Preliminary Acceptance Test: PAT For Business Switch ATN910C Huawei
Preliminary Acceptance Test: PAT For Business Switch ATN910C Huawei
Issued: 28-Feb-2022
Version: 2.1
PAT Reference
ERICSSON OUTDOOR
SED No.: W-3968-ATN-01-EXP(REL)-01 Rack Location:
CABINET
Project Name / No.: Saudi Mobily Intelligent Transport Network Project 2018
W-3968-ATN-01-
Job No.: District: West City: Makkah
EXP(REL)-01
Site No.: WR_3968 Site Coordinates: 39.898200, 21.402600
PUBLIC
Classification: PUBLIC Use
1.1 17-Feb-2019 Modified OIL sheets for Field and NOC Rehan Amjad
Updated the 4.1.2 ATN910C Router VRP Software
1.2 11-Jul-2019 Version (NOC)
Rehan Amjad
1.5 08-Dec-2019 Add BIDI sensitivity test and new SFP types Rehan Amjad
1.6 10-Dec-2019 Update process for BIDI sensitivity test Rehan Amjad
1.7 24-Dec-2019 3.7 test case updated for POP site RX test Rehan Amjad
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Contents
1. INTRODUCTION ...............................................................................................................................4
1.1 SCOPE ..............................................................................................................................................4
1.2 EQUIPMENT, SUB-RACKS AND FIRMWARE ................................................................................5
1.3 LIST OF TEST EQUIPMENT’S USED DURING THIS PAT .............................................................5
2. LIST OF TEST CASES .....................................................................................................................6
Detail Test description ...........................................................................................................................6
3. HARDWARE ACCEPTANCE TEST .................................................................................................7
3.1 ATN910C PANEL .............................................................................................................................7
3.2 SITE ACCEPTANCE QUALITY CHECK LIST .................................................................................9
3.3 BILL OF QUANTITIES AVAILABLE AS PER SITE ......................................................................14
3.4 POWER MODULE REDUNDANCY TEST (FIELD) .......................................................................15
3.5 DC VOLTAGE AND GROUNDING TEST (FIELD).........................................................................16
3.6 INTERFACE TRANSCEIVER TX POWER VERIFICATION (FIELD) ............................................17
3.7 INTERFACE TRANSCEIVER RX POWER VERIFICATION (FIELD) ............................................19
3.8 OPTICAL MODULE RECEIVER SENSITIVITY TEST (FIELD) .....................................................21
3.9 BIDI OPTICAL MODULE RECEIVER SENSITIVITY TEST UPLINK (FIELD) ...............................23
3.10 SYSTEM REBOOT BY POWER OFF (FIELD) ...........................................................................25
4. SOFTWARE ACCEPTANCE TEST ................................................................................................26
4.1 SOFTWARE AND DEVICE STATUS .............................................................................................26
4.1.1 ATN910C CONFIGURATION VERIFICATION (NOC) ...............................................................26
4.1.2 ATN910C SWITCH VRP SOFTWARE VERSION (NOC) ...........................................................27
4.1.3 ATN910C DEVICE STATUS (NOC) ............................................................................................28
4.1.4 ATN910C SYSTEM CONFIGURATION CHECK (NOC) ............................................................29
4.1.5 ATN910C GATEWAY REACHABILITY TEST (NOC) ................................................................30
4.1.6 ATN910C SSH AND SECURITY TEST (NOC) ...........................................................................31
4.1.7 MBSS VERIFICATION (NOC) .....................................................................................................32
4.1.8 V-SHAPE PRIMARY/BACKUP SWITCHOVER TEST (NOC) ....................................................33
5. TEST RESULTS PARTICIPATION REFERENCE .........................................................................34
6. ACCEPTANCE TEST REPORT (FIELD) .......................................................................................35
7. OUTSTANDING ISSUES LIST (FIELD) .........................................................................................36
8. ACCEPTANCE TEST REPORT (NOC) ..........................................................................................37
9. OUTSTANDING ISSUES LIST (NOC) ............................................................................................38
10. TEST RESULTS SUMMARY ..........................................................................................................39
11. ABBREVIATIONS ...........................................................................................................................40
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
1. Introduction
1.1 Scope
This document presents the Preliminary Acceptance Test prerequisites, test procedure according to Mobily
and Huawei Tech. Inv. Saudi Arabia standards. The following diagram shows the topology of ATN.
