Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

HYDRAULIC MISR

o J9jaio LEEA
Fult Member

REPORT OF THOROUGH EXAMINATION


This report complies with the requirements of the Lifting Operations and Liftng Equipment Regulations 1998

Date of Thorough Examination: Date of Report: Report number:


19 April, 2022 19 April, 2022 EGYD243-1
Name and Address of employer for whom the Address of premises at which the examination was
thorough
examination was made: made:

EGY DRILL PO 10h of Ramadan City. Cairo, Egypt


Cairo. Egypt REF: L-11520-22
Minimum Date of Date of last
Description and identification of the equipment: breaking manufacture if thorough
known: examination:
Load(s):

x Termination
5RHLL, of steel wire rope 26.0 mm nominal diameter, 35x7
galvanised, hard eye at one end. plain at other end.
19 April, 2022 19 April, 2022
NIA
Serials: EGYD-THM26-1 to EGYD-THM26-5

Was the examination carried out:


Is this the first examination after
YES NO Within an interval of 6 months? YES NO
installation or assembly at a new site or
location? Within an interval of 12 months? YES NO

If the answer to the above question is In accordance with an


YES NO examination scheme?
YES NO N
YES has the equipment been installed
After the occurrence of
correctly? YES NO
exceptional circumstances?
Identification of any part found to have a defect which is or could become a danger to persons and a description of the
defect:
(if none state NONE)
None

Is the above an existing orimminent dangerto persons YES NO


Is the above a defect which is not yet but could become a danger to persons
YES by
(If YES state the date bywhen)
Particulars of any repair, renewal or alteration required to remedy the defect identified above:

None

Particulars of any tests carriedout as part ofthe examination: (if none stateNONE)
Wire rope have been terminated in accordance with BS EN 13411-3.2004+A1:2008 and was found to be free from any defects
and flows at time of inspection.

IS THIS EQUIPMENT SAFE TO OPERATE? YES NO


Name of person signing or
Name &Qualifications of person authenticating this report on behalf of
Latest date by which next thorough
making this report: examination must be carried out:
the autho:
Islam Shaheen Mohamed yasheen
LEEA LEG, LMM, OTC, pCE, MCE Signature:
18 Oct., 2022

Name and address of employer of persons making and authenticating this report
Hydraulic Misr
7 Nozha St., Madnet Nasr, Cairo, Egypt EPT
sales@hydraulicmisr.com +202 24 19 85 19 7 Secon Building-Elnozha St.
www.hydraulicmisr.net +20224 19 86 95 Nasr City, Cairo, Egypt.

You might also like