Professional Documents
Culture Documents
Rub 170
Rub 170
Rub 170
ROW
ROW ROW
ROW
This drawing is the property of SOJITZ-L&T CONSORTIUM and must not be passed on to any person or body not
ROW
authorised by SOJITZ-L&T in writing to receive it nor be copied or otherwise made use either in full or in part by such
ROW
ROW
ROW
person or body without our prior permission in writing.
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
1. ALL DIMENSIONS ARE IN MILLIMETERS.
ROW
ROW
ROW
ROW
2. DRAWING HAS BEEN PREPARED WITH REFERENCE OF RUB DRAWING NO.
ROW
ROW
ROW
14/UB/FBD/0170/0101/CD/0.
ROW
ROW
H H
ROW
3. PCC TOE WALL (M20) WITH THICKNESS 0.3M AND HEIGHT 0.75M BETWEEN STAY OF
ROW
ROW
HEIGHT GAUGE & TOE/RETAINING WALL OF RUB TO RESTRICT THE ENTRY OF
ROW
ROW
ROW
VEHICLES. LENGTH AND SECTION OF TOE WALL MAY VARY AS PER SITE CONDITIONS.
ROW
ROW
ROW
4. KINDLY REFER THE RELEVANT APPROVED FOUNDATION DRAWING DURING THE TIME
ROW
ROW
ROW
OF EXECUTION OF WORK.
ROW
ROW
ROW
ROW
5. LOCATION, DEPTH AND TYPE OF FOUNDATION MAY VARY AS PER SITE CONDITIONS
ROW
ROW
ROW ROW
ROW
ROW
6. ROAD LEVEL SHOULD BE CHECKED AT SITE PRIOR TO EXECUTION OF WORK.
ROW
ROW
ROW
FARIDABAD
ROW
ROW
7. SPAN ARRANGEMENT SHOULD BE CHECKED WITH FABRICATION DRAWING PRIOR TO
ROW
EXECUTION OF WORK.
ROW
ROW
ROW
ROW
ROW ROW
ROW
G G
ROW
ROW
ROW
ROW
ROW
ROW
SLOPE 2H:1V
1000
ROW
ROW
310
ROW
ROW
SLOPE 2H : 1V
ROW
ROW ROW
950
ROW
ROW
N8
ROW
SLOPE 1.5H : 1V
GA HT
ROW
ROW
(TY GE
STONE
SPA
ROW
3)
IG
SLOPE 2H:1V
ROW
PITCHING
U
0
PE
ROW
HE
CL OF DFC'S
820
CL OF DFC'S
AR
ROW
ROW
ROW
ROW
ROW ROW
ROW
13860(SQ)
SLOPE 2H : 1V
ROW
ROW
ROW
ROW
ROW
SLOPE 1.5H : 1V
ROW
ROW
ROW
A
ROW
F
610
ROW
0 STONE
ROW
ROW ROW
PITCHING
ROW
421 DFCCIL
ROW
0(S
ROW
)
950
K )
ROW
(SQ
ROW
ROW
ROW
ROW
642
7(S
ROW
11834(SQ) K)
ROW
1
(BA 4846
ROW
RR (SK
ROW
ROW
EL
LEN )
30
310
ROW
421
ROW
GTH 0(S
335
K)
ROW
)
ROW
C
ROW
ROW
ROW
ROW
(SQ 0
ROW
)
820
126 PMC
ROW
ROW
76(
SK)
ROW
(TYP GE
ROW
ROW
DESIGNATION DATE SIGNATURE
GAU HT
ROW
HEI
950
ROW
E 3)
ROW
E
N8
G
ROW
RE/PMC
0
E
ROW
820
ROW
SPA
ROW
400
)
(SQ
33262
ROW
ARE/PMC
ROW
AR
ROW
41247
ROW
CLE
ROW
ROW
ROW ROW
ROW
FLOOR DR
ROW
AIN
ROW
APRON
D
ROW
ROW
ISSUED BY:
ROW
119 610
(SQ 0
ROW
)
820
26 0
ROW
ROW
ROW
ROW
RESEARCH CENTER, LARSEN
ROW
CURTAIN
ROW
MANISH SAMTANI
ROW
WALL
ROW
ROW
PROJECT DIRECTOR
ROW
FARIDABAD
ROW
ROW
ROW
PROJECT :
ROW
ROW
ROW
ROW
D D
950
SLOPE 1.5H : 1V
ROW
)
FLOOR
7910(TYP.)
(SQ
ROW
ROW
IRR IRR
RO
RO
W
W APRON PACKAGE CTP-14 - REWARI TO DADRI
ROW
ROW
IRR
RO
W
IRR
RO
W
IRR
STONE
ROW
IRR
RO
RO
ROW
W
W
IRR
RO
W
IRR
RO
PITCHING
ROW
W
IRR
ROW
IRR
RO
RETURN
RO
W
W
IRR
RO
W
A1 ORGANIZATION
ROW
IRR
ROW
RO
WALL (TYP.)