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
ATN910C-B V300R005C10 1
ATN910C-G V300R006C10
ATN910C-M V300R021C00
Brand
Test Equipment Model No Serial No Calibration Date
Name
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Test Categorization
Test Descriptions
No (SA/NSA)
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
ATN910C AC Model
ATN910C-G DC Model
ATN910C-G AC Model
ATN910C-M DC Model
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
ATN910C-M DC Model
Equipment Inventory
w3968-IASW-HU01
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
manual).
Racks fixed
All of the expansion bolts used to fix properly from
support (or foot) should be installed top and
firmly. Fixing screws and nuts (bolt) bottom
3 should be installed by the correct order. (according to SA
The installation holes of the support (or the installation
foot) are matched with expansion bolts manual/ITFM
perfectly. installation
guidelines)
The mechanical accessories of cabinet Installation
4
should be installed correctly manual
NSA
The movable accessories of the cabinet
should work normally. Doors locks, Fan Installation
5
tray, The cabinet key has to be attached Manual
NSA
and working well.
All connecting bolts in the cabinet are Installation
6
installed correctly and firmly Manual
NSA
The racks, sub racks or part of the racks
are not scratched or smeared or
7
distorted. This may be affecting the
NSA
equipment appearance.
The boards can be plugged and
unplugged smoothly (cards ejectors are
Installation
8 working normally). Its panel screws
Manual
SA
should have appropriate tightness if they
exist.
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
20 Best Practice
the patch cords should be organized
properly inside the facility.
Fibers jumpers (FPP-to-FPP/ODF) are
Installation
routed using the right side of the cable
21
management facilities and fiber guides in
manual & Best SA
Practice
tidy and organized manner.
The “left side” of the ODF cable
Installation
management should be used for all
22
equipment termination (Equipment-to-
manual & Best SA
Practice
FPP/ODF)
Proper patch cords length should be
used to avoid fiber coils inside a cabinet
(should be coiled into a circle of more
than 8 cm before it is fixed if it is a must).
23
1meter is the maximum allowed excess
Best Practice SA
length and this should be properly
routed/coiled to avoid blocking airflow
or over utilizing space.
The patch cords connector should be
clean without any dust. The unused
24 optical fiber head and board optical port Best Practice NSA
should be covered with protection caps
(dust caps).
The cable labels are filled in and pasted
As per the
correctly and reliably. Their positions are
Approved
25 orderly and in the same uniform. Cable
Format &
NSA
labels should be stuck at the place 2cm
Materials
away from their connector.
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
standards
between.
When the grounding cable and power Installation
cable is connected to the distribution box manual, F40,
31
or PDU/TRU/PDP, its redundant/excess F42 Guidelines
SA
part should be cut and cannot be coiled. & Best Practice
The power cable/ground cable should be
Installation
routed away from the signal cable outside
32
the cabinet at least it should be more than
manual & Best NSA
Practice
3 cm.
The color of power cables and ground
cables should be specified according to
the standard The –48V power cable is applicable
33
blue; the GND (BGND) ground cable is standards
SA
black (red), and the PGND protection
cable is yellowish green or yellow.
The bending position of the power cable
34
and ground cable should be smooth.
Best Practice NSA
When making lugs for the power and
ground cables, the lugs should be
Installation
soldered or crimped firmly. Lugs edge
manual, F40,
35 should touch the cable insulation, copper
F42 Guidelines
SA
shouldn't be visible and then crimped
& Best Practice
point should be covered with shrinking
tube.
The protection grounding cable of DDF
Installation
and ODF should be connected firmly.
36
Those between adjacent frames should be
manual & Best NSA
Practice
interconnected.(6mm2)
The ground cable of cabinet door should Installation
37 be connected in a correct and reliable manual & Best NSA
way。 Practice
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
OSX001002.Optical Transceiver(SFP+,1310nm,10Gb/s,-
8.2~0.5dBm,-12.6dBm,LC,SM,10km)
OSX001002 2 1725170
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Purpose To verify that the Switch has redundant power module and verify the actual redundancy
capability.
Setup
1. The switch provides redundancy backup for the power module.
Procedure 1. Turn off one power module or disconnect the power input
2. Observe the working status of the Switch.
3. Repeat the steps for another power module
Expected The redundant power module should take over the work of the primary power module
Results and the Switch should run stably.
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Setup None
Procedure 1. Use the multi-meter to connect the positive and negative terminal of the Power
Module to check the voltage value.
