Professional Documents
Culture Documents
Sr. No. Item L B THK Length
Sr. No. Item L B THK Length
Diff
3 Reinforcement Steel Assume, Steel req. per cubic meter of concrete i.e. (Kg/Cum) = 80 3 Reinforcement Steel Assume, Steel req. per cubic meter of concrete i.e. (Kg/Cum) = 80
Mt. 0.000 Mt. 0.000 0.000