BILL OF QUANTITY

Projet: MASONARY RETAINING WALL


1 Construction Works
1.1 Works for complete or part construction and civil engineering works
1.1.1 Building construction works
1.1.1.1 Civil Works
Unit Rate
Item No. Description unit Quantity Total Amount Remarks
in figures in words
Site clearance work including collection of all
construction debris, water, removal of bushes,
1 job 75.00
tree and disposal to the designated place as
directed by Engineer.
2 EARTH WORKS IN CUTTING & FILLING
E/W in Excavation in all types of soils in
foundation including 15 m hauling distance &
2.1 cum. 308.84
1.5m lift all complete work as per specification
and instruction of site engineer.
Earthwork in Filling in floor and foundation with
proper ramming with iron rammers in 0.15m.
2.2 layers after sprinkling with water and cum. 92.65
consolidating to as per specification and
instruction complete work.
3 MASONARY WORKS
Provinding and Laying 5" stone Soling in
foundation and floor with stones of approved size
3.1 cum. 32.58
and quality to level and line and compaction all
complete work as per site instruction of Engineer.

Name of Contractor: Stamp Name of Authorized Person and Signature


BOQ_CIVIL-Page 2 of 2

Providing & laying stone masonary in 1:4 C/S


mortar in superstructure in perfect line level
3.2 finish including wetting the bricks, racking the
cu.m. 429.88
joints and curing the work for at least 7 days as
per specification, drawings & instructions of the
site engineer all complete.
4 CONCRETING WORKS
Providing and Laying Plain Cement Concrete (
P.C.C.) in 1:2:4 in foundation with cement, sand
4.1 and aggregate including mixing, laying, finishing
Cum. 16.29
to approved level, line and dimensions and curing
all complete as per specification and instruction
of site Engineer.
5 PIPEWORKS & GEOFILTER WORKS
supplying and fixing pvc pipe 100mm diameter
5.1 1215.00
@ 1500mm in length and 450mm in height
Suplying and binding geoexttile filter material to
5.2 bind the piupe in perfect shape in perfect linelevel 1500.00
as specified by site engineer

Total for Civil Works