DISEÑO DE UNA PLACA DE FUNDACION METODO RIGIDO CONVENCIONAL SEGÚN ACI-314

𝑦
DATOS
Fc'= 20.70 MN/m²
Fy= 413.7 MN/m² 𝐴 𝐺 𝐵 𝐼 𝐶
Col x Col= 50 cm 400 KN 500 KN 450 KN 0.25 m

A= 354.75 m² Iy= 13665.3 m^4


Q= 11000 Ton Ix= 8048.4 m^4 7.0 m
X´= 7.814 m Y´= 10.85 m
ex= -0.44 m ey= 0.10 m
1500 KN 1500 KN 1200 KN
Mx= 1100 KN/m² My= 4840 KN/m²
0.44 m
𝑥
Presion en el Suelo 0.10 m
7.0 m
𝑞=𝑄/𝐴±(𝑀_𝑦 𝑥)/𝐼_𝑦 ±(𝑀_𝑥 𝑦)/𝐼_𝑥
1500 KN 1500 KN 1200 KN

qA= 35.40 KN/m² qC= 26.63 KN/m² 7.0 m

qB= 32.48 KN/m² qD= 23.69 KN/m²

qE= 29.54 KN/m² qf= 35.38 KN/m² 400 KN 500 KN 350 KN 0.25 m
𝐹 𝐻 𝐸 𝐽 𝐷
FRANJA AGHF 8m 8m
0.25 m 0.25 m
P.prom= 35.391 KN/m² R.suelo= 3233.8 KN Q.prom= 3516.9 KN
P3= 1388.26 KN
P.p.mod= 38.489 KN/m² F.m= 0.9255 P1= 370.20 KN P2= 1388.3 KN
P4= 370.20 KN
W(Lineal)= 163.58 KN/m

370.202 KN 1388.256 KN 1388.256 KN 370.202 KN


0.250 m 7.00 m 7.00 m 7.00 m 0.25 m

163.58 KN/m

324.21 KN-m 324.21 KN-m

A B C 713.19 KN-m E F

5.11 KN-m 1119.47 KN-m 1119.47 KN-m 5.11 KN-m

40.89 KN 815.75 KN 572.56 KN 378.96 KN

A B C D EE F

378.96 KN 572.56 KN 815.75 KN 40.89 KN


FRANJA GIJH 0.675

P.prom= 31.01 KN/m² R.suelo= 2635.66 KN Q.prom= 3317.8 KN


P3= 1244.19 KN
P.p.mod= 39.03 KN/m² F.m= 0.8295 P1= 414.73 KN P2= 1244.2 KN
P4= 414.73 KN
W(Lineal)= 312.27 KN/m

414.729 KN 1244.186 KN 1244.186 KN 414.729 KN


0.250 m 7.00 m 7.00 m 7.00 m 0.25 m

312.27 KN/m

641.32 KN-m 641.32 KN-m

A B C 293.17 KN-m E F

6.79 KN-m 1629.48 KN-m 1629.48 KN-m 6.79 KN-m

54.54 KN 995.42 KN 763.61 KN 531.80 KN

A B C D EE F

531.80 KN 763.61 KN 995.42 KN 54.54 KN

FRANJA ICDJ

P.prom= 31.01 KN/m² R.suelo= 2833.33 KN Q.prom= 3016.7 KN


P3= 1131.25 KN
P.p.mod= 33.01 KN/m² F.m= 0.9427 P1= 424.22 KN P2= 1131.3 Ton
P4= 329.95 KN
W(Lineal)= 140.31 KN/m

329.948 KN 1131.250 KN 1131.250 KN 424.219 KN


0.250 m 7.00 m 7.00 m 7.00 m 0.25 m

140.31 KN/m

535.08 KN-m 1190.00 KN-m


313.42 KN-m

A B C E F

4.39 KN-m 360.00 KN-m 1190.00 KN-m 4.39 KN-m

35.08 KN 593.07 KN 538.10 KN 389.10 KN

A B C D EE F

389.10 KN 538.10 KN 593.07 KN 35.08 KN


DETERMINACION DEL ESPESOR DE LA LOSA

𝑏_𝑜=(0.5+𝑑/2)+(0.5+𝑑/2)+(0.5+𝑑)=1.5+2𝑑
𝑈=(𝑏_𝑜 )[(𝜙)(0.34) √(𝑓_𝑐´)] 𝑈=1.7∙𝑃_𝑚𝑎𝑥= 2550 KN

