DASHBOARD 26 November - 25 December BASE ON FILM
DASHBOARD 26 November - 25 December BASE ON FILM
PRR
PRR MONTHLY RECORD
MONTH TOTAL TEST TOTAL FAILED PRR
January n/a n/a n/a
February n/a n/a n/a
March n/a n/a n/a
April n/a n/a n/a
May n/a n/a n/a
June n/a n/a n/a
July n/a n/a n/a
August n/a n/a n/a
September n/a n/a n/a
October n/a n/a n/a
November n/a n/a n/a
December 5 0 0.00%
TOTAL YEAR TO DATE 5 0 0.00%
QN
QN CLOSE QN OPEN
MONTH ON TIME OVERDUE Total ON TIME OVERDUE
JANUARY n/a n/a n/a n/a n/a
FEBRUARY n/a n/a n/a n/a n/a
MARCH n/a n/a n/a n/a n/a
APRIL n/a n/a n/a n/a n/a
MAY n/a n/a n/a n/a n/a
JUNE n/a n/a n/a n/a n/a
JULY n/a n/a n/a n/a n/a
AUGUST n/a n/a n/a n/a n/a
SEPTEMBER n/a n/a n/a n/a n/a
OCTOBER n/a n/a n/a n/a n/a
NOVEMBER 1 0 1 1 0
DECEMBER n/a n/a n/a n/a n/a
TOTAL 1 0 1 1 0
Dossier
Dossier CLOSE Dossier OPEN
MONTH ON TIME OVERDUE Total ON TIME OVERDUE
JANUARY n/a n/a n/a n/a n/a
FEBRUARY n/a n/a n/a n/a n/a
MARCH n/a n/a n/a n/a n/a
APRIL n/a n/a n/a n/a n/a
MAY n/a n/a n/a n/a n/a
JUNE n/a n/a n/a n/a n/a
JULY n/a n/a n/a n/a n/a
AUGUST n/a n/a n/a n/a n/a
SEPTEMBER n/a n/a n/a n/a n/a
OCTOBER n/a n/a n/a n/a n/a
NOVEMBER n/a n/a n/a n/a n/a
DECEMBER n/a n/a n/a n/a n/a
TOTAL 0 0 0 0 0
N OPEN OTD 1 . YTD: Total Close On Time / (Total Close + Total Open Overdue)
Total (%)
n/a #VALUE! 2. OTD: close on time / total close
n/a #VALUE!
n/a #VALUE!
n/a #VALUE!
n/a #VALUE!
n/a #VALUE!
n/a #VALUE!
n/a #VALUE!
n/a #VALUE!
n/a #VALUE!
1 100.00%
n/a #VALUE!
1
YTD 100.00%
YTD #DIV/0!
pen Overdue)
pen Overdue)
QUALITY DASHBOARD
Executive Summary
PT. Asta Rekayasa Unggul
CONTRACT STATUS
CONTRACT RESPONSIBLE CONTRACTOR
NO CONTRACT NO CONTRACT TITLE
DEPARTMENT NAME REPRESENTATIVE
BEKAPAI 3 - SURFACE FACILITIES
Satya Pradipto.B /
1 4500010835 MODIFICATION AND DOGLEG PRJ/EXE/BKP Surya Gumilar
Benny Kurniadi
INSTALLATION (EPCIC)
OBJECTIVES ACHIEVEMENT
PERFORMANCE
NO DESCRIPTION TARGET
THIS MONTH REMARK YEAR TO DATE REMARK
J L
- N/A : Not available, no data measured on this time
Achieved Not Achieved
NO WELDING DEFECT
1 P / CP/ WH / GP Type of Welding Defect
2 IF / LOF / HB
3 IP
4 SI / ESI / ISI
5 TI
6 UC / RUC
7 CR
8 IC / RC / UF
9 BT
10 HL
11 .......
TOTAL 0 0.00%
Highlight Issues:
1 2 3 4 5 6 7 8 9 10 11
Page 5 of 22
QUALITY DASHBOARD
Executive Summary
PT. Asta Rekayasa Unggul
Page 6 of 22
QUALITY DASHBOARD
Executive Summary
PT. Asta Rekayasa Unggul
TOTAL 5 0 0.00%
CAUSE ANALYSIS OF
NO TOTAL %
PAINTING DEFECT Cause Analysis of Painting
1 Failure in Surface Preparation
2 Failure in Painting/Coating Layers Defect
3 ……….
