This is to certify that the report on the topic “CONSTRUCTION OF
HIGH SCHOOL BUILDING” is a original work, carried out by HASHIM
KHAN (1JS17CV011) who is a bonafide student of “JSS ACADEMY OF
TECHNICAL EDUCATION” for the subject
“INTERNSHIP/PROFESSIONAL PRACTICE (17CV84)” in partial
fulfillment for the award of “Bachelor of Engineering in Civil Engineering of
Visveswaraya Technological University, BELGAUM during the academic
year 2020-2021.
The report has been approved and it satisfies the academic requirement
with respect to the INTERNSHIP/PROFESSIONAL PRACTICE (17CV84)
prescribed for the Bachelor of Engineering Degree.
Date: Place:
I thank my guide, Prof. PRAMUKH N, who took time out of his busy schedule, for
providing me the necessary guidance and timely suggestions, during my course of
work
I would like to express my gratitude to all the staff and management of “HW
CONSTRUTIONS PVT LTD” for providing me an opportunity to carry out my
internship practice.
I take this opportunity to express sincere gratitude and thanks to entire Civil
Engineering Department faculty for their constant support and encouragement.
Finally, I thank my parents who have stood before me for providing the best
education.
(USN) : 1JS17CV011
JSS ACADEMY OF TECHNICAL EDUCATION, BANGALORE-60
Course Bloom
Description (Student will be able to)
Outcome Level
Apply the knowledge of engineering with professional ethics in context
C412.1 L3
to advancements in technology.
Interpret the theoretical knowledge of Civil Engineering fundamentals
C412.2 L5
with practical problems related to industry
Examine about design solutions for engineering problems with respect
C412.3 L4
to environment and sustainability.
Conclude about the observations and knowledge learnt in the form of
C412.4 L4
documents, reports and presentations.
CO-PO Mapping
PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12
C412.1 3 2 3 2
C412.2 3 2 3 2 2
C412.3 3 3
C412.4 3
C412 3.00 2.00 3.00 3.00 2.00 3.00 3.00 2.00 2.00 3.00 3.00 2.00
CO-PSO Mapping
TOPIC PAGE No
1. Company Profile 1
4. Reflection 7
6. Conclusions 10
7. Internship Certificate 11
1. COMPANY PROFILE
They believe in creating value and delighting our customers by ensuring thier dream
come true. It is this drive that has made it possible for us to develop over 25 Lakh+
Sq.ft since 1996.
They have been one of the Top Construction Companies in Bangalore since last two
decades
Company takes Quality Testing & Safety Check on high priority and ensures best in
class project is delivered to customers.
1
2. ABOUT THE COMPANY
HW constructions is fully equipped with machineries and tools in accordance with the
applicable regulation of the federal ministry of works and urban development and has
been participating in different region of Bangalore. Rendering service of high quality,
timelines and coast effective management schemes are principal concern.
Vision
Mission
In general, the company’s mission is “to make its presence felt in the development of the
Country’s economy and the preservation of its social values while remaining target full in the
dynamism of the business world.”
2
3. TASK PERFORMED
Safety helmet: These are used for protecting the head from the materials that falls from
the top.
Safety belt: It is used while working at the edge of the building, lift area, shafts etc. to
catch if someone slips or falls.
Safety shoe: To prevent from foot injuries.
Welding shield, goggles, gloves: To prevent eyes from fire sparks, during the welding
process or while cutting the iron rods.
Gum boots: It is used while mixing the mortar, and while concreting the slab.
Safety net/catch net: Safety nets are tied around the building and below every floors so
that whenever someone falls the net catches the person or also to catch the things that
falls from the top.
PT Beams
In Building construction, post tensioning allows longer clear spans, fewer beams and
more slender,dramatic elements. The advantage of post-tensioning is that beam slabs can
be continuous, i.e, a single beam can run continuously from one end of the building to the
other.
The tendons are laid out in the forms in accordance with installation drawings that
indicate how they are to be spaced, what their profileshould be, and where they are to be
stressed. After the concrete is placed and has reached its required strength the tendons are
stressed and anchored.
3
Picture 1 : PT Beam reinforcement
4
SLAB CONSTRUCTION:
S1
S2
5
CONCRETING
Concrete production is time-sensitive. Once the ingredients are mixed, workers must put
the concrete in place before it hardens.
In modern usage, most concrete production takes place in a large type of industrial
facility called a concrete plant, or often a batch plant.
For this reason equipment and methods should be capable of effectively mixing concrete
materials containing the largest specified aggregate to produce uniform mixtures of the
lowest slump practical for the work.
After finishing of reinforcement work and shuttering it is time for casting. Slab, beam,
staircase were casted at time. In our site we used concrete mix ratio of M40.
6
4. REFLECTION
This Internship was an useful experience and gained a lot of knowledge about the
structures.
I am able to identify the procedure of building, space work, post tension slabs, and
concreting.
I also learnt about the safety rules to be followed at the construction site.
This project gave me more knowledge regarding the latest methods, technology
employed, and the workmanship and skill in executing the project.
7
5. PHOTOGRAPHS
8
9
6. CONCLUSIONS
This Internship was an useful experience and gained a lot of knowledge about the
structures.
I am able to identify the procedure of building, space work, post tension slabs, and
concreting.
I also learnt about the safety rules to be followed at the construction site.
This project gave me more knowledge regarding the latest methods, technology
employed, and the workmanship and skill in executing the project.
This was an interesting experience to work in an enthusiastic team and understood the
industrial requirements from the graduates.
To co-relate between the theoretical and the practical knowledge about the civil
engineering works during the internship
Hopefully, this internship will make an impact in my carrier to get placed in companies.