Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Franz Heuken
100th anniversary
in September 2006
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Table of content
Pages Designation
• 01 Cover sheet
• 03 Table of content
• 04 - 08 Introduction
• 09 - 18 Loesche mill LM 56.3+3 C/S +Classifier LSKS 87 CS r
• 19 Loesche Mill
• 20 - 23 Table
• 24 - 27 Grinding roller
• 28 - 29 Rocker arm
• 30 - 57 Spring system HSLM
• 58 - 62 Supporting Rollers and HSSW
• 63 - 66 Roller lubrication HSMS
• 67 - 73 Water-and Grinding Aid Sprinkling
• 74 - 80 Seal air system
• 81 - 84 Flow sheets
• 85 - 91 List of electrical consumer and Instrumentation list
( sections )
• 92 - 94 Start and stop sequence
• 95 -103 Control loops
• 104-105 Wear Parts
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Raw Material
Country: United Arabic Emirates
District: Ras Al Khaimah
Client: Union Cement Company
Climate: Continental/Dry
Temperature: 5°C average 33°C + max 44°C
Atmopheric huminity: max 90% H2O
Height above sea level: ~31 m
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Principle of
Loesche Grinding Mill
LM 56.3+3 C/S
with
LSKS 87 C/S
Classifier
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Group Classifier LSKS
Classifier Drive
Rotor
Classifier Housing
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Lining cpl.
Machine/Assembly Group:
Swinging-Out Device
Mill-Drive cpl.
Spring Assembly cpl.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Table
Grinding
roller
Louver
ring
Dam ring
Clamp ring
scraper
Grinding plate
segments
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Table
Function
The assembly "Table cpl." consists basically of:
- the table foundation,
- the segmented grinding plate as wear resistant lining,
- the clamping ring consisting of several parts,
- the dam ring,
- the louvre ring and
- the scrapers.
The primary function of the table is to support the grinding bed and transmit the force
generated by the rollers into the gearbox below. It also transmits the torque of the
gearbox into the grinding zone. Together with the ring duct (mill lower housing cpl.) the
table creates a circular chamber out of which the primary gas flows over the louvre ring
into the grinding chamber.
As one of the two grinding tools of the mill - the second tool are the rollers - the table is
of such importance in view of the various spare part.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Table
Armour Ring
Roller
Damring
Grindingbed
Grinding table
wear segment
Grinding table
Louver Ring
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Table
Dam Ring
The dam ring is bolted onto the outer collar of the grinding table body from above. The dam ring
height determines the required thickness of the layer of grinding material on the table which is
normally referred to as the grinding bed.
As a deep grinding bed leads to a higher energy consumption of the mill without increasing the
grinding effect correspondingly, the dam ring should be kept as low as possible. At the same time,
however, it must be considered that with a low dam ring less material will be held on the table so
that the material thrown off by the centrifugal force will increase the load on the louvre ring.
The various qualities of the feed material such as grindability factor, feed size and feed moisture
content demand in many cases a height adjustment of the dam ring when commissioning. The
dam rings equipped with flat steel wear ring inserts, the entire wear ring can be replaced.
For faultless mill operation it is important that the rollers run as near as possible to the wear ring in
the dam ring.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Grinding roller
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Grinding roller
Quantity and Arrangement
The mill is equipped with several rollers, each of which is clamped in its own rocker arm. The
rollers are equidistantly spaced relative to each other and are supported in the zero position at a
low roller axis inclination to the horizontal grinding plate.
Construction
Each roller consists in essence of the rotating hub, cover disc, rolling bearings, bearing sealings,
roller axle, roller tire as wearing part, hub cover, sealing sleeve and lubrication system.
Lubrication
The rolling bearings are usually lubricated by an oil-recirculating system powered by the pumps of
the hydraulic cabinet HSMS. A radial drillhole in the centre of the roller hub guarantees a constant
minimal oil level within the roller.