TOTAL N/A N/a
Highlight Issues: 1
2
3
QUALITY NOTIFICATION
See Attachment 3 for Supporting Document
QN CLOSED+OPEN QN CLOSED
NO CONTRACT NO CONTRACT TITLE OTD (%)
OVER DUE ON TIME
BEKAPAI 3 - SURFACE FACILITIES
1 4500010835 MODIFICATION AND DOGLEG N/A N/A N/A
INSTALLATION (EPCIC)
CAUSE ANALYSIS OF
NO TOTAL %
QN OVERDUE
Cause Analysis of QN Overdue
1 Follow Up Action Awareness 1 100.00%
2 Windows Opportunity Constrain
3 ……….
TOTAL 1 100.00%
Highlight Issues:
100%
1 2 3
Page 7 of 22
QUALITY DASHBOARD
Executive Summary
PT. Asta Rekayasa Unggul
QC DOSSIER SUBMISSION
See Attachment 4 for Supporting Document
QC DOSSIER QC DOSSIER
NO CONTRACT NO CONTRACT TITLE SUBMISSION+ OPEN SUBMISSION OTD (%)
OVERDUE ON TIME
BEKAPAI 3 - SURFACE FACILITIES
1 4500010835 MODIFICATION AND DOGLEG N/A N/A N/A
INSTALLATION (EPCIC)
Highlight Issues:
1 2 3 4 5 6 7
Page 8 of 22
QUALITY DASHBOARD
Attachment
PT. ASTA REKAYASA UNGGUL
ATTACHMENT 1
WELDING REPAIR RATE (WRR)
WELDING INSPECTION REPORT
WELDING REPAIR RATE (WRR)
BEKAPAI 3 - SURFACE FACILITIES MODIFICATION AND DOGLEG INSTALLATION (EPCIC)
Contract Order : 4500010835
Period: 26 November - 25 December 2021
Location Welding Inspection (Radiography)
Sheet / Remarks
No. Date Size ITEM Description Drawing No. Folio Number Of Joint Number Of Film (Defect Type)
Yard Site Report No.
Joint Repair Film Repair
1 30-Nov-2021 8 mm 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 22 2 - 4 -
2 30-Nov-2021 8 mm 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 23 2 - 4 -
3 30-Nov-2021 8 mm 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 24 2 - 4 -
4 30-Nov-2021 8 mm 4500010835 VALVE & FG SCRUBBER ACCES PLATFORM FOR MWP-BH ID-BKP-MWPBH-2009-504009 1 OF1 X - 25 1 - 2 -
5 30-Nov-2021 8 mm 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 26 2 - 4 -
6 30-Nov-2021 8 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 27 4 - 8 -
7 30-Nov-2021 8 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 28 4 - 8 -
8 30-Nov-2021 8 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 29 4 - 8 -
9 30-Nov-2021 8 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 30 4 - 8 -
10 30-Nov-2021 8 mm 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 31 1 - 2 -
11 3-Dec-2021 8 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 32 6 - 12 -
12 3-Dec-2021 8 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 33 6 - 12 -
13 3-Dec-2021 8 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 34 6 - 12 -
14 3-Dec-2021 8 mm 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 35 1 - 2 -
8" Thk X -
15 3-Dec-2021 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 36 2 - 6 -
12,7 mm
8" Thk X -
16 3-Dec-2021 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 37 2 - 6 -
12,7 mm
8" Thk X -
17 3-Dec-2021 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 39 2 - 6 -
12,7 mm
18 3-Dec-2021 4" Sch 40 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 40 1 - 3 -
8" Thk X -
19 3-Dec-2021 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 41 2 - 6 -
12,7 mm
20 12-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 42 5 - 10 -
21 13-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 43 1 - 2 -
21 12-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 44 5 - 10 -
8 mm ,
20 7-Dec-2021 11 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 45 5 - 10 -
mm,
8 mm
21 7-Dec-2021 11 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 46 6 - 12 -
mm,
8 mm
22 7-Dec-2021 11 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 47 5 - 10 -
mm
23 8-Dec-2021 11 mm 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 48 4 - 8 -
24 8-Dec-2021 8 mm 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 49 4 - 8 -
Page 10 of 22
WELDING INSPECTION REPORT
WELDING REPAIR RATE (WRR)
BEKAPAI 3 - SURFACE FACILITIES MODIFICATION AND DOGLEG INSTALLATION (EPCIC)
Contract Order : 4500010835
Period: 26 November - 25 December 2021
Location Welding Inspection (Radiography)
Sheet / Remarks
No. Date Size ITEM Description Drawing No. Folio Number Of Joint Number Of Film (Defect Type)
Yard Site Report No.
