Daily Report: Various Pressure Vessel (Baru Gas Plant Project - Pltgu Tenayan) Daily Photograph

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

VARIOUS PRESSURE VESSEL

(BARU GAS PLANT PROJECT - PLTGU TENAYAN)


DAILY REPORT Daily Photograph

Konsorsium Sikars Petroleum Nusantara - Petroflexx Prima Daya Reff. Number


Konsorsium Sikars Petroleum Nusantara -
Client : Petroflexx Prima Daya Issued Date 13-Jun-22
PM Consultant : Day Nr. Senin day(s)
Contractor : Prosympac O&G Remain. Day Senin day(s)
No. Work Description Weather Condition
1 Tool Box Meeting 08.00 - 08.30 s

2 Slug catcher 08.30 - 14.00 s


a. Continue gas test area.
b. Continue grinding and cleaning the weld of the rear head vessel.
c. Continue welding (hot pass) front head (right side) vessel.
d. Welding (rooth) front head (left side) vessel.

3 Repair discharge spool unit sump tank pump. 14.00 - 17.00 s

4 Repair leak LG unit filter coalescer B. 17.00 - 20.45 s

5 House keeping. 20.45 - 21.00 s

MANPOWER EQUIPMENT
Working Hour(s)
No. Description No. Description Qty Unit
Person Overtime
1 Supervisor 1 0 1
2 Flange Management 2 0 2
3 Pipe Fitter 2 0
4 Supporting 1 0
5 Lead Instrumen 1 0
6 Technician 2 0 MATERIAl
No. Type Qty Unit
1
2
3
4
5
6
7
8
SAFETY CONDITION
Total Manhour(s) 117 hour(s)
Lost of Injury Time 0 hour(s)
Total Accident 0 case(s)
Total 9 Total Incident 0 case(s)
Approved by. ISSUED BY Approved by. ISSUED BY
KSO SPN-PPD Prosympac O&G KSO SPN-PPD Prosympac O&G

Iwan Somantri Iwan Somantri


( Supervisor ) ( Supervisor )
Note : S = sunny day, C = cloudy, R = rainy