Concrete Collars For Pipe or Box Culvert Extensions 33.1
Concrete Collars For Pipe or Box Culvert Extensions 33.1
8 8 Existing Headwall The concrete will be paid for at the contract unit price per cubic
yard for CONCRETE COLLAR. Reinforcement will be paid for
at the contract unit price per pound for REINFORCEMENT BARS.
Expansion Bolts, when required, will be paid for at the contract unit
price each for EXPANSION BOLTS of the size indicated, which price
12
shall include furnishing, drilling holes, and installing the expansion
bolts complete in place. These bolts shall extend at least 8 inches
U Bars into the new concrete.
3/4 } Exp.
Bolts
Total 4 0.3 20 (See Table for Spacing) 12 12
All h Bars 18 Long
REMOVE PORTION OF
ALL DIMENSIONS ARE IN INCHES
Proposed Pipe or HEADWALL IF NEEDED
UNLESS OTHERWISE NOTED.
Box Culvert Extension
NO. 4 h
PLAN OF CULVERT WITH STRAIGHT HEADWALL
BARS AT 12
Existing Box Culvert
CTS.
3/4 } Exp.
8 8 12 Bolts
U1 Bar U Bar U Bar
(See Table for Spacing)
12
BARS* AT 12
Concrete Wingwall
12
Removal
Existing Box Culvert
NO. 4 h
Clear Height
U Bar
h Bar U1 Bar
Existing Culvert Clear
No. 4 h Span
Bars at 12
Cts. (TOP ONLY)
No. 4 h
Bars at 12
Lap Bars SIDE
Cts. Each Side
PROPOSED PIPE OR 16
SIDE
BOX CULVERT EXTENSION 8 3/4 } Exp.
3/4 } EXPANSION BOLT
Bolts
2 - #4 U BARS
(See Table for Spacing)
PLAN OF CULVERT WITH ANGLED WING WALLS & 1 - #4 U1 BARS
Proposed Pipe or
Box Culvert Extension PER COLLAR
FRONT PLACEMENT DETAILS
Proposed Pipe or FOR EXPANSION BOLTS
Box Culvert Extension
NUMBER OF EXPANSION BOLTS REQUIRED PER SIDE
EXTENSIONS < 15’ EXTENSIONS > 15’
12 12
H OR S NUMBER SPACING NUMBER SPACING
No. 4 h Bars
U OR U1 BARS at 12 Cts.
24 * *
30 2 18 2 18
Y
X
h BARS 36 2 24 2 24
HEIGHT
(H)
48 3 18 3 18
72 5 15 4 20
Proposed
Existing
Culvert
8 8 Culvert 84 5 18 4 24
96 15 21
6 5
108 19 24
6 5
120 18 21
Z 7 6