Joint Repair Film Repair
25 8-Dec-2021 8 mm 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 50 4 - 8 -
26 10-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 51 5 - 7 - RSC (3 FILM)
27 13-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 52 1 - 2 -
28 10-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 53 5 - 10 -
29 12-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 54 4 - 8 -
29 10-Dec-2021 8 mm 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 55 5 - 10 -
30 10-Dec-2021 8 mm 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 56 5 - 10 -
31 11-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 57 5 - 10 -
32 11-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 58 5 - 9 - RSC (1 FILM)
33 11-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 59 5 - 10 -
34 11-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 60 5 - 10 -
35 11-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 61 5 - 9 - RSC (1 FILM)
36 11-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 62 5 - 9 - RSC (1 FILM)
37 12-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 63 5 - 10 -
38 13-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 64 5 - 10 - AFTER RSC (6 FILM)
39 12-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 65 5 - 10 -
40 13-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 66 4 - 8 -
41 12-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 67 5 - 10 -
42 12-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 68 5 - 10 -
43 12-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 69 5 - 10 -
44 13-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 70 4 - 8 -
45 17-Dec-2021 8 mm 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 71 4 - 8 -
8 mm ,
46 17-Dec-2021 11 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 72 5 - 10 -
mm,
8 mm
47 17-Dec-2021 11 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 73 5 - 10 -
mm
48 17-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 74 3 - 6 -
48 17-Dec-2021 8 mm 4500010835 UPPER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504024 1 OF1 X - 74A 1 - 2 -
49 18-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 75 4 - 8 -
Page 11 of 22
WELDING INSPECTION REPORT
WELDING REPAIR RATE (WRR)
BEKAPAI 3 - SURFACE FACILITIES MODIFICATION AND DOGLEG INSTALLATION (EPCIC)
Contract Order : 4500010835
Period: 26 November - 25 December 2021
Location Welding Inspection (Radiography)
Sheet / Remarks
No. Date Size ITEM Description Drawing No. Folio Number Of Joint Number Of Film (Defect Type)
Yard Site Report No.
Joint Repair Film Repair
50 18-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 76 4 - 8 -
51 18-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 77 4 - 8 -
52 18-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 78 4 - 8 -
53 18-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 79 4 - 8 -
54 19-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 80 4 - 8 -
55 19-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 81 4 - 8 -
56 19-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 82 4 - 8 -
57 19-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 83 4 - 8 -
58 19-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 84 4 - 8 -
59 19-Dec-2021 8 mm 4500010835 SUMP DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504016 1 OF1 X - 85 3 - 6 -
60 22-Dec-2021 11 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 86 4 - 8 -
61 22-Dec-2021 11 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 87 4 - 8 -
62 22-Dec-2021 11 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 88 4 - 8 -
63 22-Dec-2021 11 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 89 4 - 8 -
64 22-Dec-2021 11 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 90 4 - 8 -
65 22-Dec-2021 11 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 91 1 - 2 -
66 22-Dec-2021 11 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 92 4 - 8 -
67 23-Dec-2021 11 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 93 4 - 8 -
68 23-Dec-2021 11 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 94 4 - 8 -
69 23-Dec-2021 8 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 95 3 - 6 -
70 23-Dec-2021 11 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 96 4 - 8 -
71 23-Dec-2021 11 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 97 4 - 8 -
72 23-Dec-2021 11 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 98 4 - 8 -
73 24-Dec-2021 8 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 100 4 - 8 -
74 24-Dec-2021 8 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 101 4 - 8 -
75 24-Dec-2021 8 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 102 4 - 8 -
76 24-Dec-2021 8 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 103 2 - 4 -
Page 12 of 22
WELDING INSPECTION REPORT
WELDING REPAIR RATE (WRR)
BEKAPAI 3 - SURFACE FACILITIES MODIFICATION AND DOGLEG INSTALLATION (EPCIC)
Contract Order : 4500010835
Period: 26 November - 25 December 2021
Location Welding Inspection (Radiography)
Sheet / Remarks
No. Date Size ITEM Description Drawing No. Folio Number Of Joint Number Of Film (Defect Type)
Yard Site Report No.
