Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Input Input

Sr. No. Item L B Thk Length Sr. No. Item L B Thk Length
1 Plain Cement Concrete (PCC) 0.075 1 Plain Cement Concrete (PCC) 0.075
2 Size of Cable Trench - Section A-A 1.05 1.1 0.125 18.7 2 Size of Cable Trench - Section A-A 1 1.65 0.15 18.3
Size of Cable Trench - Section B-B 1.75 Size of Cable Trench - Section B-B
Size of Cable Trench - Section C-C 1.5 Size of Cable Trench - Section C-C 1.5 2.4 0.2 29.5
Size of Cable Trench - Section D-D 0.75 Size of Cable Trench - Section D-D 1 1 0.15 12.3
Size of Cable Trench - Small 0.45 Size of Cable Trench - Small 0.45 0.45 0.1 25

Sr. No. Item L Diff


1 Plain Cement Concrete (PCC)
2 Size of Cable Trench - Section A-A 1
Size of Cable Trench - Section B-B
Size of Cable Trench - Section C-C 1.5 0.00
Size of Cable Trench - Section D-D 1
Size of Cable Trench - Small 0.45

2 D Qty Total Qty. Sr. No. Item Unit


1 Plain Cement Concrete (PCC) 1 18.3 3.65 0.15 10.02
0.075 0.00 Section A-A M3 1 0 0 0 0
0.075 0.00 Section B-B M3 1 29.5 5.4 0.2 31.86 50.79 -50.79
0.075 0.00 0.00 Section C-C M3 1 12.3 3 0.15 5.535
0.075 0.00 Section D-D M3 1 25 1.35 0.1 3.375
1 0 0.15 0.075 0.00 Small Trench M3
3 Reinforcement Steel Assume, Steel req. per cubic meter of concrete i.e. (Kg/Cum) = 80
Mt. 0.000 Mt. 4.063 -4.063

You might also like