2. Before power on, check the grounding connectivity, including chassis to rack and
rack to grounding bus bar.
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Setup None
Procedure 1. Connect one end of the fiber patchcords to the TX optical interface of the optical
board/module to be tested through the assigned ODF/FPP(if ODF/FPP available)
and the other end to the test input port of the optical power meter (Note: Set
wavelength according to SFP module type).
2. Read the stable optical power value from the Optical Power Meter.
3. Record the result on Table 4: TX Power result.
4. The Expected Results show the reference value for Tx power.
Expected The actual TX power is within the normal range shown by detailed.
Results
SFP Transmit Power Range Model No.
10G-LC-SM-10KM -8.2 to +0.5 dBm OSX001002
10G-LC-SM-40KM -4.7 to +4 dBm OMXD30002
10G-LC-SM-80KM 0 to +4 dBm OSX080N04
10G-LC-MM-0.3KM -7.3 to -1 dBm OSX040N03
1G-LC-SM-10KM -9 to -3 dBm OSG010N05
1G-LC-SM-40KM -5 to 0 dBm OSG040002
1G-LC-SM-80KM -2 to +5 dBm Zx/FC100
1G-LC-MM-0.5KM -9.5 to 0 dBm Sx/FC200 MM
40G-LC-SM-10KM -7 to +2.3 dBm OSM010C02
100G-LC-SM-10KM 0 to +10.5 dBm OSN010N09
10G-LC-SM-10KM (BIDI) -8.5 to +0.4 dBm OSX010B10
10G-LC-SM-10KM (BIDI) -8.5 to +0.4 dBm OSX010B11
10G-LC-SM-40KM (BIDI) 0 to +5 dBm OSX040B02
10G-LC-SM-40KM (BIDI) 0 to +5 dBm OSX040B03
100G-LC-SM-30-40KM +3.5dBm to +8.9dBm OSN030N05
100G-LC-SM-10KM +1.7dBm to +10.5dBm OSN010N24
1G-LC-SM-40KM -2dBm to +3dBm OGEBIDI40
Note:
A. Not Applicable for collocated connections (NE to NE connection).
That means the test will be not be performed for the following:
1. Ports which are assigned as locally (collocated) or terminated to other
Router/Switch (locally connected).
2. Ports which are connected to Router/Switch installed on remote POPs via
collocated transmission equipment.
Results
See Table 4: TX Power Result.
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Setup None
Procedure Optical Ports connected to other equipment:
1. Remove the fiber patchcords to the RX optical interface of the optical board to be
tested and measure the input RX port using the optical power meter.
2. Read the stable optical power value from the Optical Power Meter.
3. Record the result on Table 5: RX Power result.
4. The Expected Results show the reference value for Rx power.
Expected
Results The Actual Rx measurement should be 3db greater than the minimum RX threshold.
SFP Received Power Range Model No.
10G-LC-SM-10KM -14.4 to +0.5 dBm OSX001002
10G-LC-SM-40KM -15.8 to -1 dBm OMXD30002
10G-LC-SM-80KM -24 to -7 dBm OSX080N04
10G-LC-MM-0.3KM -9.9 to -1 dBm OSX040N03
1G-LC-SM-10KM -20 to -3 dBm OSG010N05
1G-LC-SM-40KM -23 to -3 dBm OSG040002
1G-LC-SM-80KM -23 to -3 dBm Zx/FC100
1G-LC-MM-0.5KM -17 to 0 dBm Sx/FC200 MM
40G-LC-SM-10KM -13.7 to 2.3 dBm OSM010C02
100G-LC-SM-10KM -4 to +10.5 dBm OSN010N09
10G-LC-SM-10KM (BIDI) -14.4 to +0.5 dBm OSX010B10
10G-LC-SM-10KM (BIDI) -14.4 to +0.5 dBm OSX010B11
10G-LC-SM-40KM (BIDI) -18 to -9 dBm OSX040B02
10G-LC-SM-40KM (BIDI) -18 to -9 dBm OSX040B03
100G-LC-SM-30-40KM -15.4dBm to +2.5dBm OSN030N05
100G-LC-SM-10KM -2.6dBm to +10.5dBm OSN010N24
1G-LC-SM-40KM -23dBm to -3dBm OGEBIDI40
Note:
• Need to check RX power with power meter on POP site up till FPP once FTTM
ATN connected to UPE/CSG.