Adjusting of Rollers
The position of each roller relative to the table (distance to the dam ring) can be changed by
means of a ring. This ring is inserted between the conical sleeve of the rocker arm and the
relevant axle shoulder. The ring should not always be fitted but only when the roller contacts the
inner diameter of the dam ring (see drawing).
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Sealings
Each roller has a number of different sealings.
The annular gap gas-flushed seal prevents dust from the grinding space contaminating the roller
bearings.
(See operating instructions "Sealing Air Pipe cpl.")
The roller bearing chamber is at atmospheric pressure because it is connected with the exterior of
the mill by a bore in the roller axle. This bore is equipped with an oil-wetted air filter. Because the
pressure within the roller is higher than that of the mill interior no dust can get into the bearings.
The rolling bearings space is protected by mechanical sealings from the dust-loaded atmosphere
in the mill as follows:
- An O-ring seals the hub cover relative to the hub.
- The sealing sleeve is screwed to the hub with the use of a sealing paste.
- The rotating parts of the roller are sealed relative to the stationary axle with a system of
slip-ring sealings:
(see operating instructions "Slipring Sealing cpl.")
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
When they are new, the two rings sliding on one another are lapped. Under elastic load
they do not let any lubricant through.
It is not the task of the slip-ring sealing to keep dust away from the roller bearings. This is
rather the task of the sealing air system (see operating instructions "Sealing Air System").
Extreme fouling in the roller bearing chamber consisting of grinding material always shows
inadequate functioning of the sealing air system.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant Rocker arm
Roller bore
Rocker arm
axle
Fork
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Rocker arm
Function
The rocker arm has the task of transmitting the force produced by the hydraulic double acting
cylinder(s) of the assembly "Spring Assembly cpl." onto the roller and the grinding bed. The
force is thereby led from a jointed pin for the spring rod(s) in the lower part of the fork via the
split sleeve / pin joints into the hubs, the central rocker arm and the rollers. The torque arms
for transmitting these forces (distance between swivel pin in the fork and the rocker arm
bearing / rocker arm bearing to the centre point of the roller) are so dimensioned that the
bearing reaction forces are always directed into the pedestal.
The separation of the central rocker arm and the fork allows to keep the fork and cylinder of
the springing device in position during the swinging-out process of the rocker arm/roller unit.
Dismounting of these components is not necessary.
The internal sealing system between the roller and rocker arm is protected against the ingress
of dust by an air seal. The air is fed to a coaxial gap between the roller and the rocker arm via
a bore in the middle of the rocker arm.
The sealing between the rocker arm and the mill body is achieved via the sealing box with its
vertical sides and rounded upper and lower surfaces. The rounded surfaces rotate
concentrically about the rocker arm axle (see "Rocker Arm Sealing cpl.).
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
PRINCIPLE LAYOUT
HYDROPNEUMATIC SPRING
SYSTEM
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Group Spring Assembly cpl.
Adjustment of the proximity limit switches on the rocker arms as shown in drawing "Rocker Arm
Monitoring, complete" (see mill parts list). These proximity switches are provided on each rocker arm.
Checking of the positioning of hand-operated valves within the hydraulic system according to drawing
"Hydraulic Scheme HSLM ..."
Electrical monitoring and interlocking systems are to checked according to the Electrical
Documentation.
The hydraulic system has to be bled frequently until all the entrained gas has been removed
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
OPERATING
PRESSURE
N2
SOLENOID VALVE
COUNTER
PRESSURE
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant SCHEME: HYDRAULIC HSLM
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant HSLM Cabinet
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Piston Accumulator Bladder Accumulator
Gas Valve
N2 Piston
Piston Packing
Oil
Shell
Oil
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Function
During mill operation the rollers are raised by the material to be ground on the table, as a function of layer
thickness. The rocker arm rotates slightly and the pistons of the hydraulic cylinder move up, forcing the oil
on the piston rod side out of the cylinder chamber through hoses and piping into the hydraulic bladder
accumulators. The oil flowing into the accumulator flasks compresses the nitrogen-filled accumulator
bladder. The non-homogeneity of the grinding bed sets up vertical movement in the rollers, as when a car
wheel runs along a rough road. If the rollers run into a "grinding bed trough", the accumulator bladder
expands and pushes a corresponding amount of oil from the accumulator housing back into the cylinder.
