differential Protection Relay Model No : ERMLG ER 01 110
DATE
SL. No. Device Device Type Technical Manufacturer Qty GE Item Code Sheet Ref.
Designation Description Designation Data
CHECK
A A
15 H1 Position Indicator for Circuit Breaker LED Size: 30mm Dia DOM0 01 80
TV22/30 CRQ RG.V220 Auxiliary Supply : 220V DC
NAME
SL. No. Device Device Type Technical Manufacturer Qty GE Item Code Sheet Ref.
B B
Designation Description Designation Data
01 MCB-01 MCB for DC1 Incoming Circuit Rating: 10A GE 01 40
MCB-02 MCB for DC2 Incoming Circuit Rating: 10A 01 40
MCB-03 MCB for Main Protection Circuit Rating: 6A 01 40
MCB-04 MCB for Backup Protection Circuit Rating: 6A 01 40
MCB-05 MCB for CB Close & TC1 Tripping Circuit Rating: 10A 01 40
MCB-06 MCB for CB TC2 Tripping Circuit Rating: 10A 01 40
MCB-07 MCB for Annunciation Circuit Rating: 6A 01 40
REVISION
G G
REVISION
H H
g GE
Title : 132/11kV Trafonsformer Control & Protection Panel Project : 109MW Main HFO Power Plant Title : Bill of Material Date 16.08.13 Rev Sheet 11
Drawn RJS
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 15
01 02 03 04 05 06 07 08 09 10 11 12 13 14
APPR.
SYMBOLS
CHECK
A A
CURRENT TRANSFORMER RELAY COIL NON DISCONNECTING TYPE TERMINAL
NAME
DATE
B B
I MINIATURE CIRCUIT BREAKER NORMALLY OPEN CONTACT DISCONNECTING TYPE TERMINAL
REVISION
C C
REV.
1 2
G G
PANEL BOUNDARY RELAY BOUNDARY
1 2
STAYPUT TYPE CONTROL SWITCH
REVISION
H H
g GE
Title : 132/11kV Trafonsformer Control & Protection Panel Project : 109MW Main HFO Power Plant Title : Symbols Date 16.08.13 Rev Sheet 15
Drawn RJS
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 20
01 02 03 04 05 06 07 08 09 10 11 12 13 14
APPR.
132kV BAY
CVT-3 CORE
Ratio: 132kV 110V 110V 110V
CHECK
A A
3 3 3 3 =T1 +RP1
145kV, 3P, 1250A,
CL: 0.2, 50VA
40KA ISOLATOR CL: 3P, 50VA
WITHOUT EARTH M CL: 3P, 50VA
NAME
SWITCH 50/51
Backup Protection Unit-F650
DC1
DC2
ANSI IEC CODE IEC SYMBOL
DATE
SLD.
132kV CT 21 Z> =PDIS
C CORE-1 24 V/F > C
RATIO: 300/1A 64R Id > =PDIF
CL: PS, 15VA
CORE-2
REV.
RATIO: 300/1A
CL: 5P20, 15VA
CORE-3
Stabilizing resistor shall have to
D RATIO: 300/1A
CL: 1.0, 15VA
be provided for REF protection, if D
relay does not contain any inbuilt
120kV
P2
stabilizer resister.
10kA
CL-3
E 47 MVA POWER TR.1 E
11/132kV, WITH
P2 P1
Cable sizes shall
YNd11 have to
OLTC-10% TO +5% NCT
RATIO: 300/1A
be mentioned as per M/s CL:5P20, 15VA
Magnus inputs. One more NCT core shall Cl:5P20 CT core shall have
APPR.
G G
CT and 11kV side CT for calculating the Knee point
voltage and I mag at Vk/2.
This CT Technical details shall have to be
mentioned as 3000/1A, CL:PS, Core-1
H H
REVISION
A A
CB-52
IED ANSI CC TC1 TC2 Block CL 86A 86B
NAME
50N X X X
50/51
51N X X X
87T 87T X X X
DATE
21 X X
B 64R X B
X
24T X X
24A
86A X X X X
86B X X X
195 O O
-Ext
REVISION
295 O O
C Legend : C
O - Supervision
X - Action
86A & 86B - Lock Out Relay
TC - Trip Coil Supervision for 86A and 86B
CC - Close Coil
relays shall also have to be
REV.
provided.
