DUBAL POWER & DESALINATION ELECTRICAL MAINTENANCE PROCEDURES MNT/P&D/EM/TSK.03.03.01.

F128

GE MULTILIN SR 750 MULTIFUNCTION PROTECTION RELAY TEST SHEET -


MNT/P&D/EM/TSK.03.03.01.F128

SUBSTATION: PLANT NO.: FEEDER NAME:


RELAY TYPE: SERIAL NO.:
RELAY FUNCTION: V/T RATIO:
C/T RATIO: AUX. SUPPLY:

MWH readings before calibration MWH readings after calibration


MVARH readings before calibration MVARH readings after calibration

DATE
No. MASTER INSTRUMENT MANUFACTURER TAG SERIAL NO.
CALIBRATED
1
2
3

1. PHASE CURRENT ACCURACY TEST


Current Current Current
Injected
Expected Phase-A Phase-B Phase-C
current
current (A) Measured Measured Measured
(A) % Error % Error % Error
(A) (A) (A)
0
0.25
0.5
0.75
1.0

2. GROUND CURRENT ACCURACY TEST


Injected Ground current
Expected current(a)
current(A) Measured (A) % Error
0
0.25
0.5
0.75
1.0

3. VOLTAGE INPUT ACCURACY TEST


Voltage (A-B) Voltage (B-C) Voltage (C-A)
Applied Expected
Voltage Voltage
Measured(v) % Error Measured(v) % Error Measured(v) % Error

0
27.5
55
82.5
110

4. KWH ENERGY CALIBRATIONS


Recorded Energy
Load Power Factor
File: MNTP&DEMTSK030301F128.doc Revision: 0 (05-Oct-2011) Page 1 of
3
DUBAL POWER & DESALINATION ELECTRICAL MAINTENANCE PROCEDURES MNT/P&D/EM/TSK.03.03.01.F128

5. KVARH ENERGY CALIBRATIONS


Recorded Energy
Load Power Factor
Substandard Meter Under Test % Error
100% 1.0 / 0.0
75% 1.0 / 0.0
50% 1.0 / 0.0
100% 0.9 Lag
75% 0.9 Lag
50% 0.9 Lag

6. PHASE CURRENT AND GROUND CURRENT FUNCTION TEST


Phase current Current setting Time multiplier Curve Inst: setting Time
function test
Ground Current setting Time Multiplier Curve Inst: setting Time
current
function test

Current Injected Theoretical Time Actual Time


Current Setting Current Multiplier Time Multiplier
(Amp) (Sec) (Sec)

Current Injected Theoretical Time Actual Time


Current Setting Current Multiplier Time Multiplier
(Amp) (Sec) (Sec)

Current Injected Theoretical Time Actual Time


Current Setting Current Multiplier Time Multiplier
(Amp) (Sec) (Sec)

Current Injected Theoretical Time Actual Time


Current Setting Current Multiplier Time Multiplier
(Amp) (Sec) (Sec)

E/F

6.1. Operating time checking at normal setting


Current Injected Theoretical Time Actual Time
Current Setting Current Multiplier Time Multiplier
(Amp) (Sec) (Sec)
RÆ 2
YÆ 2
BÆ 2
E/F 2

File: MNTP&DEMTSK030301F128.doc Revision: 0 (05-Oct-2011) Page 2 of


3
DUBAL POWER & DESALINATION ELECTRICAL MAINTENANCE PROCEDURES MNT/P&D/EM/TSK.03.03.01.F128

6.2. Minimum Operating Current at normal setting


Current Setting Time Multiplier Pickup (Amp)



E/F

6.3. Instantaneous function at normal setting


Current Setting Pickup (Amp)



E/F

Neutral inst o/c setting Time setting Operated at Time(s)

Sensitive ground inst o/c setting Time setting Operated at(A) Time (s)

Ref current setting Time setting Operated at(A) Time (s)

Bus under voltage setting Time setting Operated at(A) Time (s)

7. OUT PUT RELAY CHECKS


Relays R1 R2 R3 R4 R5 R6 R7 R8
Relay operation

8. NORMALIZING
Relay contacts checked O Initial relay settings O Flags checked/reset O
Relevant spare parts details collected
K / entered in MNT/P&D/EM/TSK.
restored K 03.02.20.F01 O
K
K

COMMENTS :

CHECKED BY EMP.NO DAT


ENGINEER : EMP.NO DAT
. E
NEXT CHECK DUE
DATE :

File: MNTP&DEMTSK030301F128.doc Revision: 0 (05-Oct-2011) Page 3 of


3