中国交通建设股份有限公司

Renardet S.A., Switzerland in association with Government of Nepal


CHINA COMMUNICATIONS CONSTRUCTION COMPANY.LTD
Soil Test (P) Ltd., Nepal and CEMAT Consultants Ministry of Physical Infrastructure and Transport
(P) Ltd., Nepal Department of Roads

Contract No: SMHIP/OCB/MAP/01


Project Directorate (ADB)- SASEC Highway Improvement Phase I Project
Mugling-Anbukhaireni-Pokhara Road Project Section-1 (KM8+250-KM49+700)

DRAWING FOR WORK


WORKING DRAWING OF BRICK MASONRY WALL WATER TANK Km 43 & Km 44
VISION DATE PAGE TOTAL
A 2022.06.13 06
B
C
D
E
Contractor Consultant Employer

Renardet S.A., Switzerland in association with


中国交通建设股份有限公司 Soil Test (P) Ltd., Nepal and CEMAT Government of Nepal Ministry of Physical Infrastructure and Transport
CHINA COMNUNICATIONS CONSTRUCTION COMPANY.LTD Consultants (P) Ltd., Nepal Department of Roads
Signature Signature Signature

DATE:13 June 2022 DATE: DATE:


1.23 0.45
1.275 1.275

1.23

2.54
3

2.54
3
1.32
1.32
2.54 2.54
3
3

0.45 0.45
1.275 1.275

0.45
2.15
1.69

0.125

2.54
3

Note:
1.All dimensions are in m unless noted otherwise.
2.This drawing are used in Water Tank construction.
3. The concrete grade is M20/20.

EMPLOYER: CONSULTANT: CONTRACTOR: PROJECT: SASEC Mugling–Pokhara Highway Improvement Phase-I Designed By : SCALE As shown
Government of Nepal Project – (SMPHIP)
Renardet S.A., Switzerland Checked By : DATE: Jun.2022
Ministry of Physical Infrastructure and Transport China Communication Construction Company Ltd. ADB Loan No. 3846 NEP
in association with Mugling – Anbukhaireni – Pokhara Road (Section-1)
Department of Roads Verified By : DRG NO :
Soil Test (P) Ltd., Nepal and
Project Directorate (ADB)
CEMAT Consultants (P) Ltd., Nepal
(C.C.C.C) Contract No: SMHIP/OCB/MAP/01
Bishalnagar, Kathmandu, Nepal (Km 8+250 to Km 49+700) Approved By : SHEET NO :
0.23 0.23
0.6 0.2

0.23
0.43 0.43

1.06
0.6
1.06

0.6
0.6

0.43
1.06 1.06

0.2 0.2
0.43 0.43

0.2
1.06

0.125
0.705

0.6 1.06
1.06

Note:
1.All dimensions are in m unless noted otherwise.
2.This drawing are used in Water Tank construction.
3. The concrete grade is M20/20.

EMPLOYER: CONSULTANT: CONTRACTOR: PROJECT: SASEC Mugling–Pokhara Highway Improvement Phase-I Designed By : SCALE As shown
Government of Nepal Project – (SMPHIP)
Renardet S.A., Switzerland Checked By : DATE: Jun.2022
Ministry of Physical Infrastructure and Transport China Communication Construction Company Ltd. ADB Loan No. 3846 NEP
in association with Mugling – Anbukhaireni – Pokhara Road (Section-1)
Department of Roads Verified By : DRG NO :
Soil Test (P) Ltd., Nepal and
Project Directorate (ADB)
CEMAT Consultants (P) Ltd., Nepal
(C.C.C.C) Contract No: SMHIP/OCB/MAP/01
Bishalnagar, Kathmandu, Nepal (Km 8+250 to Km 49+700) Approved By : SHEET NO :
1.23 0.45
1.275 1.275

1.23

2.54
3

2.54
3
1.32
1.32
2.54 2.54
3
3

0.45 0.45
1.275 1.275

0.45
2.15
1.69

0.125

2.54
3

Note:
1.All dimensions are in m unless noted otherwise.
2.This drawing are used in Water Tank construction.
3. The concrete grade is M20/20.