1.02 m Recubrimien
=(1.5+2𝑑)(𝑑)[(0.85)(0.34)∙√250] 𝑑= 76 mm
2.550 MN to 𝒉= 0.85 m
0.70 m Diametro de 25 mm
Barras
DETERMINACION DEL ACERO DE REFUERZO

Para Momento Positivo Maximo

M+= 1629 KN-m M+ 395 KN-m/m


B1
𝑎=(𝐴_𝑠 𝑓_𝑦)/(0.85∙𝑓_𝑐′∙𝑏)= 𝑀_𝑢=𝜙𝐴_𝑠 𝑓_𝑦 (𝑑−𝑎/2) 671.54
23.512 As As= 0.042531 a = 11.08 a − 5.542 a²

-5.542 a² + 11.08 a − 0.672 = 0.00 -1.00 a² + 2.00 a = 0.1212 𝒂= 0.063 m 𝑨_𝒔= 2660 mm²/m

Utilica varillas de 25 mm de diametro separadas 175 mm centro a a centro

As= 2805.714 mm²/m OK

Para Momento Negativo Maximo

M-= 1190 KN-m M+ 280 KN-m/m


B1
𝑎=(𝐴_𝑠 𝑓_𝑦)/(0.85∙𝑓_𝑐′∙𝑏)=
23.512 As As= 0.042531 a 𝑀_𝑢=𝜙𝐴_𝑠 𝑓_𝑦 (𝑑−𝑎/2)476.00 = 11.08 a − 5.542 a²

-5.542 a² + 11.08 a − 0.476 = 0.00 -1.00 a² + 2.00 a = 0.0859 𝒂= 0.044 m 𝑨_𝒔= 1867 mm²/m

Utilica varillas de 25 mm de diametro separadas 255 mm centro a a centro

As= 1925.490 mm²/m OK

Para Momento Negativo Maximo Mitad de Franja ICDJ

M-= 313 KN-m M+ 73.75 KN-m/m


B1

𝑎=(𝐴_𝑠 𝑓_𝑦)/(0.85∙𝑓_𝑐′∙𝑏)=
23.512 As As= 0.042531 a 𝑀_𝑢=𝜙𝐴_𝑠 𝑓_𝑦 (𝑑−𝑎/2)125.37 = 11.08 a − 5.542 a²

-5.542 a² + 11.08 a − 0.125 = 0.00 -1.00 a² + 2.00 a = 0.0226 𝒂= 0.011 m 𝑨_𝒔= 484 mm²/m

Utilica varillas de 25 mm de diametro separadas 400 mm centro a a centro

As= 550.000 mm²/m OK


DISEÑO DE UNA PLACA DE FUNDACION METODO RIGIDO CONVENCIONAL SEGÚN ACI-318-19

DATOS 0.50 m 2.40 m 0.50 m


Fc'= 250 Kgf/cm²
Fy= 4200 Kgf/cm² 1 2 3
𝝈_𝒂𝒅𝒎= 1.50 Kgf/cm² 0.50 m
Col x Col= 40 cm
25 Ton 25 Ton

DERMINACION DE LAS CARGAS DE SERVICIO Y


CARGA ACTUANTES SOBRE LAS LOSAS

Q.serv= 130 Ton Qu= 195 Ton


Area= 21.080 m² 4 5 6.20 m
DETERMINACION DE LA INERCIA DE LA LOSA 5.20 m
0.60 m
Ix= 67.526 Iy= 20.307

DETERMINACION DE EXCENTRICIDADES
40 Ton 40 Ton
X´= 1.200 m Y´= 3.20 m
ex= 0.00 m ey= 0.60 m 0.50 m
Mx= 117 Ton-m My= 0 Ton-m 6 7 8

DETERMINACION DE LA PRESION ACTUANTE SOBRE 3.40 m


EL SUELO
𝒒=𝑸/𝑨±(𝑴_𝒚 𝒙)/𝑰_𝒚 ±(𝑴_𝒙 𝒚)/𝑰_𝒙 +𝒒𝒑𝒑
Se considera que el peso propio losa se corresponde con el valor
del esfuerzo excavado,por lo tanto se desprecia
〖𝒒 . 〗 _𝒏𝒆𝒕𝒂=(𝑸/𝑨±(𝑴_𝒚 𝒙)/𝑰_𝒚 ±(𝑴_𝒙 𝒚)/𝑰_𝒙 +𝒒𝒑𝒑)−𝜸_𝑫𝑭