That means the test will be not be performed for the following:
1. Ports which are assigned as locally (collocated) or terminated to other
routers/Switch (locally connected).
2. Ports which are connected to routers/Switch installed on remote POPs via
collocated transmission equipment.
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Results
Please refer to Table 5: RX Power Result.
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Purpose Ensure all optical modules have optimal performance under low optical power input.
Setup
Procedure 1. Connect the tester (VOA) to Switch optical port through assigned ODF/FPP(if
ODF/FPP available) as shown above.
2. Increase the optical attenuation gradually (VOA) till the port go to down state.
3. Measure and record the optical power value on Table 6: RX Sensitivity Result.
4. Test all the port one by one and record the result.
Expected The port of Switch should not go down as per below receive power range.
Results
SFP Received Power Range Model No.
10G-LC-SM-10KM Less than -14.4 dBm OSX001002
10G-LC-SM-40KM Less than -15.8 dBm OMXD30002
10G-LC-SM-80KM Less than -24 dBm OSX080N04
10G-LC-MM-0.3KM Less than -9.9 dBm OSX040N03
1G-LC-SM-10KM Less than -20 dBm OSG010N05
1G-LC-SM-40KM Less than -17 dBm OSG040002
1G-LC-SM-80KM Less than -23 dBm Zx/FC100
1G-LC-MM-0.5KM Less than -17 dBm Sx/FC200 MM
40G-LC-SM-10KM Less than -13.7 dBm OSM010C02
100G-LC-SM-10KM Less than -4 dBm OSN010N09
100G-LC-SM-30-40KM Less than -15.4 OSN030N05
100G-LC-SM-10KM Less than -2.6 OSN010N24
1G-LC-SM-40KM Less than -23 OGEBIDI40
Note:
That means the sensitivity test will be not be performed for the following:
1. Ports which are assigned as locally (collocated) or terminated to other
routers/Switch (locally connected).
2. Ports which are connected to routers/Switch installed on remote POPs via
collocated transmission equipment.
Results
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Purpose Ensure all optical modules on ATN have optimal performance under low optical power
input.
Setup
Procedure
1. Ensure ATN is online first and working on normal status.
2. Adjust the optical attenuator, and gradually increase the attenuation, when reach the
critical point of ATN online and offline. Make sure that the adjustment is stable and slow.
3. Measure and record the optical power value on Table 7.
4. BIDI connectivity on ATN to CSG/UPE will be in pair.
Pair 10KM = (OSX010B11 - OSX010B10)
Pair 40KM = (OSX040B02 - OSX040B03)
Expected The port of Switch should not go down as per below receive power range.
Results
SFP Received Power Range Model No.
10G-LC-SM-10KM (BIDI) Less than -14.4 dBm OSX010B10
10G-LC-SM-10KM (BIDI) Less than -14.4 dBm OSX010B11
10G-LC-SM-40KM (BIDI) Less than -18 dBm OSX040B02
10G-LC-SM-40KM (BIDI) Less than -18 dBm OSX040B03
Note:
That means the sensitivity test will be not be performed for the following:
1. Ports which are assigned as locally (collocated) or terminated to other
routers/Switch (locally connected).
2. Ports which are connected to routers/Switch installed on remote POPs via
collocated transmission equipment.
Results
See Table 7: Rx Sensitivity Result.
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Setup None
Procedure 1. Keep pinging the ATN loopback address
2. Use command line to record the configuration, logs, CPU/memory, alarms,
interface status, card register status.
Display current-configuration
Display logbuffer
Display alarm all
Display device
Display device pic
Display health
Display interface brief
3. Turn off the power.
4. After 5 min, turn on the power again.
5. Check the configuration/status after reboot and compare with file before reboot.
Display current-configuration
Display logbuffer
Display alarm all
Display device
Display device pic
Display health
Display interface brief
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Purpose Verify the ATN configuration, including Node IP, Node name.
Setup None.
Procedure 1. Login to the ATN910C, the node name is displayed before the “#” prompt.
2. Use command “display ip interface brief” to check the node IP.
3. Use command “display current-configuration”
4. Verify the node name and IP.
5. Save the configuration.
Expected The Node name and IP is as per SED.
Results Node name OAM IP
w3968-IASW-HU01 10.142.227.209
Results Pass / Fail
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Setup None.
