Note: All motor pump is off. Including pool and submersible pump.
This computation inculdes the Marine Barracks
Inspected by:
IDPM Francis Glenn Ramos
Lineman Eric Bacanto
Jay-Ar De Asis
Daluyon Electrical Analysis
Marine Barracks
24.024 kW-hr
24 HRS BILL ASSUMPTION
₱360.36
Daluyon Electrical Analysis
BASE ON METER READING
Note: All motor pump is off. Including pool and submersible pump.
This computation inculdes the Marine Barracks
Total Consumption
Time Initial Reading
2:00 pm 243959.64 kW-hr
5 kW
Time Final Reading
3:00 pm 243964.64 kW-hr
24 HRS KWH ASSUMPTION
120 kWhr
24 HRS BILL ASSUMPTION
₱1,800.00
Daluyon Electrical Analysis
FINDINGS
Findings
No proper wire piping in floating wires
Live wire inside the tree
Results
Results to electrical leakages that might cause
losses
Possible to start the fire due to no proper
Live Electrical Wires tubing
Solution
Rewiring and add proper pvc protection