D D
E E
APPR.
F F
CHECK
NAME
DATE
G G
REVISION
H H
g GE
Title : 132/11kV Trafonsformer Control & Protection Panel Project : 109MW Main HFO Power Plant Title : Trip Matrix Date 16.08.13 Rev Sheet 30
Drawn RJS
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 40
01 02 03 04 05 06 07 08 09 10 11 12 13 14
DCDB =T1 +RP1
APPR.
MCB 01 - 10A
I
80A
TB3
+ J1 J3 TSR
CHECK
A 220V DC A
3 4 11 21
Source-1 J2 J4
Supply -
MCB 05 - 10A
1 2
MCB 03 - 6A
MCB 07 - 6A
MCB 08 - 6A
16 15
NAME
1 3 1 3 1 3 1 3 17
TB3
To + I I I I 26 25
Adjacent
DATE
- 2 4 2 4 2 4 2 4 To Annun. Ckt.
Panel
B 27 Sh.71 B
K102
K101
K702
K701
L102
L101
J2
J1
C
supply-1/ supply-2/ C
independent sources.
REV.
MCB 02 - 10A
I
80B
TB3
220V DC + J21 J53 TSR
D 3 4 11 21 D
Source-2 J22 J54
Supply -
MCB 06 - 10A
1 2
MCB 04 - 6A
16 15
1 3 1 3 17
TB3
To + I I 26 25
Adjacent 2 4 2 4
Panel - To Annun. Ckt.
27 Sh.71
K202
K201
J102
J101
E E
To Backup Protection Ckt. To CB Closing &
Sh.121 TC2 Tripping Ckt
Sh.80
L111
To Annun. Ckt.
L157 Sh.71
APPR.
11 12
11 12
F F
11 12
CHECK
11 12
11 12
NAME
11 12
11 12
11 12
DATE
G G
REVISION
H H
g GE
Project : 109MW Main HFO Power Plant Title : DC Distribution & DC Fail Circuit Date 16.08.13
Title : 132/11kV Trafonsformer Control & Protection Panel
Drawn RJS
Rev Sheet 40
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 41
01 02 03 04 05 06 07 08 09 10 11 12 13 14
APPR.
A I A
TB3
PH H1 H11
230V AC 3 4
Supply NU H2 H12
NAME
1 2
DS H13 CFL
DATE
B HS HT B
H15A H15
TB3
1 2
PS
230V AC Supply E
To Adjacent Panel
As Applicable
REVISION
C C
REV.
D D
E E
APPR.
F F
CHECK
NAME
DATE
G G
REVISION
H H
g GE
Project : 109MW Main HFO Power Plant Title : AC Distribution Circuit Date 16.08.13
Title : 132/11kV Trafonsformer Control & Protection Panel
Drawn RJS
Rev Sheet 41
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 70
01 02 03 04 05 06 07 08 09 10 11 12 13 14
=T1 +RP1
APPR.
FROM SH.40
FC 24 WAYS
L101+
L102-
PB1 PH
CHECK
A L105 A
ACCEPT A NU
1-3 1-4
PB2 AD
L107
RESET
NAME
R AD
1-3 1-4
PB3
L109 E
TEST T
DATE
L111
Differential Protection Unit-T60 COM
C (P4) Cont Op 4 DIFF. PROTN. OP. C
Seal In OFF 4b L121 DIFFERENTIAL
50/51 Sh.221 1C
Differential Protection Operated 4c PROTECTION
Backup Protection Unit-F650 OPERATED
T
REV.
CB-52 295 CB
L133 6C
21 23 TRIP COIL-2
F FAULTY F
SH.81
NT
CHECK
26
X1 -S3 X1 L135 CB
31 7 8 32 27 7C SPRING
NAME
CHARGED
NT
mention description as CB
X1 -S12 X1 L137 CB
8C
DATE
G 33 13 14 34 REMOTE G
Control on remote
28
INDICATION
NT
X1 -K2 SF6
21 24 9C PRESSURE
29
X1 L141 BLOCKING
22 30
NT
29
-F2
X1 X0 SF6 GAS
10C REPLENISHMENT
11 11 13
REVISION
H 18 H
X0 X1 L143 ALARM
12 12 19
NT
30
Drg No: 1HYB903940-3 Sh.3 TO SH.71
g GE
Project : 109MW Main HFO Power Plant Title : Annunciation Circuit Date 16.08.13
Title : 132/11kV Trafonsformer Control & Protection Panel
Drawn RJS
Rev Sheet 70
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 71
01 02 03 04 05 06 07 08 09 10 11 12 13 14
=T1 +RP1
APPR.
