Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

City County Project Description RALG Total Other Total Total Cost

Resurface Temple Road from


US-31 to Driveway Northeast
Clanton Chilton $ 224,494.00 $ 67,348.00 $ 291,842.00
of Clanton Intermediate
School (0.53 miles)
Resurface CR-17 from SR-22
Dallas $ 250,000.00 $ 1,004,579.00 $ 1,254,579.00
to CR-157 (3.5 miles)
Bridge Replacement on CR-
Crossville DeKalb $ 230,000.00 $ - $ 230,000.00
825 over Baker Branch
Subgrade Repairs and
Resurface Crawford Road
from SR-35 to Snodgrass Road
Scottsboro Jackson $ 250,000.00 $ 328,024.00 $ 578,024.00
and Right Turn Lane Extension
on Crawford Road at SR-35
(1.5 miles)
Resurface Moore Ave., Miller
Ave., Oakley Ave., Brandon
Linden Marengo Ave., Easey Ave., Shiloh St., $ 250,000.00 $ 17,606.00 $ 267,606.00
Old Myrtlewood Rd., and
Caroline St. (1.8 miles)

Resurface Veterans Boulevard


Brundidge Pike from US-231 to SR-93 (North $ 250,000.00 $ 417,292.00 $ 667,292.00
Main Street) (0.94 miles)

Full Depth Reclamation and


Drainage Improvements on
Roanoke Randolph $ 250,000.00 $ 138,767.00 $ 388,767.00
Franklin Road from SR-22 to
US-431 (0.86 miles)

Full Depth Reclamation to


Whiting Road from Chastain
Talladega $ 250,000.00 $ 87,364.00 $ 337,364.00
Road to Orangevale Road (2.5
miles)
Resurface Georgia Loop,
Candice Lane, Hunter Drive,
Woodstock Tuscaloosa $ 250,000.00 $ 342,450.00 $ 592,450.00
and Gilbert Tommie Road
(2.63 miles)
Bridge Replacement on
Wilcox Hideaway Road over $ 250,000.00 $ 51,000.00 $ 301,000.00
unnamed chanel
Overall Totals $ 2,454,494.00 $ 2,454,430.00 $ 4,908,924.00

You might also like