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Setup None
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Setup
None
Procedure
1. Synchronise NE configuration data on U2000
2. Backup NE data on U2000
3. Open Device Panel on U2000
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Setup
None
Procedure
1. Ping ATN gateway with below command
“ping x.x.x.x”.
2. In case there is redundant uplink, shutdown the primary uplink and verify
reachability
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Setup None
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Setup None
2.there should be two remote radius service for the authentication (IP1: 10.64.165.67, IP2:
10.14.65.65)
The shared-key of radius server should be encrypted.
7. Primary and backup log server are configured for the logs backup.
9. The Switch should be configured with the correct timezone and time is correct.
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Purpose To verify the Primary / Backup switchover test after V-shaping transformation
(this case is specifically for V-shape transformation only)
Setup
Procedure 1. Disconnect or shutdown the Primary link port between ATN to UPE1.
2. After confirm service/status normal, re-connect or undo shutdown the primary link
port between ATN to UPE1.
3. Disconnect/shutdown the backup link port between ATN-UPE2.
4. Recover the backup link fiber/port.
Expected For procedure 1, backup link will become active and primary link will be standby.
Results After procedure 2&3, primary/backup link will be recovered to original status.
Results
Result example:
Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:
Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:
Remarks:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
The below items have been noted during PAT and shall be cleared within
Clearance
three (3) months from the Preliminary Acceptance Date
Categorization Verified by
Item Date
Description of Outstanding Items Rectified
No.
SA NSA Vendor Mobily
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Clearance
Mobily Project Vendor Project Mobily O&M Mobily MNS
Representative Representative Representative Representative
Signature: Signature: Signature: Signature:
Name: Name: Name: Name:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
The below items have been noted during PAT and shall be cleared within
Clearance
three (3) months from the Preliminary Acceptance Date
Categorization Verified by
Item Date
Description of Outstanding Items Rectified
No.
SA NSA Vendor Mobily
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Clearance
Mobily Project Vendor Project Mobily O&M Mobily MNS
Representative Representative Representative Representative
Signature: Signature: Signature: Signature:
Name: Name: Name: Name:
Phone#: Phone#: Phone#: Phone#:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
Signature: Signature:
Signature: Signature:
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
11. Abbreviations
Abbreviations Description
ASG Aggregation Site Gateway
BFD Bidirectional Forwarding Detection
BGP Border Gateway Protocol
BSC Base Station Controller
CLI Command Line Interface
CPU Central Process Unit
CRC Cyclic Redundancy Check
CSG Cell Site Gateway
DC Direct Current
DDF Digital Distribution Frame
DWDM Dense Wavelength Division Multiplexing
EPC Evolved Packet Core
FTTX Fiber to the X
IGP Interior Gateway protocol
LAN Local Area Network
LDP Label Distribution Protocol
LPU Line Process Unit
MNS Management Network Service
MPU Main Process unit
MW Microwave
NEG Negative
NTP Network Time Protocol
ODF Optical Distribution Frame
PAT Preliminary Acceptance Test
PEM
Remote-LFA Remote Loop Free Alternative
RNC Radio Network Controller
RTN
SDH Synchronize Digital Hierarchy
SDRAM Synchronous Dynamic Random Access Memory
SED Site Engineering Design
SFP
SFU Switch Fabric unit
SNMP Simple Network Management Protocol
SSH Secure Shell
VRP Versatile Routing Platform
WAN Wide Area Network
PUBLIC
Classification: PUBLIC Use
Project Name: Saudi Mobily ITN Project SED No: W-3968-ATN-01-EXP(REL)-01 City/District: Makkah/West
Site Code: WR_3968 Job No.: W-3968-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3968-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A
PUBLIC
Etihad Etisalat
Data Network Department
Technical Document
Customer Name: WR_3968
Version: 1.0
Contents
4.0 IP Addresses………………………………………………………………………………………………………..………….......
5.0 Note…………..………………………………………………………………………………………………………..………….......
Mobily DN 2
Etihad Etisalat
Data Network Department
Under this expansion 2x 10G SFPs (10G-LC-SM-10KM) will be installed in slot/port 0/2/1 & 0/2/3 to serve as
down-link connection under ITN Project
Below are the SFP Details which are Relocated from the Site WR_2399
Mobily DN 3
Etihad Etisalat
Data Network Department
Customer Location
WR_3968 located in Makkah. Co-ordinates and Escalation Matrix are as below.