FROM SH.70
CHECK
A FC 24 WAYS A
30A TRAFO
L145
13 14 SH.90 11C MEC. FAULT
30B
NAME
14 SH.90
TRIP
87T SH.211 13 30C
30D 13 14 SH.90 T
Differential Protection Unit-T60
13 14 SH.90 30E
(P7) Cont Op 7 24 TRIP 13 14 SH.91 30F OVER FLUX
DATE
7b 13 14 SH.91
PROTECTION
Seal In OFF L147 12C TRIP
B B
Over Flux Protection Trip 7c
NT
(P8) Cont Op 8 24 ALARM OVER FLUX
Seal In OFF 8b
L151 13C PROTECTION
ALARM
Over Flux Protection Alarm 8c
NT
REVISION
45
L153 14C
Annunciation windows shall also covers 50 LBB, 86
SPARE
C 46 C
NT
Spare
47
LBB,86A/86B Operated.
L155 15C SPARE
48
REV.
NT
L157 PANEL
87T From Sh.40 16C
SH.211 MCB TRIP
D Differential Protection Unit-T60 D
Critical Failure NT
B1a
L161 MAIN
CRITICAL FAILURE B2b 17C PROTECTION
RELAY FAULTY
50/51 Sh.221 NT
Backup Protection Unit-F650
Power Supply Ok BACKUP
H14 PROTECTION
L163 18C
RELAY FAULTY
E POWER SUPPLY OK H15 E
NT
80A
L165 19C DC
SUPPLY-1 & 2
26 27
80B FAIL
NT
Each transformerSH.40
related alarm shall
26 27
APPR.
TRAFO
be provided 30G
with sperate windows in L167
TROUBLE
20C ALARM
F 13 14 F
30H
annunciator.SH.91 NT
CHECK
30J 13SH.9114
13 14 30K
SH.92 SPARE
37 21C
13SH.9214 L171
NAME
38 NT
39
L173
SPARE
DATE
40 22C
G Spare G
NT
41
L175
SPARE
42 23C
NT
43
L177 SPARE
44 24C
REVISION
H H
NT
g GE
Title : 132/11kV Trafonsformer Control & Protection Panel Project : 109MW Main HFO Power Plant Title : Annunciation Circuit Date 16.08.13 Rev Sheet 71
Drawn RJS
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 72
01 02 03 04 05 06 07 08 09 10 11 12 13 14
=T1 +RP1
APPR.
From Sh.40
+ -
K701
K702
ISOL-89-T CB-52
CHECK
A TB4 A
71 89T-b -S1
K3 TB3 TB3 TB1 X1 X1
NAME
C K707
REMOTE CLOSE
3 4 441
C 77 430 C
K703 +Ve FROM L/R SWITCH
78 431
Drg No: 1HYD990161-303 Sh.2
REV.
F F
CHECK
NAME
DATE
G G
REVISION
H H
g GE
Project : 109MW Main HFO Power Plant Title : Control and Indication Circuit Date 16.08.13
Title : 132/11kV Trafonsformer Control & Protection Panel
Drawn RJS
Rev Sheet 72
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 80
01 02 03 04 05 06 07 08 09 10 11 12 13 14
=T1 +RP1 CB-52
APPR.
TB4 X1+ Ve
J1
220V DC SUPPLY 55 01 TO CB LOCAL CLOSING &
J2 - Ve
CHECK
=SD +RP1
2TB4 2TB4 T K27 TB4 X1
10
REMOTE OPEN TC1
DATE
07 07 86A 86B 1 2 57
296
B K31B K31A C K31 B
REMOTE CLOSE
08 08 223 224 223 224 9 10 58 9
Sh.123 SH.150 SH.150
Drg No: GA13011-06 TB4
59 -S1
K15 X1 X1
60 102 101
-S1
Same shall have to be K17
REVISION
61 104 103
C changed as required by M/s C
Magnus.