CHEQUEO DE LAS PRESIONES ACTUANTES SOBRE EL SUELO EN CADA PUNTO DE ESTUDIO


PUNTO Q/A (Ton/m) X (m) 0.00 X Y(m) 1.733 Y q (Ton/m2)
1 9.2505 -1.700 0.000 3.100 5.3712 3.8792 ≤ 15.000
2 9.2505 0.000 0.000 3.100 5.3712 3.8792 ≤ 15.000
3 9.2505 1.700 0.000 3.100 5.3712 3.8792 ≤ 15.000
6 9.2505 -1.700 0.000 -3.100 -5.3712 14.6217 ≤ 15.000
4 9.2505 -1.700 0.000 0.000 0.0000 9.2505 ≤ 15.000
5 9.2505 1.700 0.000 0.000 0.0000 9.2505 ≤ 15.000
7 9.2505 0.000 0.000 -3.100 -5.3712 14.6217 ≤ 15.000
8 9.2505 1.700 0.000 -3.100 -5.3712 14.6217 ≤ 15.000

DETERMINACION DE LAS PRESIONES ACTUANTES SOBRE CADA FRANJA DE ESTUDIO

𝐶𝑎𝑟𝑔𝑎 𝑇𝑜𝑡𝑎𝑙 ≠(𝑞 𝑝𝑟𝑜𝑚)(𝐵𝐼)(𝐵)→𝑁𝑜 𝑠𝑒 𝑡𝑜𝑚𝑎 𝑒𝑛 𝑐𝑢𝑒𝑛𝑡𝑎 𝑙𝑎 𝑓𝑢𝑒𝑟𝑧𝑎 𝑐𝑜𝑟𝑡𝑎𝑛𝑡𝑒


DIRECCION X 𝑒𝑛𝑡𝑟𝑒 𝑙𝑎 𝑓𝑟𝑎𝑛𝑗𝑎𝑠 𝑎𝑑𝑦𝑎𝑐𝑒𝑛𝑡𝑒𝑠→𝑆𝑒 𝑑𝑒𝑏𝑒 𝑟𝑒𝑎𝑙𝑖𝑧𝑎𝑟 𝑢𝑛𝑎 𝑐𝑜𝑟𝑟𝑒𝑐𝑐𝑖𝑜𝑛

FRANJA 1-3-4-5 q.prom= 6.56 Ton/m² 𝑹=69.19 Ton ≤ 75.00 Ton

Carga Promedio= 72.10 Ton F= 0.961 q.prom.mod= 6.840 Ton/m²

21.20 Ton/m
〖𝒒 . 〗 _(𝒍𝒊𝒏𝒆𝒂𝒍.𝟏)=
𝐶𝑎𝑟𝑔𝑎 𝑇𝑜𝑡𝑎𝑙 ≠(𝑞 𝑝𝑟𝑜𝑚)(𝐵𝐼)(𝐵)→𝑁𝑜 𝑠𝑒 𝑡𝑜𝑚𝑎 𝑒𝑛 𝑐𝑢𝑒𝑛𝑡𝑎 𝑙𝑎 𝑓𝑢𝑒𝑟𝑧𝑎 𝑐𝑜𝑟𝑡𝑎𝑛𝑡𝑒
FRANJA 4-5-6-8 𝑒𝑛𝑡𝑟𝑒 𝑙𝑎 𝑓𝑟𝑎𝑛𝑗𝑎𝑠 𝑎𝑑𝑦𝑎𝑐𝑒𝑛𝑡𝑒𝑠→𝑆𝑒 𝑑𝑒𝑏𝑒 𝑟𝑒𝑎𝑙𝑖𝑧𝑎𝑟 𝑢𝑛𝑎 𝑐𝑜𝑟𝑟𝑒𝑐𝑐𝑖𝑜𝑛
q.prom= 11.94Ton/m² 𝑹=125.81 Ton ≤ 120.00 Kgf/cm²

Carga Promedio= 122.90 Ton F= 1.024 q.prom.mod= 11.661 Ton/m²


36.148 Ton/m
〖𝒒 . 〗 _(𝒍𝒊𝒏𝒆𝒂𝒍.𝟏)=
〖𝒒 . 〗 _(𝒍𝒊𝒏𝒆𝒂𝒍.𝟏)=
DIRECCION Y
FRANJA 1-2-6-7

〖𝑞 . 〗 _𝑝𝑟𝑜𝑚1=(𝑞_1+𝑞_2)/2= 〖𝑞 . 〗 _𝑝𝑟𝑜𝑚2=(𝑞_6+𝑞_7)/2=
5.4 Ton/m² 〖𝑞 . 〗 _𝑝𝑟𝑜𝑚=(𝑞_𝑝𝑟𝑜𝑚1+𝑞_𝑝𝑟𝑜𝑚2)/2=
14.622Ton/m² 9.996Ton/m²

