QSP-001 R0 QSP For Process Control
QSP-001 R0 QSP For Process Control
QSP-001
Waterfront Integrated Resort
Rev. No. 0
FOR
PROCESS CONTROL
Initial Release
0 Oct.31, 2013 S. Y. Yi S. Y. Yi J. W. Ko
( Issued for Approval )
REV.
REV. DATE REVISED PAGE DESCRIPTIONS OF REVISION
NO.
0 Oct. 31, 2013 All Pages Initial Release (Issued for Approval)
Doc. No. QSP-001
Waterfront Integrated Resort
Rev. No. 0
TABLE of CONTENTS
1.0 PURPOSE
2.0 SCOPE
3.0 DEFINITIONS
4.0 REFERENCE
5.0 RESPONSIBILITY
6.0 PROCEDURE
7.0 ATTACHMENT
Doc. No. QSP-001
Waterfront Integrated Resort
Rev. No. 0
1.0 PURPOSE
This is to describe the preparation and control of processes to be used for quality
management system.
2.0 SCOPE
3.0 DEFINITION
3.1 Process
Set of interrelated or interacting activities which transforms inputs into outputs
3.2 Product
Result of a process
3.3 HKN JV
Hyundai-Keangnam-NAWALOKA Joint Venture
3.4 Owner
Waterfront Properties Ltd.
4.0 REFERENCE
5.0 RESPONSIBILITY
5.1 Quality manager is responsible for definition of process to be mapped based on HKN JV
Doc. No. QSP-001
Waterfront Integrated Resort
Rev. No. 0
5.2 Each section manager is responsible for the preparation, review and approval for the process
maps to be controlled.
6.0 PROCEDURE
6.1 General
6.1.1 Process to be used for implementation of quality management system shall be established
and mapped based on the project execution plan and HKN JV quality management manual
and extent of process maps shall be decided following review of contractual requirements and
Project Quality Management Plan.
1 2 3 4
1. Project Codes
2. Core Processes classification Codes
6.2.1 Process mapping shall be established in accordance with attachment, QSP-001-01 and 02.
6.3 Revisions
6.3.1 Changes of the process mapping shall be implemented by the responsible personnel, and
reviewed and approved by the same organization that performed the original review and
approval.
6.4 Distribution
6.4.1 All approved process mapping shall be distributed to relevant functions in accordance with
document and data control procedure (QSP-002).
7.0 ATTACHMENT
Yes Set Up
Schedule
Inprocess Inspection
HYUNDAI-Keangnam-NAWALOKA JV
Inspection Shop Prepare the Inspection Request the Shop Review and decide for
Notification(21 days in
Notificaion Inspection Notification Inspection arttendance
advance)
Inform to Vendor
Sheet No.
Reject Record
Accept
Repair / Rework Control
Prepare the shop Inspection
Inspection
Inspection Report Report
Report
0
Inspection
Review and updated the Submit to Owner
QSP-001
status
Sh. 7 of 7
Form QSP-001-01