W
PRITHLA
IRR
IRR
RO
ROW
RO
W
W
IRR
ROW
RO
W
ROW
CLIENT :
IRR
RO
W
IRR
ROW
IRR
RO
RO
W
W
ROW
ROW
IRR
RO
W
IRR
RO
W
IRR
ROW
IRR
R
RO
ROW
SLOPE 2H : 1VOW
W
IRR
RO
SLOPE 1.5H : 1V
W
IRR
RO
W
IRR
ROW
7910 (TYP.)
IRR
RO
RO
W
WIRR
RO
W
DROP
ROW
ROW
RO
W
IRR IRR
RO
RO
W
W
WALL
IRR
ROW
RO
W
ROW
IRR
RO
W
IRR
ROW
IRR
RO
RO
W
W STONE
ROW
ROW
IRR
RO
W
PITCHING
IRR
SLOPE 2H:1V
RO
ROW
W
IRR
TOE EDGE
ROW
IRR
RO
C
RO
ROW
W
W
IRR
RO
ENGINEER :
W
IRR
RO
ROW
W
IRR
ROW
IRR
RO
RO
W
W
IRR
RO
W
ROW
IRR
ROW
RO
W
IRR
IRR
RO
RO
W
W
SLOPE 2H : 1V
C IRR
PMC-2R
ROW
RO
W
ROW
IRR
RO
W
IRR
IRR
RO
RO
W
W
ROW
OCG CONSORTIUM
5000
ROW
IRR
RO
W
ROW
IRR
RO
W
IRR
ROW
IRR
RO
RO
ROW
W
W IRR
RO
W
ROW
IRR
RO
ROW
W
IRR
ROW
IRR
RO RO
W
W IRR
RO
W
ROW
IRR
1000mm WIDE
ROW
RO
W
IRR
IRR
RO
RO
W
W IRR
INSPECTION CONTRACTOR :
ROW
RO
W
ROW
SLOPE 2H:1V
IRR
RO
W
IRR
IRR
RO
STEPS (TYP.)
RO
W
W
ROW
ROW
IRR
RO
W
IRR
RO
SOJITZ-L&T
W
IRR
ROW
IRR
RO
RO
ROW
W
W IRR
RO
ROW
IRR
RO
ROW
W
IRR
ROAD LEVEL (AS PER SITE)
IRR
RO
RO
W
W CONSORTIUM
ROW
IRR
RO
W
ROW
IRR
RO
W
IRR
IRR
RO
RO
ROW
W
W IRR
ROW
RO
W
IRR
RO
W
IRR
ROW
IRR
RO
RO
W
W
ROW
TITLE:
IRR
RO
W
IRR
ROW
RO
ROW
W
IRR
ROW
IRR
RO
RO
W
W
TYPICAL LAYOUT FOR HEIGHT GAUGE ARRANGEMENT ( TYPE 3)
IRR
RO
W
ROW
IRR
RO
ROW
W
IRR
IRR
R RO
W
OW
ROW
ROW
IRR
RO
W
ROW
IRR
RO
W
IRR
IRR
RO
RO
ROW
W
W
SECTION
IRR
ROW
RO
W
B IRR
RO
W
IRR B
ROW
IRR
R
BTM OF FDN (VARIES)
RO
W
OW
ROW
IRR
RO
W
IRR
ROW
RO
W
IRR
RELEASED FOR
ROW
IRR
RO
SIZE :
RO
W
W
IRR
RO
W
SLT OFFICALS
ROW
ROW
IRR
RO
ROW
A1
ROW
PRELIMINARY
ROW
NAME SIGN
ROW
ROW
PROJECTION
ROW
RO
ROW
W
EDRC
RO
ROW
ROW
ROW
ROW
LEGEND : FOUNDATION COORDINATES DETAILS FOUNDATION COORDINATES DETAILS SITE DEEPAK SINGH GOOD FOR
FOUNDATION X CORDINATE Y CORDINATE CHKD FIRST ANGLE CONSTRUCTION
EXISTING STRUCTURE /ROAD- FOUNDATION X CORDINATE Y CORDINATE AMIT KUMAR
SCALE :
HEIGHT GAUGE 734179.943 3144827.564 CONSENTED K.C. YADAV NOT TO SCALE AS BUILT
PROPOSED RUB / TRACK 734137.962 3144842.756 734174.767 3144830.791
C
PCC TOE WALL 734132.749 3144845.925 734173.128 3144828.160 DRG. NO:
A A REV A
ROW 734131.140 3144843.275 734178.303 3144824.933
14 U B F D B 0 1 7 0 H G 0 1 C D
ROW ROW
734142.738 3144850.607
734175.054 3144819.764 WEARING COAT
B D DATE: 22.03.2022
734141.119 3144847.607 734173.406 3144817.137
SHEET NO: 1 OF 1
734135.916 3144851.145 734168.239 3144820.380
9 12 11 8 7 6 5 4 3 2 1