𝑹= 105.36 Ton ≈ 97.50 Ton 9.13 Ton/m


〖𝒒 . 〗 _(𝒍𝒊𝒏𝒆𝒂𝒍.𝟏)= 24.86 Ton/m
〖𝒒 . 〗 _(𝒍𝒊𝒏𝒆𝒂𝒍.𝟐)=
FRANJA 2-3-7-8

〖𝑞 . 〗 _𝑝𝑟𝑜𝑚1=(𝑞_2+𝑞_3)/2= 〖𝑞 . 〗 _𝑝𝑟𝑜𝑚2=(𝑞_7+𝑞_8)/2=
3.9 Ton/m² 〖𝑞 . 〗 _𝑝𝑟𝑜𝑚=(𝑞_𝑝𝑟𝑜𝑚1+𝑞_𝑝𝑟𝑜𝑚2)/2=
14.622Ton/m² 9.250Ton/m²

𝑹= 97.50 Ton ≈ 97.50 Ton 6.59 Ton/m


〖𝑞 . 〗 _(𝒍𝒊𝒏𝒆𝒂𝒍.1)= 24.86 Ton/m
〖𝑞 . 〗 _(𝒍𝒊𝒏𝒆𝒂𝒍.2)=

DIAGRAMA DE CORTE Y MOMENTO FLECTOR

FRANJA1-3-4-5 FRANJA 4-5-6-8

37.50 Ton 37.50 Ton 61.45 Ton 61.45 Ton

21.20 Ton/m 36.15 Ton/m

12.21 Ton*m 20.82 Ton*m

2.65 Ton*m 2.65 Ton*m 4.52 Ton*m 4.52 Ton*m

10.60 Ton 26.90 Ton 18.07 Ton 43.38 Ton

26.90 Ton 10.60 Ton 43.38 Ton 18.07 Ton

FRANJA 1-2-6-7

0.50 m 37.50 Ton 60.00 Ton


𝒙

1.76 Ton/m 6.6 Ton/m


8.35 Ton/m
𝒚= 3.5 x 23.41 Ton/m 24.86 Ton/m

𝑭𝒓𝟏= 1.76 x² 48.255 Ton


3.74 Ton
𝑭𝒓𝟐= 6.59 x 27.27 Ton
3.30 m
5.20 m
𝒙
A B 1.072 m C
𝒚 1.90 m
33.76 Ton
15 Ton/m 11.745 Ton

𝒚= 2.9 x

𝑭𝒓𝟏= 1.45 x² 50.31 Ton*m

𝑭𝒓𝟐= 8.35 x 3
A B C D
0.50 m
𝒙

𝒚 0.898 Ton-m 3.05 Ton*m

1.45 Ton/m ∑▒ 〖𝑓𝑣 =1,45 〖 (𝑥−0.50) 〗 ^2+8,35(𝑥−0.50)−33,76 〗− V=0

𝒚= 2.9 x V= 〖 4.69𝑥 〗 ^2+50.68𝑥−138 a= 1.45 x²


𝑭𝒐𝒓𝒎𝒖𝒍𝒂 se adopta 𝒉= 90 m
b= 6.59 x
𝑭𝒓𝟏= 1.45 x²
𝑥=(−𝑏±√(𝑏^2−4𝑎𝑐))/2𝑎= c= -37.58
3.30 m
𝑭𝒓𝟐= 23.41 x

Verificacion a Corte

𝑉_𝑢≤ 〖∅𝑉〗 _𝑐 〖∅𝑉〗 _𝑐=∅∙0,53√(𝑓𝑐^′ )=6.29 Kgf/cm² ∅= 0.75 𝑉𝑢=𝑉𝑢/(∅.𝑏.𝑑)=


1.94 Kgf/cm² OK
𝑑= 82.5 cm

Verificacion a Punzonado

𝑉_𝑢≤ 〖∅𝑉〗 _𝑐〖∅𝑉〗 _𝑐=∅∙1.06√(𝑓𝑐^′ )=12.57 Kgf/cm² 𝑏𝑜=2(𝑏𝑥+𝑏𝑦+2𝑑)= 490 cm


𝑉𝑢=𝑉𝑢/
𝑉𝑢1=𝑃𝑢−𝑞_𝑢 (𝑏_𝑐𝑜𝑙+𝑑^2)= 44.999 Ton ((𝑏𝑜𝑥𝑑))= 1.113. Kgf/cm² ≤ 12.570 Kgf/cm² OK