This means that there is a continual exchange of oil between cylinder and accumulator, with a very rapid
response. In a similar manner the piston accumulators are connected with the piston chamber side of the
hydraulic cylinder.
The hydraulic cylinders of opposite rollers are interconnected on the oil side so that the rollers will exert the
same force on the grinding bed irrespective of their deflection thus ensuring a uniform loading of the thrust
bearing in the mill gearbox.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
For starting and stopping the mill, it is possible to lift the rollers hydraulically off the grinding bed. This
is effected by directing the oil of the pump from the piston rod side to the piston side chamber of the
hydraulic cylinder. Owing to the different resistances in the hydraulic system, the rollers are not lifted
simultaneously but one after another. The roller movements upwards are mechanically limited. As soon
as all rollers have reached their top limit position, this state is electrically signalled.
With the rollers lifted it is possible to start a mill when filled. When starting a filled mill, the mill motor is
loaded to appr. 40 % of the operational torque. Upon lowering the rollers, the remaining grinding stock
on the table is then ground quickly. The lowering of the rollers occurs with a time delay with respect to
the feeder. This increases the grinding bed depth slowly and the motor torque rises correspondingly to
100 %. With this mode of operation the full load condition will be attained after about 30 seconds.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Group Spring Assembly cpl.
b) Increase (Raising) of Operating Pressure
The required operating pressure and the control characteristics can be pre-selected within the PLC.
During mill operation the pump unit will automatically run until the chosen value is attained. The oil
from the pump is led through a throttle in order to reduce troublesome pressure surges within the system.
ELECTRIC MOTOR
FROM TANK
7.11
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
The required operating pressure and the control characteristics can be pre-selected within the PLC. Solenoid
valve (7.2) will be opened automatically during mill operation so that the oil may return to the tank. The
returning oil is led through a throttle (18.2) to control the rate at which the pressure decreases. The solenoid
valve (7.2) is closed as soon as the lower pressure has been attained.
Please check on the basis of the Spring Diagram whether the ratio between the N2-charging pressure and the
hydraulic operating pressure is still within the admissible tolerance.
Valve 7.2
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Group Spring Assembly cpl.
The required pressure and control characteristics can be pre-selected via the PLC. Solenoid valve (7.10)
opens and oil flows from the operating system to the counter pressure system. The oil is led through a
throttle (18.10) to control the rate at which the pressure increases in the system. The valve shuts as soon
as the higher counter pressure has been attained.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
The required pressure and control characteristics can be pre-selected within the PLC. Solenoid valve
(7.5) opens and allows oil to flow back to the tank. The oil is led through a throttle (18.1) to control the
rate at which the pressure decreases. The valve closed as soon as the lower pressure has been attained.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Attention: For safety reasons no persons shall be allowed to stay within range of the movable
components of milling force transmission system unless additional mechanical safety precautions (e.g.
distance pieces between roller and table) will prevent any accidental movement of the rollers.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
If the entire hydraulic system has to be relieved to atmospheric pressure, e.g. in case of charging pressure
measurement with the accumulators or in case of maintenance work, the system must switched from
"Remote" to "Local" mode.
In this mode, the control system will be inoperative.
Upon opening of the ball valves 5.5 and 5.2 by manual operation, the oil will return to the tank.
Attention: For safety reasons no persons shall be allowed to stay within range of the movable
components of milling force transmission system unless additional mechanical safety precautions (e.g.
distance pieces between roller and table) will prevent any accidental movement of the rollers.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
When valve 7.1 is in its neutral position and the pump is started, the tank contents are (in addition to the
main filtration) circulated over the filter at certain time intervals.