Joint Repair Film Repair
77 24-Dec-2021 11 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 104 4 - 8 -
78 24-Dec-2021 8 mm 4500010835 LOWER DECK FRAMING PLAN FOR MWP-BH ID-BKP-MWPBH-2009-504023 1 OF1 X - 105 1 - 2 -
79 25-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 106 3 - 6 -
80 25-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 107 4 - 8 -
81 24-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 108 4 - 8 -
82 24-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 109 4 - 8 -
83 24-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 110 4 - 8 -
84 24-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 111 3 - 6 -
85 25-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 112 1 - 2 -
86 25-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 114 4 - 8 -
87 25-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 115 4 - 8 -
88 25-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 116 4 - 8 -
89 25-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 117 4 - 8 -
90 25-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 118 4 - 8 -
91 25-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 119 4 - 8 -
92 25-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 120 4 - 8 -
93 25-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 121 3 - 6 -
94 25-Dec-2021 8 mm 4500010835 CLOSE DRAIN PUMP DRUM PLATFORM ID-BKP-MWPBH-2009-504017 1 OF1 X - 122 3 - 6 -
Page 13 of 22
WELDING INSPECTION REPORT
TOTAL JOINT WELDED & REPAIR BY EACH WELDER
BEKAPAI 3 - SURFACE FACILITIES MODIFICATION AND DOGLEG INSTALLATION (EPCIC)
Contract Order : 4500010835
Period: 26 November - 25 December 2021
Welder Name & Stamp No.
AR-04 AR-11 AR-14 AR-23 AR-24 AR-27 AR-29 AR-30 AR-32 AR-35 Grand Total
HARYADI HENDRI ISMAIL ABDULLAH SUHERMAN HERMAN SUAIB WAHYU NUGROHO SUDIRMAN RISAL SAKRI
Date Remarks
Weld. Rep. Acc Weld. Rep. Acc Weld. Rep. Acc Weld. Rep. Acc Weld. Rep. Acc Weld. Rep. Acc Weld. Rep. Acc Weld. Rep. Acc Weld. Rep. Acc Weld. Rep. Acc Weld. Rep. Acc
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
Film
26-Nov-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
27-Nov-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
28-Nov-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
29-Nov-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30-Nov-21 - - - - - - 5 10 - - 5 10 - - - - - - - - - - - - 4 8 - - 4 8 6 12 - - 6 12 - - - - - - 8 16 - - 8 16 3 6 - - 3 6 - - - - - - 26 52 - - 26 52
01-Dec-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
02-Dec-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
03-Dec-21 1 3 - - 1 3 4 12 - - 4 12 - - - - - - - - - - - - 5 14 - - 5 14 12 24 - - 12 24 - - - - - - 6 12 - - 6 12 - - - - - - - - - - - - 28 65 - - 28 65
04-Dec-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
05-Dec-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
06-Dec-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
07-Dec-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 14 28 - - 14 28 - - - - - - 2 4 - - 2 4 - - - - - - - - - - - - 16 32 - - 16 32
08-Dec-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 12 24 - - 12 24 - - - - - - - - - - - - 12 24 - - 12 24
09-Dec-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
12-Dec-21 - - - - - - 22 42 - - 22 42 - - - - - - 15 30 - - 15 30 - - - - - - 4 8 - - 4 8 - - - - - - 1 2 - - 1 2 - - - - - - - - - - - - 42 82 - - 42 82
14-Dec-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
15-Dec-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
16-Dec-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
17-Dec-21 - - - - - - 3 6 - - 3 6 - - - - - - - - - - - - - - - - - - 6 12 - - 6 12 - - - - - - 9 18 - - 9 18 - - - - - - - - - - - - 18 36 - - 18 36