Verificacion de Rigidez de Viga


𝝀=√(𝟒&(𝒌∙𝒃)/(𝟒∙𝑬_𝒄∙𝑰)=)
0.003252 5.38. m
〖𝒔𝒆𝒑〗 _𝒄𝒐𝒍<(𝟏.𝟕𝟓)⁄𝝀= OK

Diseño del acero de refuerzo requerido para las condiciones de carga última.
Cálculo acero en los apoyos (Acero Inferior) Apoyo C3=C4 DIRECCION X
𝐴𝑠^+=(𝑀𝑢.𝑚𝑎𝑥)/(∅.𝑓𝑦.𝑗𝑢.𝑑)= 𝐴𝑠.𝑚𝑖𝑛=0,0018∙𝑏∙ℎ= 𝒏= 〖𝐴𝑠〗 _𝑐𝑎𝑙/ 30.00 𝒔= 10 cm
1.610. cm² 50.22. cm²
( 〖𝐴𝑠〗 _∅
5⁄8)=
Cálculo acero en tramo central (Acero Superior)
𝐴𝑠^+=(𝑀𝑢.𝑚𝑎𝑥)/(∅.𝑓𝑦.𝑗𝑢.𝑑)= 𝐴𝑠.𝑚𝑖𝑛=0,0018∙𝑏∙ℎ= 𝒏= 〖𝐴𝑠〗 _𝑐𝑎𝑙/ 25.50 𝒔= 10cm
7.419. cm² 50.22. cm²
( 〖𝐴𝑠〗 _∅
5⁄8)=
Cálculo acero en los apoyos (Acero Inferior) Apoyo C1
DIRECCION Y
𝐴𝑠^+=(𝑀𝑢.𝑚𝑎𝑥)/(∅.𝑓𝑦.𝑗𝑢.𝑑)= 𝐴𝑠.𝑚𝑖𝑛=0,0018∙𝑏∙ℎ= 𝒏= 〖𝐴𝑠〗 _𝑐𝑎𝑙/ 14.00 𝒔= 10 cm
0.320. cm² 27.54. cm²
( 〖𝐴𝑠〗 _∅
5⁄8)=
Cálculo acero en los apoyos (Acero Inferior) Apoyo C3 DIRECCION Y
𝐴𝑠^+=(𝑀𝑢.𝑚𝑎𝑥)/(∅.𝑓𝑦.𝑗𝑢.𝑑)= 𝐴𝑠.𝑚𝑖𝑛=0,0018∙𝑏∙ℎ= 𝒏= 〖𝐴𝑠〗 _𝑐𝑎𝑙/ 14.00 𝒔= 10 cm
1.086. cm² 27.54. cm²
( 〖𝐴𝑠〗 _∅
5⁄8)=
Cálculo acero en tramo central (Acero Superior)
𝐴𝑠^+=(𝑀𝑢.𝑚𝑎𝑥)/(∅.𝑓𝑦.𝑗𝑢.𝑑)= 𝒏= 〖𝐴𝑠〗 _𝑐𝑎𝑙/
( 〖𝐴𝑠〗 _∅
5⁄8)=
𝐴𝑠^+=(𝑀𝑢.𝑚𝑎𝑥)/(∅.𝑓𝑦.𝑗𝑢.𝑑)= 𝒏= 〖𝐴𝑠〗 _𝑐𝑎𝑙/
17.925. cm² 𝐴𝑠.𝑚𝑖𝑛=0,0018∙𝑏∙ℎ= 27.54. cm² 14.00 𝒔= 10.00. cm
( 〖𝐴𝑠〗 _∅
5⁄8)=
𝒏= 〖𝐴𝑠〗 _𝑐𝑎𝑙/
( 〖𝐴𝑠〗 _∅
5⁄8)=
Detalles de Armado de la losa de Cimentacion
6.20 m
𝑩

𝐶1 𝐶3
3.40 m

𝑨 𝑨

𝐶2 𝐶4

0.50 m 2.40 m 0.50 m

0.40 m 0.40 m

𝑪𝟑 𝑪𝟒 𝟏 ∅ 5/8 @ 10 cm

𝟏 ∅ 5/8 @ 10 cm
0.50 m

CORTE B-B

0.50 m 5.20 m 0.50 m

0.40 m 0.40 m

𝑪𝟏 𝑪𝟑 𝟏 ∅ 5/8 @ 10 cm

𝟏 ∅ 5/8 @ 10 cm
0.50 m

CORTE A-A

You might also like