REV.
TB4 X1+ Ve
J101
220V DC SUPPLY 65 * TO CB
SH.40 J102 - Ve TC-2 CIRCUITS
66 03
D TB4 D
To Sh.81 67
T K29 X1
REMOTE OPEN TC2
3 4 68 11
86 LBB, 195 and 295 contacts shall also
to added in series for remote closing. Drg No: 1HYB903940-3 Sh.2
E E
APPR.
F F
CHECK
NAME
DATE
G G
REVISION
H H
g GE
Project : 109MW Main HFO Power Plant Title : Circuit Breaker Date 16.08.13
Title : 132/11kV Trafonsformer Control & Protection Panel
Drawn RJS
Rev Sheet 80
Project - Bangladesh Manual Closing Circuit Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 81
01 02 03 04 05 06 07 08 09 10 11 12 13 14
=SD +RP1 =T1 +RP1 CB-52
APPR.
From Sh.80
CHECK
A 50/51 Sh.221 A
J1
J2
113 114
Sh.151
C 2TB4 2TB4 12 13 C
03 03 Sh.151
296
296X 04 04 195
Sh.123 RXTCS
REV.
Sh.123 A
13 14
TB4
K25
86A and 86 B Supervision shall have to be 11
15
K26 04 * TC1
covered.
12 B Pre Close Supvn.
16 05 13
D To Annunciation Ckt. D
22 23 Sh.70
21
This busbar differential From Sh.80
contacts shall have to be
27 28
50/51 Sh.221 26
J101
J102
provided as per M/s Magnus Backup Protection Unit-F650
F
requirement.
F03 TC2 Trip
E Seal In OFF 25 TS-2 TB4 X1 TC2 E
K53A K53
=Trip Coil-2 Trip 26 Post Close Supvn.
17 18 13 14
Please ensure the mentioned terminal details shall
87T Sh.211
Differential Protection Unit-T60 have to match with 132kV Breaker drawings.
(P3) Cont Op 3 TC2 TRIP P
TS-1
APPR.
Seal In OFF 3b
K53B
=Trip Coil-2 Trip 3c 17 18
F F
115 116
CHECK
Sh.150
14 15
Sh.150
115 116
Sh.151
NAME
2TB4 2TB4 14 15
Sh.151
05 05
296
296X 06 06 295
DATE
Sh.123
G RXTCS G
Sh.123 A
13 14
K55 TB4
11
15 14 *
K56 TC2
12 B Pre Close Supvn.
16 15 15
To Annunciation Ckt.
22 23 Sh.70
21
REVISION
H H
27 28
26
Drg No: GA13011-06 Drg No: 1HYB903940-3 Sh.2
g GE
Project : 109MW Main HFO Power Plant Title : CB Tripping Circuit Date 16.08.13
Title : 132/11kV Trafonsformer Control & Protection Panel
Drawn RJS
Rev Sheet 81
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 83
01 02 03 04 05 06 07 08 09 10 11 12 13 14
=T1 +RP1 CB-52
APPR.
CHECK
S1
DATE
72 71
B B
Drg No: G71AHS-DA401-W1101 Sh.2
REVISION
C C
REV.
D D
E E
APPR.
F F
CHECK
NAME
DATE
G G
REVISION
H H
g GE
Project : 109MW Main HFO Power Plant Title : CB Indication Circuit Date 16.08.13
Title : 132/11kV Trafonsformer Control & Protection Panel
Drawn RJS
Rev Sheet 83
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 90
01 02 03 04 05 06 07 08 09 10 11 12 13 14
=T1 +RP1 TRAFO MB
APPR.
From Sh.80
K101
K102
CHECK
A TB1 A
01 26
NAME
87T Sh.211
Differential Protection Relay-T60 OTI TRIP
H TB1 TB1
DATE
G G
REVISION
H H
g GE
Project : 109MW Main HFO Power Plant Title : Transformer Auxiliary Function Ckt. Date 16.08.13
Title : 132/11kV Trafonsformer Control & Protection Panel
Drawn RJS
Rev Sheet 90
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 91
01 02 03 04 05 06 07 08 09 10 11 12 13 14
=T1 +RP1 TRAFO MB
APPR.