The operational demands of the machine have priority over those of the parallel flow filter system.
Pump 2.20
Valve 7.22
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Spring Characteristics
General
The hydro pneumatic spring system with the HSLM hydraulic cabinet permits the roller force to be
adapted to the material to be ground and to keep the grinding bed thickness constant within close
tolerances.
It consists of two separate systems, the so-called operating system which provides pressure to the rod-
side of the cylinder and the counter pressure system which supplies pressure to the piston side. The
control system is controlled according to the mill feed rate.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
General
The spring characteristic line, i.e. the spring stiffness, can be selected upon the rod side by adjusting the
ratio of the hydraulic operating pressure p2 to the N2-charging pressure of the accumulator bladder p1
and, without variation of the N2-pressure, the spring stiffness can even be varied during operation of the
mill. The "Diagram: Roller Spring Stiffness" indicates the limits which have to be observed.
Operation
In the "Diagram: Roller Spring Stiffness" the roller stiffness cwf (= spring stiffness related to the roller) is
plotted against the nitrogen-charging-bladder pressure p1. The parameters are the various hydraulic
operating pressures p2 and the roller forces FW, respectively.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Group Spring Assembly cpl.
c wf
Spring
of the Roller
[kN/mm]
Operating Range
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Group Spring Assembly cpl.
1) Selection of operating pressure p2 (with reference to "Diagram: Roller Load" (see
documentation parts list "HSLM")).
3) Follow the vertical axis of the accumulator charging pressure p1 until it intersects the
operating pressure curve p2 .
4) From the intersection follow the horizontal axis left to read the corresponding spring
stiffness (cwf) of the roller.
The roller stiffness value is a measure of the amount by which the roller force increases for a roller
deflection of 1 mm (0.04 in).
The smaller the difference between p2 and p1, the softer the spring. This means that with a soft spring, the
force increase is low when deflecting the roller. The max. p1 value of the N2-charging in the accumulator
must not exceed 80 % of the operating pressure p2, as otherwise the rubber bladder could be destroyed.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Emergency Stop
In case of an Emergency Stop or a power supply failure the rollers will remain in contact with the material
to be ground. Braking of the table will take one revolution maximum.
Local Operation
For maintenance work the system must be switched to "Local Operation" in the control room. The remote
control system is then inoperative.
The rollers can be operated by the local push buttons.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Supporting Rollers
The S-roller tire is a wear-resistant casting. The non-profiled surface has a working width corresponding
to that of the master roller.
The mill is equipped with 3 S-rollers, where each of it is opposite of a master roller.
The S-roller is no grinding roller but a preparation roller. It serves the purpose of pre-compacting
the aerated and non-homogenous grinding bed composed of grinding stock charged and recirculated
grinding stock, i.e. of preparing the grinding bed for the downstream grinding roller.
It is for this reason that the working plane of S-roller is substantially higher than that of the M-roller. The
position of S-roller above the table may be selected in two ways:
- by adjustment of the S-buffer spindle in that the S-roller rocker arm complete with the S-roller is
mechanically adjusted to a desired height
- by means of the S-roller hydraulics by way of positioning via a hydraulic cylinder which is the
more common way
- S-roller are serving either in position controlled mode
or in speed controlled mode
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant Group roller lubrication HSMS
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Function
Purpose of the HSMS system is to grease the roller bearing, return the oil back to the tank, clean and
cool the oil.
Each roller has two pumps. One compression pump and one depression pump.
The adjusting of the the oil amount will be done during commissioning and is depending from the
length of the oil pipline and the oil temperature.
After start the mill the roller lubrication system starts app. 20 min later in order to heat up the oil in the
roller. The oil temperature in the oil tank kept constant by means of heat elements which are controlled
by thermostat. The adjusted Temperature should be app. 60 °C.
