Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

DRILLING FLUID SERVICES, MR, ONGC LTD

SHORT DPR
RIG: GD CHITRA WELL: WO_5#J DATE:  07.06.2022
FINAL TD: 2985 M LAST CSG: 20"/423M

PHASE: 17 1/2" PHASE TD: - 1850M DRILLED DEPTH: 500M.


PRESENT OPERATION: C/OUT SECOND CMT PLUG JOB AS PER PLAN FOR SIDE TRACKING. WOC.

NEXT OPERATION: TAG & TEST CMT PLUG, SIDE TRACK THE WELL FOR 17 1/2" PHASE DRILLING.

HOLE PROBLEM: 

PIT DETAILS:

PIT CAP VOL (BBL) MUD WT VIS (SEC) ACTIVE OR RESERVE


(BBL) (PPG)

1 475 300 10.4 50 RAW MUD


2 375
 3 375 322 10.1 52 GEL MUD
4 450 304 8.7 26 KCL SOLN
5 450 320 10 56 ACTIVE/GEL MUD
6 375 375 10.4 45 RAW MUD
7 375 304 8.7 27 KCL SOLN
8 450 304 8.7 26 KCL SOLN
SLUG pit 95 80 10 56 GEL MUD
PREMIX 95

CHEMICALS STOCK AND REQUIREMENT

S.NO OPENING RECEIVED CONSUMPT


CHEMICALS UNIT STOCK ION
1 BARYTE MT 156 9
2 BENTONITE MT 2
3 CAUSTIC SODA sx 121 2
4 SODA ASH sx 64 2
5 PAC- LV sx 280
6 PAC-R sx 400
7 XC POLYMER sx 54
8 KCL MT 3.5 3.5
9 PHPA sx 80
10 CaCO3 (Coarse) MT 0.2
11 CaCO3 (Medium) MT 0.75
12 CaCO3 (Fine)/Micro MT 4
13 LSP MT 0.25
14 NIF MT 2
15 DD Dr 4
16 SOLTEX MT 4
17 MICA MT 0
18 SAW DUST MT 1
19 CNS MT 1
20 NUT PLUG-FINE MT 0
21 NUT PLUG-MED MT 0
22 SPOTTING FLUID (W) Dr 0
23 SPOTTING FLUID (NW) Dr 0
24 ZINC CARBONATE sx 0
25 BIOCIDE J/C 0
26 POLYOL Dr 6
27 POLYAMINE (CHS) Dr 18
28 NORMAL SALT MT 0
ACID CORROSION
29 Kg 0
INHIBITOR
30 STOPLOSS (ONGC) sx 0
31 EP LUBE Dr 0
32 DEFOAM S J/CAN 1
33 ACETIC ACID J/Can 0
34 GEL SS-20 JB 0.5
35 SINGLE SACK LCM sx 0
36 STOPPIT (HLS) Sx 80
37 PGS JB 2
38
39
40
41
42

URGENT REQUIREMENT: KCL, PHPA, XC, PAC-R, PAC-LV, CHS, POLYOL, EP-LUBE, SF(NW), BENTONITE

NOTE: RECEIVED CHEMICALS FROM G S ANJALI(KCL-12JB, C/SODA-01 JB, S/ASH-01 JB, PHPA-02JB, PAC LV
07JB,PAC R-09 JB, POLYOL-01PLT, CHS-03PLT, SOLTEX-04JB) AS ON 05.06.22

OPERATIONAL PROBLEMS (MANPOWER/EQUIPMENT):
ONBOARD CREW DETAILS
Name (CPF No) Designation No. of Days Completed
ONGC
1. PRADEEP UPADHYAY (106630) FE. Chemist 10 Days
2. JAYANTAJIT BARUAH (106255) SUPTG CHEMIST 06 DAYS

Contract
TD

07.06.2022

TH: 500M.
DE TRACKING. WOC.

/2" PHASE DRILLING.

ACTIVE OR RESERVE

RAW MUD

GEL MUD
KCL SOLN
ACTIVE/GEL MUD
RAW MUD
KCL SOLN
KCL SOLN
GEL MUD

BALANCE REQUIREMEN
T
147
2
119
62 80
280
400
54 160
0 32
80 80
0.2 1
0.75 1
4
0.25 2
2
4
4 2
0
1
1
0
0
0 6
0 6
0
0 12
6 18
18
0
0
0
0 12
1 12
0
0.5
0
80
2

LUBE, SF(NW), BENTONITE

SH-01 JB, PHPA-02JB, PAC LV-


No. of Days Completed

10 Days
06 DAYS

You might also like