K102
CHECK
A A
NAME
87T Sh.211
Differential Protection Realy-T60 PRD TRIP-1
H TB1 TB1
DATE
30H
F 22 21 F
CHECK
30J
12 11
30K
NAME
22 21
DATE
H H
g GE
Project : 109MW Main HFO Power Plant Title : Transformer Auxiliary Function Ckt. Date 16.08.13
Title : 132/11kV Trafonsformer Control & Protection Panel
Drawn RJS
Rev Sheet 91
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 110
01 02 03 04 05 06 07 08 09 10 11 12 13 14
FROM 132kV BUS SIDE CTMB =T1 +RP1
APPR.
87T SH.211
Differential Protection Relay-T60
P1 P1 P1
CHECK
A A
TS-1 IA5 IA
A11 A12 IA Phase-A Current
01 21 22 F1c
IA1 CT 1A SRC-1
NAME
F1b
IB5 IB
A31 A32 IB Phase-B Current
02 23 24 F2c
DATE
IB1 CT 1A SRC-1
B F2b B
IC5 IC
A51 A52 IC Phase-C Current
25 26 F3c
03
1S1 1S1 1S1 IC1 CT 1A SRC-1
CORE-1 F3b
RATIO: 300/1A
CL: PS, 15VA A71
1S2 1S2 1S2 04 27 28
REVISION
C C
IG5 IN or IG
REV.
P1 P1 P1 IG Neutral/Ground Current
F4b
Comments mentioned in single line diagram is also
11 17 18
45 MVA POWER TR.1 IG1 CT 1A SRC-1
11 / 132 KV, WITH 12 19 20 F4c
D
OLTC -10% TO +5% applicable for this 3 line diagram, please correct this D
NCT
drawings
RATIO: 300/1A accordingly.
CL:5P20, 15VA
CTMB
P2 P2 P2
E
Disconnecting type terminal with shorting links shall have to be E
provided for all CT terminals coming to protective panels.
1S2 1S2 1S2 A171 A172
CORE-1 09 7 8
Ratio :3000/1A IC5 IC
APPR.
IB5 IB
IB Phase-B Current
M2b
A131 A132
M2c IB1 CT 1A SRC-2
NAME
3 4
IA5 IA
M1b IA Phase-A Current
A111 A112
DATE
H H
g GE
Project : 109MW Main HFO Power Plant Title : Differential Unit CT/PT Circuit Date 16.08.13
Title : 132/11kV Trafonsformer Control & Protection Panel
Drawn RJS
Rev Sheet 110
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 111
01 02 03 04 05 06 07 08 09 10 11 12 13 14
=T1 +RP1
APPR.
87T SH.211
Differential Protection Unit-T60
CHECK
A A
B
K101 HI+
5b Control Power
NAME
LO+
110V DC Supply 6b
From Sh.40 K102 -
6a
Surge
8a
Filter
8b
DATE
To Sh.80
B B
REVISION
C C
REV.
D D
E E
APPR.
F F
CHECK
NAME
DATE
G G
REVISION
H H
g GE
Project : 109MW Main HFO Power Plant Title : Differential Unit DC Circuit Date 16.08.13
Title : 132/11kV Trafonsformer Control & Protection Panel
Drawn RJS
Rev Sheet 111
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 120
01 02 03 04 05 06 07 08 09 10 11 12 13 14
CTMB =T1 +RP1
APPR.
A A
P1 P1 P1 TS2 IA
TB3 B
C12 Phase-A Current
IA
1
NAME
21 22
IA CT 1A
2
IB
C32
DATE
IB Phase-B Current
23 24 3
B B
IB1 CT 1A
4
IC
CORE-2 2S1 2S1 2S1 C52
IC Phase-C Current
RATIO: 300/1A 25 26 5
CL: 5P10, 15VA IC1 CT 1A
C72 6
2S2 2S2 2S2 27 28 IN or IG
REVISION
IG Neutral/Ground Current
10
C IG1 CT 1A C
9
P2 P2 P2
TO 11kV BUS SIDE
REV.