21.402600 ERICSSON
Makkah WR_3968 MONOPOLE ERICSSON MONOPOLE
39.898200 OUTDOOR RACK OUTDOOR RACK
Open Access
Mobily DN 4
Etihad Etisalat
Data Network Department
N/A
Mobily DN 5
Etihad Etisalat
Data Network Department
Mobily DN 6
Etihad Etisalat
Data Network Department
Mobily DN 7
Etihad Etisalat
Data Network Department
Mobily DN 8
Etihad Etisalat
Data Network Department
Mobily DN 9
Etihad Etisalat
Data Network Department
2.3 Logical Diagram
Mobily DN 10
Etihad Etisalat
Data Network Department
Mobily DN 11
Etihad Etisalat
Data Network Department
Mobily DN 12
Etihad Etisalat
Data Network Department
ATN POWER Connectivity Detail
SWITCH POWER TYPE EXISTING Power Source ATN CB/FUSE # RATING
NOTE
For a running ATN 910C, you must turn on the switches of both AC power modules operating in 1+1
backup mode.
Standard Voltage of the Input Power Supply Allowed Voltage Range for AC Equipment
200V ~ 240V
Standard Voltage of the Input Power Supply Allowed Voltage Range for DC Equipment
- 48 V - 38.4 V to - 57.6 V
- 60 V - 48 V to - 72 V
Equipment Max. Power Max. Recommended Fuse Capacity Rule for Selecting a Proper
Consumption Working Fuse (Power
Current Distribution Cabinet)
ATN 910I 35W AC: 0.8A DC: AC: 1 A (5A is recommended.) DC:
ATN 910B 68W AC: 1.2A DC: AC: 1.5A (5A is recommended.) DC: Rated working current
ATN 980B 1200W AC: 12A DC: AC: 15A (16A is recommended.)
CAUTION Before the equipment is powered on, you must use the multimeter to test whether a short-circuit occurs between the
positive and negative terminals of the PDU.
Mobily DN 13
Etihad Etisalat
Data Network Department
3.1 Hardware
W3968-IASW-HU01:
OMXD30002.Optical
Transceiver(SFP+,1550nm,9.95~11.1Gb 0/2/0 1 Uplink
10G SFP
/s,-4.7~4dBm,-14.1dBm,LC,SM,40km) MA19420940284 Connectivity
OSX001002.Optical
Transceiver(SFP+,1310nm,10Gb/s,- interface
10G SFP 8.2~0.5dBm,- GigabitEthernet0/2/1 01 MA20161541089
12.6dBm,LC,SM,10km))
Downlink Connectivity
OSX001002.Optical
Transceiver(SFP+,1310nm,10Gb/s,- interface
10G SFP 8.2~0.5dBm,- GigabitEthernet0/2/3 01 HB204000170352
12.6dBm,LC,SM,10km))
Downlink Connectivity
Mobily DN 14
Etihad Etisalat
Data Network Department
5 NOTE:
Mobily DN 15
Etihad Etisalat
Data Network Department
6 Configuration Template
sysname W3968-IASW-HU01#
Mobily DN 16
Etihad Etisalat
Data Network Department
Mobily DN 17
Etihad Etisalat
Data Network Department
vlan 201
Mobily DN 18
Etihad Etisalat
Data Network Department
Mobily DN 19
Etihad Etisalat
Data Network Department
Mobily DN 20
Etihad Etisalat
Data Network Department
aaa
Mobily DN 21
Etihad Etisalat
Data Network Department
authentication-scheme default0
authentication-scheme default1
authentication-scheme default
authorization-scheme default
accounting-scheme default0
accounting-scheme default1
Mobily DN 22
Etihad Etisalat
Data Network Department
domain default0
domain default1
domain default_admin
authorization-scheme default
hwtacacs-server mobily-tacacs
recording-scheme cmd-record
interface Vlanif201
interface Ethernet0/0/0
undo shutdown
interface Eth-Trunk 0
portswitch
description (Eth-Trunk0)(10G)(West)(W3968-IASW-HU01-10GE0/2/0)-(West)(Eth-
Trunk2278)(MAK5-IUPE-HU02-10GE5/0/13)[CID: DF]
Mobily DN 23
Etihad Etisalat
Data Network Department
mode lacp-static
undo shutdown
interface GigabitEthernet0/2/0
eth-trunk 0
undo shutdown
undo dcn
interface GigabitEthernet0/2/1
undo shutdown
portswitch
undo shutdown
undo dcn
interface GigabitEthernet0/2/2
undo shutdown
undo dcn
Mobily DN 24
Etihad Etisalat
Data Network Department
interface GigabitEthernet0/2/3
undo shutdown
undo dcn
