String Volume Calculation Sheet - Sample

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

String Volume Calculation (Above Circ Sub)

Volume (bbl)
ID Length
Item
(in) (ft) [ ( ID x ID ) / 1029.4 ]
x Length
12.25 Bit
Motor
12.25 Roller Reamer
8.25 DC
12.25 Roller Reamer
Catcher Sub (Churchill)
Valve Sub (Churchill)
9 x 8.25 DC 3.000 270.00 2
8" Jar 2.750 30.00 0
3 x 8.25 DC 3.000 90.00 1
X-Over 2.812 3.81 0
15 x 5.5 HWDP 3.875 450.00 7
5.5 DP to Surface 4.778 5000.00 111

A String Vol (BBL) above Circ Sub 121

C Circulation Time after dropping SDD from time log 35


D Circulation Rate after dropping SDD from time log 300
E Circulation Rate after dropping SDD D / 42 7

F String Volume Circulated after dropping SDD CxE 250


G LCM Volume spotted from LCM Engg. 200

I LCM Volume left in Drill String G+A-F 71


[ ( ID x ID ) / 1029.4 ] x Length

1 BBL = 42 GALLON

BBL

mins
GPM
BPM

BBL
BBL

BBL
String Volume Calculation (Above Circ Sub)
Volume (bbl)
ID Length
Item
(in) (ft) [ ( ID x ID ) / 1029.4 ]
x Length
12.25 Bit
Motor
12.25 Roller Reamer
8.25 DC
12.25 Roller Reamer
6 Catcher Sub (Churchill)
7 Valve Sub (Churchill)
8 6 x 4" HWDP 2.563 186.06 1
9 X-Over 2.500 4.08 0
10 21 x 4" HWDP 2.563 656.41 4
11 X-Over 2.500 2.53 0
12 Jar 2.250 28.45 0
13 X-Over 2.500 4.11 0
14 2 x 4" HWDP 2.563 62.22 0
15 X-Over 2.500 2.23 0
16 4" DP 3.340 6788.35 74
17 X-Over 2.500 5.74 0
18 5.5" DP 4.670 6500.00 138

A String Vol (BBL) above Circ Sub 217

C Circulation Time after dropping SDD from time log 35


D Circulation Rate after dropping SDD from time log 300
E Circulation Rate after dropping SDD D / 42 7

F String Volume Circulated after dropping SDD CxE 250


G LCM Volume spotted from LCM Engg. 200

I LCM Volume left in Drill String G+A-F 167


[ ( ID x ID ) / 1029.4 ] x Length

BBL [ ( ID x ID ) / 1029.4 ] x Length in ft


BBL
BBL
BBL
BBL
BBL
BBL
BBL
BBL
BBL
BBL

BBL

mins
GPM
BPM

BBL
BBL

BBL

You might also like