D D
E E
APPR.
F F
CHECK
NAME
DATE
G G
REVISION
H H
g GE
Title : 132/11kV Trafonsformer Control & Protection Panel Project : 109MW Main HFO Power Plant Title : Backup Protection Unit Date 16.08.13 Rev Sheet 120
Drawn RJS
Project - Bangladesh CT/PTCircuit Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 121
01 02 03 04 05 06 07 08 09 10 11 12 13 14
=T1 +RP1
APPR.
50/51 SH.221
Backup Protection unit-F650
CHECK
A A
H
K201 +
110V DC Supply 10
NAME
B B
To Sh.151
REVISION
C C
Protective functions shall have to be revised as per
earlrier comments.
REV.
D D
E E
APPR.
F F
CHECK
NAME
DATE
G G
REVISION
H H
g GE
Title : 132/11kV Trafonsformer Control & Protection Panel Project : 109MW Main HFO Power Plant Title : Backup Protection Unit DC Circuit Date 16.08.13 Rev Sheet 121
Drawn RJS
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 150
01 02 03 04 05 06 07 08 09 10 11 12 13 14
APPR.
=T1 +RP1
CHECK
A A
NAME
86AX
87T Sh.211
Differential Protection Unit-T60
(P1) Cont Op 1 Protn. Trip P
DATE
1b 86A
Seal In OFF
B B
=PROTECTION TRIP 1c
86RST
REVISION
16 26
C C
30A
REV.
30B
D D
30C
30D
86B
30E
E E
30F
11kV Panel
86A and 86 B shall have to be utilized for all major trips, 86AX/ 86BX shall
have to be utilized only for remote indications/ annunciations.
APPR.
86B
F F
86A and 86B shall have to be provided with 2NO +2NC Spare contacts shall
CHECK
have to be provided for purchaser use other than the contacts used for
Control and relay panels.
NAME
DATE
G G
REVISION
H H
g GE
Title : 132/11kV Trafonsformer Control & Protection Panel Project : 109MW Main HFO Power Plant Title : 86A Trip Relay Circuit Date 16.08.13 Rev Sheet 150
Drawn RJS
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 151
01 02 03 04 05 06 07 08 09 10 11 12 13 14
APPR.
=T1 +RP1
CHECK
A A
NAME
Seal In OFF 21
B B
=PROTECTION TRIP 19
86RST
REVISION
18 28
C C
REV.
30A
30B
D D
30C
30D
30E
E E
30F
APPR.
F F
CHECK
NAME
DATE
G G
REVISION
H H
g GE
Title : 132/11kV Trafonsformer Control & Protection Panel Project : 109MW Main HFO Power Plant Title : 86B Trip Relay Circuit Date 16.08.13 Rev Sheet 151
Drawn RJS
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 152
01 02 03 04 05 06 07 08 09 10 11 12 13 14
APPR.
A 87T Sh.211 A
Differential Protection Unit-T60
(P5) Cont Op 5 LV Protn. Trip P 1K101 TB7
5b 11kV CB TC-1
NAME
6b 11kV CB TC-2
Seal In OFF 1K251 08
B Tripping Ckt. B
=LV PROTECTION TRIP 6c 09
REVISION
C C
REV.
D D
E E
APPR.
F F
CHECK
NAME
DATE
G G
REVISION
H H
g GE
Title : 132/11kV Trafonsformer Control & Protection Panel Project : 109MW Main HFO Power Plant Title : LV Tripping Circuit Date 16.08.13 Rev Sheet 152
Drawn RJS
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 210
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Differential Protection Unit-T60-J03-HKH-F8L-H6D-M8N-P67-UXX-WXX
APPR.