Further information please refer BA 911158-01-4 en in the Dokumentation Folder OM-01 HSMS
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Group water- and grinding aid sprinkling
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Group water- and grinding aid sprinkling
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Solenoid valve
Filter
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
flow meter
water tank
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
General
The grinding plant is equipped with a water and grinding aid system to stabilize the material bed for an
optimum of grinding effect as well as to ensure the flow ability of the cement
Function
The group "Water Injection cpl." consists of the pumping unit and the piping on the mill including the
injector nozzles, control and mounting elements.
The piping connected to the pumping unit is divided into three feed lines. Each feed line is connected with
one water lance, having holes respectively nozzles for sprinkling the water onto the material bed.
At the inlet of the water lances a compressed air piping is connected. By means of a solenoid valve
compressed air will clean the water lances from remaining water in order to avoid material caking at the
water lances it self.
Each time the water pump/grinding aid pump unit is stopped, compressed air is cleaning the water lances for
about 5 minutes.
Pressure transmitter are installed in order to monitor the water sprinkling through the nozzles.
In case the pressure comes below the min. limit, the water pump has to stop as by this time water will come
into the mill uncontrolled, e.g. worn out lances or nozzles
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
General
As grinding aid we are using DEG, Diethylenglycole.
The most important negative effect during grinding is the agglomeration of particles which can be described
by the adhesion of separate individual particles. Furhtermore, this process can result in the formation of
coatings which than can result in a reduction of grinding efficiency.
Due to such a possible agglomeration the internal material circulation might increase as these particles are
more heavy and bigger, not reaching the classifier or might be rejected by the classifier.
The task of grinding aid is to encounter these negative effects and to assist the grinding action as well as
improves the flow characteristics of the ground cement
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Sealairairsystem
Seal system
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Seal air system
To avoid damage
occasioned by
ingress of dust
from the grinding
chamber into the
roller bearings
and the slip-ring
sealing of the
roller, the small
annular gap (circa
1 to 2 mm)
between the
rotating neck of
the roller and the
cast ring of the
stationary rocker
arm is pressurized
with sealing air.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant Seal air system
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant Seal air system
Seal air
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
To avoid damage occasioned by the ingress of dust from the grinding chamber into the roller
bearing and the slip ring sealing of the M- and S-roller, a small annular gap between the rotating
interior ring of the rollers and the wear ring of the stationary M-andS-rocker arm, which surrounds
the neck of the roller, is pressurized with sealing air.
The sealing air feed, provided by a seal air fan, is arranged according to the type of mill through a
hole, positioned in the top respectively at the axel of the rocker and via the interior of the lever to
the sealing air chamber, from which the air streams out over the annular gap into the interior of
the mill.
The speed at which the air is drawn or blown through the sealing air gap into the grinding
chamber is the most important aspect of the system. Should the gap become worn then the rings
on both the rocker arm and the roller must be exchanged.
A monitoring system is provided in order to monitor the actual pressure of the seal air system at
the inlet of each single M-and S-roller.
In case the pressure drops below the limit, an alarm will indicate the need of check.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Control loop: Mill air volume flow
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
The volume rate of flow of gas through a mill per unit time influences the grinding, classifying and
dedusting process in a grinding plant and for this reason must be held constant.
The volume rate of flow per unit time depends on the design and capacity of grinding plant
In general:
During the normal grinding operation, the volume rate of flow must be held constant according to the design
criteria independent of pressure and temperature fluctuations in the system.
The volume rate of flow in a grinding plant is deter mind by a venturi pipe or an orifice plate situated after
the pre-selection or dedusting system accordingly. Certain plants, because of their general arrangement,
prehibit such measurement. An alternative to this would be summing two separate measurements made in
the exhaust stack and recirculation duct.
The differential pressure measurement taken from the venturi or the orifice plate is transformed into the
standard 4-20 mA signal proportional to the flow and is required for the control loop. This signal must be
damped electronically and will be set accordingly during the commissioning.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
The mill air volume flow control loop is only active during grinding operation
Manual control is also possible.