interface GigabitEthernet0/2/4
undo shutdown
undo dcn
interface GigabitEthernet0/2/5
undo shutdown
undo dcn
interface GigabitEthernet0/2/6
undo shutdown
undo dcn
interface GigabitEthernet0/2/7
undo shutdown
undo dcn
Mobily DN 25
Etihad Etisalat
Data Network Department
interface GigabitEthernet0/2/8
undo shutdown
undo dcn
interface GigabitEthernet0/2/9
undo shutdown
undo dcn
interface GigabitEthernet0/2/10
undo shutdown
undo dcn
interface GigabitEthernet0/2/11
undo shutdown
undo dcn
interface GigabitEthernet0/2/12
undo shutdown
undo dcn
Mobily DN 26
Etihad Etisalat
Data Network Department
interface GigabitEthernet0/2/13
undo shutdown
undo dcn
interface GigabitEthernet0/2/14
undo shutdown
undo dcn
interface GigabitEthernet0/2/15
undo shutdown
undo dcn
interface GigabitEthernet0/2/16
undo shutdown
undo dcn
interface GigabitEthernet0/2/17
undo shutdown
undo dcn
Mobily DN 27
Etihad Etisalat
Data Network Department
interface GigabitEthernet0/2/18
undo shutdown
undo dcn
interface GigabitEthernet0/2/19
undo shutdown
undo dcn
interface GigabitEthernet0/2/20
undo shutdown
undo dcn
interface GigabitEthernet0/2/21
undo shutdown
undo dcn
interface GigabitEthernet0/2/22
portswitch
undo dcn
Mobily DN 28
Etihad Etisalat
Data Network Department
interface GigabitEthernet0/2/23
undo shutdown
undo dcn
interface GigabitEthernet0/2/24
undo shutdown
undo dcn
interface GigabitEthernet0/2/25
undo shutdown
undo dcn
interface GigabitEthernet0/2/26
undo shutdown
undo dcn
interface GigabitEthernet0/2/27
undo shutdown
undo dcn
Mobily DN 29
Etihad Etisalat
Data Network Department
interface NULL0
undo dcn
snmp-agent
snmp-agent group v3 nce noauthentication read-view huawei-view write-view huawei-view notify-view huawei-
view
Huawei@123
Huawei@123
Mobily@123
Mobily@123
Mobily DN 30
Etihad Etisalat
Data Network Department
snmp-agent target-host trap address udp-domain 10.73.98.20 params securityname u2000 v3 privacy private-
netmanager
snmp-agent target-host trap address udp-domain 10.83.212.52 params securityname u2000 v3 privacy private-
netmanager
snmp-agent target-host trap address udp-domain 10.14.161.168 params securityname MobilyOSS-1 v3 privacy
snmp-agent target-host trap address udp-domain 10.64.161.168 params securityname MobilyOSS-1 v3 privacy
snmp-agent target-host trap address udp-domain 10.73.52.79 params securityname nceuser v3 privacy
snmp-agent target-host trap address udp-domain 10.83.14.77 params securityname nceuser v3 privacy
Huawei@123
Huawei@123
Mobily@123
Mobily@123
Mobily123
Mobily123
Huawei123
Mobily DN 31
Etihad Etisalat
Data Network Department
Huawei123
lldp enable
Mobily DN 32
Etihad Etisalat
Data Network Department
Mobily DN 33
Etihad Etisalat
Data Network Department
user-interface con 0
authentication-mode password
user-interface vty 0 4
authentication-mode aaa
return
commit
=======================================================================================
Mobily DN 34
Etihad Etisalat
Data Network Department
Floor Plan:
Mobily DN 33
Etihad Etisalat Company
Hardware Relocation Form
PROJECT EQUIPMENTS
The Project Team representatives formally perform Hardware Relocation on operational routers as the following:
# Item Description From Site Slot To Site Slot SN
The undersigned Project team representative(s) formally performing Hardware Relocation, and the period between dismantling and
installing will be under project responsibility in case of card damage (misuse, stolen, broken)
Project team Representative(s)
Name Name
Position Position
Signature Signature
Date Date
Name Name
Position Position
Signature Signature
Date Date