EMPLOYER: CONSULTANT: CONTRACTOR: PROJECT: SASEC Mugling–Pokhara Highway Improvement Phase-I Designed By : SCALE As shown
Government of Nepal Project – (SMPHIP)
Renardet S.A., Switzerland Checked By : DATE: Jun.2022
Ministry of Physical Infrastructure and Transport China Communication Construction Company Ltd. ADB Loan No. 3846 NEP
in association with Mugling – Anbukhaireni – Pokhara Road (Section-1)
Department of Roads Verified By : DRG NO :
Soil Test (P) Ltd., Nepal and
Project Directorate (ADB)
CEMAT Consultants (P) Ltd., Nepal
(C.C.C.C) Contract No: SMHIP/OCB/MAP/01
Bishalnagar, Kathmandu, Nepal (Km 8+250 to Km 49+700) Approved By : SHEET NO :
1.23 0.45
1.275 1.275

1.23

2.54
3

2.54
3
1.32
1.32
2.54 2.54
3
3

0.45 0.45
1.275 1.275

0.45
2.15
1.69

0.125

2.54
3

Note:
1.All dimensions are in m unless noted otherwise.
2.This drawing are used in Water Tank construction.
3. The concrete grade is M20/20.

EMPLOYER: CONSULTANT: CONTRACTOR: PROJECT: SASEC Mugling–Pokhara Highway Improvement Phase-I Designed By : SCALE As shown
Government of Nepal Project – (SMPHIP)
Renardet S.A., Switzerland Checked By : DATE: Jun.2022
Ministry of Physical Infrastructure and Transport China Communication Construction Company Ltd. ADB Loan No. 3846 NEP
in association with Mugling – Anbukhaireni – Pokhara Road (Section-1)
Department of Roads Verified By : DRG NO :
Soil Test (P) Ltd., Nepal and
Project Directorate (ADB)
CEMAT Consultants (P) Ltd., Nepal
(C.C.C.C) Contract No: SMHIP/OCB/MAP/01
Bishalnagar, Kathmandu, Nepal (Km 8+250 to Km 49+700) Approved By : SHEET NO :
1.025 0.45
1.025 1.025

1.025

2.04

2.15
1.69
2.5

1.025
1.025 2.04
2.04 2.5
2.5

0.45
1.025 1.025
0.45
1.795

0.45
2.15

0.125
2.5
2.04
2.5

Note:
1.All dimensions are in m unless noted otherwise.
2.This drawing are used in Water Tank construction.
3. The concrete grade is M20/20.

EMPLOYER: CONSULTANT: CONTRACTOR: PROJECT: SASEC Mugling–Pokhara Highway Improvement Phase-I Designed By : SCALE As shown
Government of Nepal Project – (SMPHIP)
Renardet S.A., Switzerland Checked By : DATE: Jun.2022
Ministry of Physical Infrastructure and Transport China Communication Construction Company Ltd. ADB Loan No. 3846 NEP
in association with Mugling – Anbukhaireni – Pokhara Road (Section-1)
Department of Roads Verified By : DRG NO :
Soil Test (P) Ltd., Nepal and
Project Directorate (ADB)
CEMAT Consultants (P) Ltd., Nepal
(C.C.C.C) Contract No: SMHIP/OCB/MAP/01
Bishalnagar, Kathmandu, Nepal (Km 8+250 to Km 49+700) Approved By : SHEET NO :
1.025 0.45
1.025 1.025

1.025

2.04

2.15
1.69
2.5

1.025
1.025 2.04
2.04 2.5
2.5

0.45
1.025 1.025
0.45
1.795

0.45
2.15

0.125
2.5
2.04
2.5

Note:
1.All dimensions are in m unless noted otherwise.
2.This drawing are used in Water Tank construction.
3. The concrete grade is M20/20.

EMPLOYER: CONSULTANT: CONTRACTOR: PROJECT: SASEC Mugling–Pokhara Highway Improvement Phase-I Designed By : SCALE As shown
Government of Nepal Project – (SMPHIP)
Renardet S.A., Switzerland Checked By : DATE: Jun.2022
Ministry of Physical Infrastructure and Transport China Communication Construction Company Ltd. ADB Loan No. 3846 NEP
in association with Mugling – Anbukhaireni – Pokhara Road (Section-1)
Department of Roads Verified By : DRG NO :
Soil Test (P) Ltd., Nepal and
Project Directorate (ADB)
CEMAT Consultants (P) Ltd., Nepal
(C.C.C.C) Contract No: SMHIP/OCB/MAP/01
Bishalnagar, Kathmandu, Nepal (Km 8+250 to Km 49+700) Approved By : SHEET NO :