Rig: GD Chitra 14.06.2022 LAST CSG: 20"/423M Well Date Final TD: PHASE: 17 1/2" Phase TD: Drilled Depth: 540M. Present Operation
Rig: GD Chitra 14.06.2022 LAST CSG: 20"/423M Well Date Final TD: PHASE: 17 1/2" Phase TD: Drilled Depth: 540M. Present Operation
Rig: GD Chitra 14.06.2022 LAST CSG: 20"/423M Well Date Final TD: PHASE: 17 1/2" Phase TD: Drilled Depth: 540M. Present Operation
SHORT DPR
RIG: GD CHITRA WELL: WO_5#J DATE: 14.06.2022
FINAL TD: 2985 M LAST CSG: 20"/423M
HOLE PROBLEM:
PIT DETAILS:
NOTE:
OPERATIONAL PROBLEMS (MANPOWER/EQUIPMENT):
ONBOARD CREW DETAILS
Name (CPF No) Designation No. of Days Completed
ONGC
1. JAYANTAJIT BARUAH (106255) SUPTG CHEMIST 13DAYS
Contract
TD
14.06.2022
TH: 540M.
2022 TO DELIVER MUD CHEMICALS
ANARA PRIDE.
ACTIVE OR RESERVE
BALANCE REQUIREMEN
T
132 50
6 10
17
60 80
230
307
148 160
19 25
160
0.2 1
0.75 1
4
0.25 2
2
4
4 2
0
1
1
0
0
0 6
0 6
0
0 12
6 18
18
0
0
0
0 12
1 12
0
0.5
0
80
2
No. of Days Completed
13DAYS