18-Dec-21 - - - - - - 7 14 - - 7 14 - - - - - - 13 26 - - 13 26 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 20 40 - - 20 40
19-Dec-21 - - - - - - 13 26 - - 13 26 - - - - - - 10 20 - - 10 20 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 23 46 - - 23 46
20-Dec-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
21-Dec-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
22-Dec-21 - - - - - - - - - - - - 20 40 - - 20 40 - - - - - - - - - - - - - - - - - - - - - - - - 1 2 - - 1 2 - - - - - - - - - - - - 21 42 - - 21 42
23-Dec-21 - - - - - - 6 12 - - 6 12 7 14 - - 7 14 - - - - - - - - - - - - - - - - - - - - - - - - 14 28 - - 14 28 - - - - - - - - - - - - 27 54 - - 27 54
24-Dec-21 - - - - - - 2 4 - - 2 4 11 22 - - 11 22 - - - - - - - - - - - - 15 30 - - 15 30 - - - - - - 6 12 - - 6 12 - - - - - - - - - - - - 34 68 - - 34 68
25-Dec-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9 18 - - 9 18 33 66 - - 33 66 - - - - - - - - - - - - - - - - - - 42 84 - - 42 84
26-Dec-21 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Weld. 1 3 - - 1 3 97 195 - - 97 195 38 76 - - 38 76 61 119 - - 61 119 9 22 - - 9 22 66 132 - - 66 132 33 66 - - 33 66 63 126 - - 63 126 3 6 - - 3 6 - - - - - - 371 745 - - 371 745
Rate 0.00% 100.00% 0.00% 100.00% 0.00% 100.00% 0.00% 100.00% 0.00% 100.00% 0.00% 100.00% 0.00% 100.00% 0.00% 100.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00% 100.00%
Page 14 of 22
WAHYUDI Y IMAN POHAN 0
Welding Inspector QA/QC Coordinator Project Manager PRJ / EXE /QC
Page 15 of 22
QUALITY DASHBOARD
Attachment
PT. ASTA REKAYASA UNGGUL
ATTACHMENT 2
PAINTING REPAIR RATE (PRR)
SUMMARY OF PAINTING REPAIR RATE
Project/OA no : Surface Facilities Modification & Dogleg Installation (EPCIC Project)
Total : 5 5 0 0% 0 0 0 0 0 0 #DIV/0!
Note : Acceptance criteria for adhesion test of each plate/test : maximum 1,75%
Total Tested: 5 Total Failed: 0 PRR: 0.0%
Test Plate No : #1 Pull Off Test Equipment/Type : Mechanical type (Elcometer 106-4) Date of Pull Off Test : 23 December 2021
Average DFT *** FRACTURE OF Failure (Adhesion / Cohesion) Result
Dolly Acceptance Criteria Pull Off Test Score
(µm) Substrate 1st coat 2nd coat 3rd coat 4th coat Glue ( Pass / Fail )
Evidence of Photos
ATTACHMENT 3
QUALITY NOTIFICATION (QN)
Quality Notification
MONITORING TABLE 2021
CONTRUCTION MAINTENANCE SERVICE
During the inspection it was found that TKY welding joint (3 jts) - CTR will be remove Weldment and re-weld with a
weather and E/I shelter structure were carried out by unqualified qualified welder.and tested welding with the MT
TKY welder method because of Non CJP welding. -
CTR Will provide additional Qualified Welder TKY
-CTR Provides
guidance to welders regarding the qualification range ,so
that each welder performs welding according to their
respective qualifications.
1 4500010835 2128/EGN/QN 30-Oct-21 - CTR will provide ID badge to each welder that lists 5-Nov-21 1 1 0 5-Nov-21 CLOSE ON TIME
the welder's qualifications. so that there are no errors
during production welding
TOTAL 1 1 0
Note:
• Remarks shall be filled to explain the reason why the target date is not achieved
Prepared By, Reviewed By, Acknowledged By, Acknowledged By, Verified By,
PT. Asta Rakayasa Unggul PT. Asta Rakayasa Unggul PT. Asta Rakayasa Unggul Pertamina Hulu Mahakam Pertamina Hulu Mahakam
ATTACHMENT 4
QC DOSSIER SUBMISION
QC Dossier Submission
MONITORING TABLE 2021
STATUS
N/A
1
TOTAL 0 0 0 0 0
Note:
• Remarks shall be filled to explain the reason why the target date is not achieved
• IRC Issuance Target Date is calculated from Job Completion Date added with 8 weeks
Prepared By, Reviewed By, Acknowledged By, Acknowledged By, Verified By,
PT. Asta Rekayasa Unggul PT. Asta Rekayasa Unggul PT. Asta Rekayasa Unggul Pertamina Hulu Mahakam Pertamina Hulu Mahakam