7 H -H4a Buchholz Relay Trip /Sh.90 7 P -P7 Over Flux Protection Trip /Sh.71
Input Ref
B 8 H -H4c OLTC Surge Relay Trip /Sh.90 8 P -P8 Over Flux Protection Alarm /Sh.71 B
1 M -M1
Line CT 9 H -H5a PRD Trip-1 /Sh.91
2 M -M2 /Sh.110
10 H -H5c OLTC Pressure Relief Valve Trip /Sh.91
3 M -M3
11 H -H6a Oil Temp.Indicator Alarm /Sh.91
4 M -M4 Spare
12 H -H6c Wdg. Temp. Indicator Alarm /Sh.91 Monitoring Functions
PT Input 13 H -H7a Buchholz Relay Alarm /Sh.91 IEC Code Assignment
Contact Slot Ref Assignment Sheet 14 H -H7c Magnetic Oil Level Gauge Alarm /Sh.91
Input Ref 15 H -H8a Spare /Sh.250 27 VT Fuse Fail
REVISION
D D
Test switches shall have to provide the the following,
CT Shorting facility
Trip Isolation facility
E Extension of DC circuit E
Feeding external current or voltage facility.
And test switches shall be preferably M/s GE Make, when GE Make relays used.
APPR.
F F
CHECK
NAME
DATE
G G
REVISION
H H
g GE
Title : 132/11kV Trafonsformer Control & Protection Panel Project : 109MW Main HFO Power Plant Title : Differential Protection Circuit Date 16.08.13 Rev Sheet 210
Drawn RJS
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 211
01 02 03 04 05 06 07 08 09 10 11 12 13 14
=T1 +RP1
APPR.
87T
Differential Protection Unit-T60
CHECK
To Sh.110 SH.110
IA1 CT 1A SRC-1 IA1 CT 1A SRC-2
F1c M1c (H1c) Cont Ip 2 CB-52 Open (P2) Cont Op 2 TC1 Trip
IB5 IB IB5 IB 1c 2b
2.0ms 166VDC Seal In OFF
CB-52 OPEN =TRIP COIL - 1 TRIP 2c
DATE
F6b M6a
Phase Voltage Phase Voltage
VB VB Winding Temperature Indicator Trip /Sh.90 =Spare 6c
F6c PT 63.5VAC SRC-1 M6c PT 63.5VAC SRC-2
VC VCG VC VCG
F7b M7a (H4a) Cont Ip 7 BUCHHOLZ TRIP (P7) Cont Op 7 24 TRIP
Phase Voltage Phase Voltage 4a 7b
VC VC 2.0ms 166VDC Seal In OFF
F7c PT 63.5VAC SRC-1 M7c PT 63.5VAC SRC-2
D Buchholz Trip OVER FLUX PROTECTION TRIP 7c D
V aux V aux /Sh.90 /Sh.71
VX VX
F8b Auxiliary voltage M8a Auxiliary voltage
VX VX (H4c) Cont Ip 8 OLTC SR TRIP (P8) Cont Op 8 24 ALARM
F8c PT 63.5VAC SRC-1 M8c PT 63.5VAC SRC-2
2.0ms 166VDC 4c Seal In OFF 8b
OLTC Surge Relay Trip /Sh.90 OVER FLUX PROTECTION ALARM /Sh.71 8c
B
1b
1a Critical failure (H5a) Cont Ip 9 PRD TRIP-1 H
2.0ms 166VDC 5a
2b
E 3a 48v dc out put
Pressure Relief Device Trip-1 /Sh.91 5b E
3b
HI+ (H5c) Cont Ip 10 OLTC PRV TRIP
5b Control power
6b
LO+
2.0ms 166VDC 5c
6a OLTC Pressure Relief Valve Trip
Surge /Sh.91
8a
Filter
8b (H6a) Cont Ip 11 OTI ALARM
2.0ms 166VDC 6a
APPR.
2.0ms 166VDC 6c
Wdg. Temp. Indicator Alarm /Sh.91
(H7a) Cont Ip 13 BUCHH ALARM
NAME
2.0ms 166VDC 7a
Buchholz Alarm /Sh.91 7b
(H7c) Cont Ip 14 MOG ALARM
DATE
G 7c G
2.0ms 166VDC
Magnetic Oil Level Gauge-A Alarm /Sh.91
(H8a) Cont Ip 15 Spare
2.0ms 166VDC 8a
SPARE /Sh.250
(H8c) Cont Ip 16 Spare
2.0ms 166VDC 8c
REVISION
H H
SPARE
g GE
Title : 132/11kV Trafonsformer Control & Protection Panel Project : 109MW Main HFO Power Plant Title : Differential Protection Circuit Date 16.08.13 Rev Sheet 211
Drawn RJS
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 220
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Backup Protection Unit - F650-B-F-B-F-1-G-0-HI-6E
APPR.