Certain process situations may arise whereby the regulation unit is not in a position to retrieve the set
point. For this reason limit monitors are installed for alarm purposes and to take the necessary steps in
the process control logic to ensure the plant equipment is protected accordingly.
Limit values
MIN 1 at app. 75 % of rated flow warning
MIN 2 at app. 70 % of rated flow switch off or switch over the grinding plant
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Control loops (Mill outlet temperature)
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Limit values
MIN Not enough heat is available and the grinding process can no longer be
guaranteed. If the heat source to the mill is already at maximum, the material
feed to the mill must be reduced.
MAX 1 Warning
MAX 2 Hot gas supply –OFF and the stopping or switch over sequence is initiated.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
1) A control valve with solenoid valves and nozzle arrangement in a water injection system to the mill
2) A burner of an air heater
3) A damper in the cold air duct
4) A damper in the hot gas duct (Influence the heat flow)
5) A speed controlled booster fan
6) A control valve with solenoid valve and nozzle arrangement at the cooling tower.
7) A combination of the above mentioned arrangements is possible.
The control system is only operative while the mill is running. Manual control is also possible.
Certain process situations may arise whereby the regulation unit is not in a position to retrieve the set
point. For this reason limit monitors are installed for alarm purposes and to take the necessary steps in
the process control logic to ensure the plant equipment is protected accordingly.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Control loops (Mill inlet pressure)
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
The criterion that a medium flows between two points in a system is that a differential pressure exists.
The static pressure at the mill inlet as opposed to atmospheric pressure is a point for developing a
pressure difference to a previous system.
The mill inlet pressure depends on the air volume rate of flow in the plant, developed by the mill fan. For
this reason the mill inlet vacuum pressure is responsible for drawing process gases into the system.
For grinding plants which operate in compound with clinker producing plants, the mill inlet region is the
interface between grinding plant and kiln.
The difference in pressure between the mill inlet and the kiln outlet ensures that the kiln waste gases are
drawn in for the dry grinding process.
In plants where the kiln waste gas volume flow is too low that the grinding plant has to be run with
recirculation gases, the mill inlet pressure is decisive for guaranteeing the flow of recirculated gases.
Depending on operating conditions this recirculating gas may be supplement with fresh air.
In central grinding plants the mill inlet pressure influences the supply of gas from either of the following:
1) hot gas generator
2) fresh air supply
3) Recirculation gas supply
4) combination of the above (depending on the plant design)
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Control loops (Mill inlet pressure)
In all of above mentioned systems the mill inlet pressure is a vacuum pressure.
The mill inlet pressure is maintained constant.
Certain situations may arise wherby the regulation unit is not in a position to retrieve the set point. For
this reason limit monitors are installed for alarm purposes. It is not normal to take any action in the
process control logic.
Limit values
MIN 1 warning MAX 1 warning
MIN 2 alarm MAX 2 Alarm
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
The wear rate is mainly responsible for the through put of the mill. If the grinding parts are worn
out, the capacity of the mill will reduced and the product quality degrade.
It is strictly recommended to use only original spare tires and table liners because only the
original parts respects the grinding profiles.
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
Grinding roller wear parts
1,8
1,6 MIN MAX
Ni hard 4 0,5 0,4 0,9
1,4
Cromadur 1 0 1
1,2 Cromafer 1,3 0,4 1,7
1,0
Life Time Multiplier 0,8
0,6
0,4
0,2
0,0
Ni hard 4 Cromadur Cromafer
Material Quality
Loesche GmbH Hansaaallee 243 D-40549 Düsseldorf phon +49 211 5353 0 www.loesche.com e-mail loesche@loesche.de
Operation description for LM56.3+3 C/S with LSKS 87 CS / UCC
(UAE) P.S.C. Ras Al Khaimah Cement Plant
End