SHORT DPR
RIG: GD CHITRA WELL: WO_5#J DATE: 07.06.2022
FINAL TD: 2985 M LAST CSG: 20"/423M
NEXT OPERATION: TAG & TEST CMT PLUG, SIDE TRACK THE WELL FOR 17 1/2" PHASE DRILLING.
HOLE PROBLEM:
PIT DETAILS:
URGENT REQUIREMENT: KCL, PHPA, XC, PAC-R, PAC-LV, CHS, POLYOL, EP-LUBE, SF(NW), BENTONITE
NOTE: RECEIVED CHEMICALS FROM G S ANJALI(KCL-12JB, C/SODA-01 JB, S/ASH-01 JB, PHPA-02JB, PAC LV
07JB,PAC R-09 JB, POLYOL-01PLT, CHS-03PLT, SOLTEX-04JB) AS ON 05.06.22
OPERATIONAL PROBLEMS (MANPOWER/EQUIPMENT):
ONBOARD CREW DETAILS
Name (CPF No) Designation No. of Days Completed
ONGC
1. PRADEEP UPADHYAY (106630) FE. Chemist 10 Days
2. JAYANTAJIT BARUAH (106255) SUPTG CHEMIST 06 DAYS
Contract
TD
07.06.2022
TH: 500M.
DE TRACKING. WOC.
ACTIVE OR RESERVE
RAW MUD
GEL MUD
KCL SOLN
ACTIVE/GEL MUD
RAW MUD
KCL SOLN
KCL SOLN
GEL MUD
BALANCE REQUIREMEN
T
147
2
119
62 80
280
400
54 160
0 32
80 80
0.2 1
0.75 1
4
0.25 2
2
4
4 2
0
1
1
0
0
0 6
0 6
0
0 12
6 18
18
0
0
0
0 12
1 12
0
0.5
0
80
2
10 Days
06 DAYS