9 F -CC9 Spare
B B
PT Input 10 F -CC10 Spare
Voltage Slot Ref Assignment Sheet 11 F -CC11 Spare
Input Ref 12 F -CC12 Spare
1 A -A5 13 F -CC13 Spare
-A6 14 F -CC14 Spare
2 -A7 15 F -CC15 Spare
Spare
-A8 16 F -CC16 Spare
3 -A9 17 G -CC1 Spare
REVISION
25 G -CC9 Spare
26 G -CC10 Spare
27 G -CC11 Spare
28 G -CC12 Spare
29 G -CC13 Spare
D 30 G -CC14 Spare D
31 G -CC15 Spare
32 G -CC16 Spare
E E
APPR.
F F
CHECK
NAME
DATE
G G
REVISION
H H
g GE
Title : 132/11kV Trafonsformer Control & Protection Panel Project : 109MW Main HFO Power Plant Title : Backup Protection Unit Date 16.08.13 Rev Sheet 220
Drawn RJS
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 221
01 02 03 04 05 06 07 08 09 10 11 12 13 14
=T1 +RP1
APPR.
50/51
Backup Protection unit-F650
CHECK
A A
F
F-CC1 F F01 Protn. Trip
21
IA =Spare 01 Seal In OFF
20
B =PROTECTION TRIP
Phase-A Current /Sh.151 19
NAME
1
IA
IA CT 1A F-CC2 F02 TC1 Trip
2 24
=Spare 02 Seal In OFF
IB 23
=TC1 TRIP
DATE
/Sh.81 22
3
IB Phase-B Current
B To B
F-CC3 F03 TC2 Trip
Sh.120 CT 1A
4 IB1 03 25
=Spare Seal In OFF
IC =TC2 TRIP 26
/Sh.81
5
IC Phase-C Current
F-CC4 F04 Backup Protn.Optd.
IC1 CT 1A 04 27
6 =Spare Seal In OFF
IN or IG =BACKUP PROTECTION OPTD. /Sh.70 28
REVISION
VA VAG
5 Phase Voltage SPARE 32
VA PT 63.5VAC
6
F-CC7 F07 Spare
VB VBG
7 07 33
Phase Voltage =Spare Seal In OFF
D VB PT 63.5VAC SPARE 34 D
8
VC VCG
9 Phase Voltage F-CC8 F08 Spare
VC 08 35
PT 63.5VAC =Spare -Ve Seal In OFF
10
V aux 09 SPARE 36
VX /Sh.250
11 Aux Voltage
12
VX PT 63.5VAC F-CC9
=Spare 11
E H
E
13 F-CC10
To POWER SUPPLY OK 12
14 =Spare
Sh.71
15
+Ve
To +
10
Sh.121 CONTROL POWER F-CC11
-Ve -
18 =Spare 13
APPR.
F F-CC12 F
14
CHECK
=Spare
F-CC13
NAME
=Spare 15
F-CC14
DATE
16
G =Spare G
F-CC15
=Spare 17
F-CC16
=Spare 18
-Ve
H 10 H
REVISION g GE
Project : 109MW Main HFO Power Plant Title : Backup Protection Unit Date 16.08.13
Title : 132/11kV Trafonsformer Control & Protection Panel Rev
Drawn RJS Sheet 221
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet 250
01 02 03 04 05 06 07 08 09 10 11 12 13 14
=T1 +RP1
APPR.
A A
(H8a) Cont Ip 15 Spare H
NAME
B B
50/51 Sh.221
Backup Protection Unit-F650
F08 Spare F
REVISION
35
Seal In OFF
C =SPARE 36 C
REV.
D D
SH.150
E SH.151 E
APPR.
F F
CHECK
NAME
DATE
G G
REVISION
H H
g GE
Title : 132/11kV Trafonsformer Control & Protection Panel Project : 109MW Main HFO Power Plant Title : Spare Contact Details Date 16.08.13 Rev Sheet 250
Drawn RJS
Project - Bangladesh Checked
Approved
DCS
MVG Digital Energy Drg.No GA13011-03 00 Next Sheet Nil