Professional Documents
Culture Documents
Design of Footing:: B D Diff
Design of Footing:: B D Diff
075
Size of Cab 1 1.65 0.15 18.3
3 Reinforcement Steel Assume, Steel req. per cubic meter of concrete i.e. (Kg/Cum) = 80 3 Reinforcement Steel Assume, Steel req. per cubic meter of concrete i.e. (Kg/Cum) = 80
Mt. 0.000 Mt. 0.000 0.000