EQUIPMENT / SYSTEM REPORT

Project : Equipment Type : Equipment TAG : Date:


MTTHQ DB, EDB, ETC... - Final Panels
Location : Is Energized : T&C Status : Approval Status :

Fed From : Location : Panel Tag :

Prerequisite
1). Installed in place as per approved shop drawing/As-built drawing
2). Trays and Ladders Installed
3). Cable laying
4). Equipment tagging
5). Earthing/Glanding
6). Termination of Incoming
7). Termination of outgoings
Pre-Commissioning
1). Ensure that the DB is clean and free from foreign/construction debris.

2). Ensure the tightness and clearance between lugs of Incoming & outgoing field cables.

3). Ensure that the CB current settings are as per the load requirement.
Check the proper fitting of live conductive busbar's shroud and ensure that no live busbar are in open
4).
condition.
5). Check the Earthing of DB has done.
Signatures
Date Company Job Title Name Signature
AJC

CSI
GHE
EQUIPMENT / SYSTEM REPORT

Project : Equipment Type : Equipment TAG : Date:


MTTHQ DB, EDB, ETC... - Final
Location : Is Energized : T&C Status : Fed From :

Commissioning

1). Check & Record Phase Voltage, Line Voltage, Frequency & Phase sequence of the incomer.

2). Check the manual ON/OFF operation of incomer and outgoing Breakers.

3). Check the Scheme function and electrical switching operation of contactors in line with drawing.

4). Check the functionality of Photocell and Timer if applicable

5). Ensure that the functionality of indication lamps.


Test
SI.no Observation Result
descriptions
1 Phase voltage L1 - N L2 - N L3 - N

2 Line voltage L1 - L2 L2 - L3 L3 - L1

3 Frequency 50 Hz Phase sequence R,Y,B


Commissioning Signatures
Date Company Job Title Name Signature
AJC
CSI
GHE